Home > Epson > Printer > Epson L210 Service Manual

Epson L210 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Epson L210 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1734 Epson manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							L200/L201/L100/L101Revision A
    ConfidentialDisassembly/AssemblyDisassembling/Assembling Flowchart21 Flowchart 1-4. Disassembling Flowchart of Printer Mechanism Part (2)
    Porous Pad Front 
    Paper Guide
    ------
     (p 25)
    Power Supply 
    Unit
    1---
     (p 24)  (p 34)
    S1
    Roller Idler Pick 
    Assy
    ------
     (p 40)
    Wa s t e  In k  P a d s
    ---6
      (p 34)
    CR Motor
    2---
     (p 31)  (p 34)
    S5
    B
    Printhead
    3---
     (p 31)  (p 34)
    S4
    Waste Ink Tray 
    Assy
    2---
     (p 26)S1
    Tube Holder Top/
    Tube Holder 
    Lower
    ---5
     (p 28)
    ScrewCR Cover
    22
     (p 27)S9
    Tu b e  G u i d e  P l a t e
    ---4
    ---
    Tube Pressing 
    Plate
    Tube Holder Top/
    Tube Holder 
    LowerAdapter Assy
    ---1
      (p 28)FFC Cover
    FFC Cover
    ---3
     (p 24)
    CR Front
    22
     (p 27)S9
    Tube Assy
    ------
     (p 28)  (p 34)
    Gear Pump Idle
    ---1
     (p 26)
    Gear Pump
    ------
     (p 26)
    Bracket Pump
    ------
     (p 26)
    Pump Housing
    ------
     (p 26)
     Waste Ink Tube
    ------
     (p 26)
    Lever Pick Clutch
    ------
     (p 26)
    Roller Pump
    ------
     (p 26)
    (p 20)
    2
    Joint
    ---2
     (p 28)
    Tube Pressing 
    Plate
    1---
    ---S9
    Screw
    ------
     (p 28)S11
    Holder Contact
    ------
    ---
    L200/L201: (p 18)
    L100/L101: (p 19)
    Tube Guide Plate 
    Support
    ------
     (p 29)
    Screw type/torque listSymbol
    Screw type
    Torque
    C.B.P-TITE SCREW 3x8 5.0 
    ± 0.5 kgf·cm
    C.B.P-TITE SCREW 3x10
    5.0 
    ± 0.5 kgf·cm
    C.B.S-TITE SCREW 3x5 7.5 ± 0.5 kgf·cm
    C.B.P-TITE SCREW 2.6x8
    4.0 
    ± 0.25 kgf·cm
    C.P.(P1) SCREW 2.6x3.5 3.5 ± 0.25 kgf·cm
    C.B.S-TITE SCREW 2x5
    3.5 
    ± 0.25 kgf·cm
    C.B.P-TITE SCREW 2x6 3.0 ± 0.25 kgf·cm
    C.F.B-TITE SCREW 2.6x6
    3.0 
    ± 0.25 kgf·cm
    C.B.P TITE SCREW 2.5x5 5.0 ~ 6.0 kgf·cm
    C.B.P TITE SCREW 3x6
    5.0 ~ 6.0 kgf·cm
    C.B.P TITE SCREW 2.6x16 5.0 ~ 6.0 kgf·cm
    S1S2S3S4S5S6S7S8S9S10S11
    L200/L201 specific parts/unitL100/L101 specific parts/unitCommon parts/unit 
    						
    							L200/L201/L100/L101Revision A
    ConfidentialDisassembly/AssemblyDisassembling/Assembling Flowchart22 Flowchart 1-5. Disassembling Flowchart of Printer Mechanism Part (3)
    Carriage
    ------
     (p 25)  (p 31)
    1
    Carriage Assy
    ------
      (p 34)PCB Encoder
    2---
    ---S7
    Timing Belt
    ------
    ---
    Head FFC
    ------
     (p 32)
    CR MotorPrinthead
    (p 20)
    C
    EJ Frame Assy
    ------
     (p 27)
    EJ Roller
    ------
     (p 39)  (p 34)Waste Ink Pads(for flushing)
    ------
    ---
    Cover Flushing
    1---
    ---S1
    Ink Tube Guide 
    2nd
    22
     (p 27)S2
    EJ Roller Gear
    Bottom CoverVa l v e  L e v e r
    Tube Valve Holder 
    RearTube Valve Holder 
    Front
    Valve Assy
    ---2
     (p 28)
    Ink Supply Tank 
    Assy
    ---7
      (p 26)
    Ink Tube Guide 
    1st
    12
     (p 30)  (p 27)
    S9
    FFC CoverHolder ContactCR Front
    Tube Pressing 
    Plate
    Cap
    L200/L201: (p 18)
    L100/L101: (p 19)
    To p  C o v e rRight Cover
    Left Cover
    Screw type/torque listSymbol
