Home > Epson > Printer > Epson L210 Service Manual

Epson L210 Service Manual

Here you can view all the pages of manual Epson L210 Service Manual. The Epson manuals for Printer are available online for free. You can easily download all the documents as PDF.

Page 21

L200/L201/L100/L101Revision A
ConfidentialDisassembly/AssemblyDisassembling/Assembling Flowchart21 Flowchart 1-4. Disassembling Flowchart of Printer Mechanism Part (2)
Porous Pad Front 
Paper Guide
------
 (p 25)
Power Supply 
Unit
1---
 (p 24)  (p 34)
S1
Roller Idler Pick 
Assy
------
 (p 40)
Wa s t e  In k  P a d s
---6
  (p 34)
CR Motor
2---
 (p 31)  (p 34)
S5
B
Printhead
3---
 (p 31)  (p 34)
S4
Waste Ink Tray 
Assy
2---
 (p 26)S1
Tube Holder Top/
Tube Holder 
Lower
---5
 (p 28)
ScrewCR Cover
22
 (p...

Page 22

L200/L201/L100/L101Revision A
ConfidentialDisassembly/AssemblyDisassembling/Assembling Flowchart22 Flowchart 1-5. Disassembling Flowchart of Printer Mechanism Part (3)
Carriage
------
 (p 25)  (p 31)
1
Carriage Assy
------
  (p 34)PCB Encoder
2---
---S7
Timing Belt
------
---
Head FFC
------
 (p 32)
CR MotorPrinthead
(p 20)
C
EJ Frame Assy
------
 (p 27)
EJ Roller
------
 (p 39)  (p 34)Waste Ink Pads(for flushing)
------
---
Cover Flushing
1---
---S1
Ink Tube Guide 
2nd
22
 (p 27)S2
EJ Roller Gear
Bottom...

Page 23

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit23
Confidential1.3
Details of Disassembling/Reassembling by Parts/Unit
Panel Unit (L200/L201)
Do not lift the Panel Unit too fast, since the Panel FFC is connected 
to the back of the Panel Unit.
Panel UnitPanel FFC
Document Pad (L200/L201)
When installing the Document Pad, follow the procedure below.
1. Place the Document Pad with the side where the double-sided 
tape attached upward on the document...

Page 24

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit24
Confidential
Power Supply Unit
Route the Power Supply Unit cable through the hole of the Frame 
Base.
Power Supply Unit
Power Supply Unit 
Hole
Power Supply Unit Cable
FFC Cover
Insert the folded part of the Head FFC into the groove of the FFC 
Cover.
FFC Cover
Head FFC
Groove
FFC Cover
Groove
Head FFC
Cap Unit
When installing the Cap Unit, follow the instruction below.
1. Temporarily secure the...

Page 25

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit25
Confidential
LD Roller Assy / LD Roller
„When removing the LD Roller Assy, follow the procedure below.
1. Release the hooks (x2) and remove the Gear 23T.
2. Release the hooks (x2) and slide the Shaft Gear 24T to the 0-digit side until the concave section of the gear comes to the bearing part of the 
Pick Assy.
3. Remove the LD Roller Assy upward.
„When removing the LD Roller, remove the screws (x2)...

Page 26

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit26
Confidential
Gear Pump Idle/ Gear Pump/ Bracket Pump/ Roller Pump/ Waste Ink Tube/ Pump Housing
When reassembling the Pump Assy, follow the instructions below.
1. Make six points on the Waste Ink Tube.
2. Insert the Waste Ink Tube in the hole of the Pump Housing with the red line of the tube set as shown in the figure above.
3. Secure point C of the Waste Ink Tube to the point C of the Pump Housing.
4....

Page 27

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit27
Confidential
Right Cover / Left Cover / Bottom Cover
The figures above indicate the hooks and ribs that secure the parts.
Hook
Rib
Right Cover
Left Cover
Bottom Cover
CR Front
„Align the positioning holes (x2) of the CR Front with the 
dowels (x2) of the Carriage.
„Tighten the screws in the order indicated in the figure above.
1
2
C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm)
Positioning Hole and Dowel
CR...

Page 28

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit28
ConfidentialTube Valve Holder Rear / Tube Valve Holder Front
„When installing the Tube Valve Holder Front, align the blue 
lines (the red lines for L100/L101) of the ink tubes in the same 
direction as shown in the figure above, and route them through 
the grooves of the Tube Valve Holder Front.
„Tighten the screws in the order indicated in the figure above.
1
C.B.P-TITE SCREW 3x6 (5.0 ~ 6.0 kgf·cm)
2...

Page 29

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit29
Confidential
Tube Guide Plate Support
Refer to the figure above and follow the procedure below when installing the Tube Guide Plate Support.
1. Make sure that the hole B of the Tube Guide Plate Support comes on the right front side as seen from the front of the printer, and route the Tube 
Guide Plate Support through the hole A (x2) of the Tube Guide Plate as shown in the “OK” image above. 
2. Route...

Page 30

L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit30
Confidential
Upper Housing Assy / Ink Supply Holder Assy (L100/L101)
„Do not lift the Upper Housing Assy too fast, since the Panel FFC is connected to the back of the Upper Housing Assy.
„Be careful not to damage the hooks (x2) on the bottom left because these cannot be seen when removing.Follow the procedure below when removing the Upper Housing Assy.
1. Remove the screws (x2) that secure the Ink...
Start reading Epson L210 Service Manual

Related Manuals for Epson L210 Service Manual

All Epson manuals