    Screw type
    Torque
    C.B.P-TITE SCREW 3x8 5.0 
    ± 0.5 kgf·cm
    C.B.P-TITE SCREW 3x10
    5.0 
    ± 0.5 kgf·cm
    C.B.S-TITE SCREW 3x5 7.5 ± 0.5 kgf·cm
    C.B.P-TITE SCREW 2.6x8
    4.0 
    ± 0.25 kgf·cm
    C.P.(P1) SCREW 2.6x3.5 3.5 ± 0.25 kgf·cm
    C.B.S-TITE SCREW 2x5
    3.5 
    ± 0.25 kgf·cm
    C.B.P-TITE SCREW 2x6 3.0 ± 0.25 kgf·cm
    C.F.B-TITE SCREW 2.6x6
    3.0 
    ± 0.25 kgf·cm
    C.B.P TITE SCREW 2.5x5 5.0 ~ 6.0 kgf·cm
    C.B.P TITE SCREW 3x6
    5.0 ~ 6.0 kgf·cm
    C.B.P TITE SCREW 2.6x16 5.0 ~ 6.0 kgf·cm
    S1S2S3S4S5S6S7S8S9S10S11
    L200/L201 specific parts/unitL100/L101 specific parts/unitCommon parts/unit
    Ink Supply 
    Holder Assy
    24
     (p 30)  (p 30)
    S10 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit23
    Confidential1.3
    Details of Disassembling/Reassembling by Parts/Unit
    Panel Unit (L200/L201)
    Do not lift the Panel Unit too fast, since the Panel FFC is connected 
    to the back of the Panel Unit.
    Panel UnitPanel FFC
    Document Pad (L200/L201)
    When installing the Document Pad, follow the procedure below.
    1. Place the Document Pad with the side where the double-sided 
    tape attached upward on the document glass aligning its corner 
    with the origin position.
    2. Close the Document Cover to attach the Document Pad.
    Standard lineDouble-sided tape
    Document CoverDocument Pad
    Origin Position
    Scanner Unit (L200/L201)
    Do not lift the Scanner Unit too fast, since the Panel FFC, Scanner Motor cable and Scanner FFC are connected to the rear side of the Scanner Unit.Tighten the screws in the order indicated in the figure above.
    3
    Panel FFC
    Scanner FFCScanner Motor cable
    Scanner 
    Unit
    Scanner Unit
    1
    2
    4
    C.B.P-TITE SCREW 3x10 (5.0 ± 0.5 kgf·cm)
    CIS (L200/L201)
    Be careful not to lose the Spacer because it comes off easily when disassembling the CIS.„When installing the spacers, be sure to place them with the cutout facing inward.
    „Align the toothed side of the Timing Belt with the same shaped rib of the backside of the CIS, and secure the Timing Belt with Torsion Spring. 
    Spacer
    Backside of the CIS
    Timing Belt
    Torsion Spring
    Toothed 
    side
    CIS
    Main Board
    Take care not to damage the PE Sensor Lever.„Align the ribs (x3) of the Main Frame with the cutouts of the Main Board.
    „Screw one side of the grounding wire (w/ ferrite core) together with the plate of the PF Motor, and the other side together with the Main Board.
    C.B.S-TITE SCREW 3x5 (7.5 ± 0.5 kgf·cm)C.B.P-TITE SCREW 3x8 (5.0 ± 0.5 kgf·cm)
    Main Board
    PE Sensor Lever
    Rib
    Main Board
    Grounding wire
    Plate of PF Motor 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit24
    Confidential
    Power Supply Unit
    Route the Power Supply Unit cable through the hole of the Frame 
    Base.
    Power Supply Unit
    Power Supply Unit 
    Hole
    Power Supply Unit Cable
    FFC Cover
    Insert the folded part of the Head FFC into the groove of the FFC 
    Cover.
    FFC Cover
    Head FFC
    Groove
    FFC Cover
    Groove
    Head FFC
    Cap Unit
    When installing the Cap Unit, follow the instruction below.
    1. Temporarily secure the Cleaner Case Spring to the hook and dowel of the Frame Base.
    2. Insert the Waste Ink Tube to the Cap Unit until point A (p 26) is hidden.
    3. Install the Cap Unit to the Frame Base, and attach the Cleaner Case Spring which is secured temporary earlier to the hook on the Cap Unit.
    4. Insert one leg of the Cleaner Lever Spring to the hole of the Frame Base, and secure it to the dowel of the Frame Base, then secure the other leg 
    to the protrusion of the Lever Cleaner.
    Cleaner Lever Spring
    Dowel
    Hole
    Lever Cleaner
    Protrusion
    Waste Ink Tube
    Point A
    Cleaner Case Spring
    Hook
    Cleaner Case Spring
    Cap Unit
    Cap Unit
    Dowel for temporarily secure
    Frame Base
    Step 1
    Step 2
    Step 3
    Step 4
    Hook
    Main Frame
    „When installing the Grounding Spring of the lower part of the 80-digit side, follow the instruction below. 
    1. Insert the tip of the spring to the hole of the Frame Base.
    2. Attach the eye of the spring to the Bracket and secure the other eye to the hook on the Main Frame.
    „When installing the Extension Spring of the lower part of the 0-digit side, attach the tip of the Extension Spring to the hole of the Frame Base 
    first. Then attach the leg of the spring to the cutout of the Main Frame from the left side as seen from the rear of the printer.
    „Tighten the screws in the order indicated in the figure above.
    Hook
    Grounding Spring
    Hole
    Bracket
    Main 
    FrameLower part of 80-column side
    TBD
    1
    Main Frame
    2
    3
    4
    Main Frame
    Left Side
    Right Side
    C.B.P-TITE SCREW 3x8 (5.0 ± 0.5 kgf·cm)C.B.S-TITE SCREW 3x5 (7.5 ± 0.5 kgf·cm)
    Cutout
    Hole
    Lower part of 0-column side
    Extension Spring
    CR Scale
    „When installing the CR Scale, confirm that the arrows on both 
    the edges of the CR Scale face upward.
    „When installing the Extension Spring, be sure to attach it with 
    its leg facing the rear of the printer.
    CR Scale
    Extension Spring 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit25
    Confidential
    LD Roller Assy / LD Roller
    „When removing the LD Roller Assy, follow the procedure below.
    1. Release the hooks (x2) and remove the Gear 23T.
    2. Release the hooks (x2) and slide the Shaft Gear 24T to the 0-digit side until the concave section of the gear comes to the bearing part of the 
    Pick Assy.
    3. Remove the LD Roller Assy upward.
    „When removing the LD Roller, remove the screws (x2) shown in the figure above.When install the Torsion Spring, make sure to align the leg to the position as shown above.
    Pick Assy
    Step 2, 3
    Shaft Gear 24T
    Concave section
    Bearing
    C.B.P-TITE SCREW 3x8 (TBD)C.F.B-TITE SCREW 3x5 (TBD)
    Hook
    Step 1
    Gear 23T
    Step 2
    Shaft Gear 24T
    LD Roller Assy
    LD Roller
    LD Roller AssyTorsion Spring
    Leg of the
     spring
    Housing Buckler
    „When installing the Friction Buckler and Friction Buckler R to the Housing Buckler, pay attention to the following instructions.
    • Remove the Sheet BF2-A on the rear side of the Friction Buckler to be replaced, and secure the removed sheet with double-sided tape to the 
    new Friction Buckler.
    • Install the friction bucklers to the Housing Bucklers with the cutouts facing forward.
    „Install the buckler to the position as shown above.
    Friction Buckler R
    Housing Bucklers
    Friction Buckler
    Cutouts
    Friction Buckler
    Friction Buckler R
    Friction Buckler
    Sheet BF2-A
    Double-sided 
    tape
    Housing Buckler (Friction Buckler)
    Housing Buckler (Friction Buckler R)
    Carriage
    When replacing the Carriage, be careful about the following and 
    remove the Grounding Plate, Guide Carriage, Compression Springs 
    from the Carriage to be replaced, then attach them to the new 
    Carriage as shown in the figure above.
    „Insert the protrusion of the Grounding Plate to the hole of the 
    Carriage, and align the dowels (x3) of the Carriage with the 
    positioning holes (x3) of the Grounding Plate.
    „Secure hooks (x2) of the Guide Carriage by attaching them on 
    the holes (x2) of the Carriage.
    Grounding PlateGuide CarriageCompression Spring
    Positioning Hole and Dowel
    Hook
    Protrusion
    Compression Spring
    Porous Pad Front Paper Guide
    When installing the Porous Pad Front Paper Guide, align the pad 
    with the ribs and protrusions of the Platen. After installing the pad, 
    make sure to fit it evenly 1.5mm lower than the standard surface.
    Standard surface:
    In the area with concaves and convexes on the 
    Porous Pad Front Paper Guide, use the level 
    of the concave section as a standard surface.
    Rib
    Protrusion
    Jam Cover
    When removing the Jam Cover, be careful not to lose the spring 
    installed to the dowel on the right side.
    Jam Cover
    Spring
    Jam Cover
    USB Cover
    The USB Cover cannot be re-used once it is removed. Whenever 
    the cover is removed, make sure to replace it with a new one.When removing the USB Cover, cut the hook securing the USB 
    Cover with a nipper. Be careful not to damage the Upper Housing 
    then.
    Hook
    USB Cover 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit26
    Confidential
    Gear Pump Idle/ Gear Pump/ Bracket Pump/ Roller Pump/ Waste Ink Tube/ Pump Housing
    When reassembling the Pump Assy, follow the instructions below.
    1. Make six points on the Waste Ink Tube.
    2. Insert the Waste Ink Tube in the hole of the Pump Housing with the red line of the tube set as shown in the figure above.
    3. Secure point C of the Waste Ink Tube to the point C of the Pump Housing.
    4. Secure point D of the Waste Ink Tube to the point D of the Pump Housing.
    5. Install the Roller Pump to the Bracket Pump.
    6. Set the Waste Ink Tube inside the Bracket Pump, and install the Bracket Pump to the Pump Housing.
    7. Rotate the Bracket Pump shaft and make sure that the Roller Pump shaft moves to both ends in the groove.
    8. Make sure that point D is placed in the correct position.
    9. Install the Gear Pump.
    10. Install the Gear Pump Idle.
    11. Install the Lever Pick Clutch.
    Step 10, 11Lever Pick Clutch
    Gear Pump Idle
    Step 7Roller Pump shaft
    GrooveBracket Pump shaft
    Step 6
    Pump Housing
    Bracket Pump
    Waste Ink Tube
    Pump Housing
    Point DStep 4, 8
    Step 2,3
    Point C
    Pump Housing
    Waste Ink Tube
    Step 1
    Waste Ink Tube ABC D EF
    10
    ±1 mm
    110.5
    ±1 mm 110
    ±1 mm 39
    ±1 mm10
    ±1 mm
    19
    ±1 mm
    Step 5
    Bracket Pump
    Roller Pump
    Step 9
    Gear Pump
    Cap Unit sideWaste Ink Tray Assy side
    Pump Assy
    „Route the Ink Tube along the ribs on the Frame Base.
    „After installing the Ink Tube, make sure that no part of the tube 
    is pressed flat.
    Rib
    Waste Ink Tube
    Waste Ink Tray Assy
    When installing the Waste Ink Tube, pay attention to the following 
    instructions.
    „Align and secure the point E (p 26) of the Waste Ink Tube to 
    the hook on the Frame Base.
    „Insert the Holder Tube up to the point F (p 26) of the Waste Ink 
    Tube, and insert the holder into the Duct Tube End.
    Waste Ink Tube
    Point E
    Point F
    Holder Tube
    Waste Ink Unit
    Hook
    Duct Tube End
    Holder Tube
    Ink Supply Tank Assy
    Be careful not to damage or peel off the film of the Ink Supply 
    Tank Assy.To make disassembling the Ink Supply Tank Assy easier, push 
    slightly the part A of the Ink Supply Tank shown in the figure 
    above to release the hooks.When assembling the Ink Supply Tank Assy, attach them according 
    to their color in the order of the indications on the Top Cover.
    Film
     Ink Supply Tank Assy
    Top coverBk
    M
    Y
    C
    Part A
    Valve Lever
    In order to prevent ink spill, make sure to close the Valve Lever 
    before disassembling. (p 10)When removing the Valve Lever, follow the instructions below.
    1. Remove the Ink Supply Tank Assy from the Housing.
    2. Insert the flathead precision screwdriver by the Tube Valve 
    Holder Rear as shown in the figure above.
    3. Release the hook and remove the Valve Lever.
    Flathead 
    precision 
    screwdriver
    Tube Valve 
    Holder Rear
    Hook
    Valve Lever 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit27
    Confidential
    Right Cover / Left Cover / Bottom Cover
    The figures above indicate the hooks and ribs that secure the parts.
    Hook
    Rib
    Right Cover
    Left Cover
    Bottom Cover
    CR Front
    „Align the positioning holes (x2) of the CR Front with the 
    dowels (x2) of the Carriage.
    „Tighten the screws in the order indicated in the figure above.
    1
    2
    C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm)
    Positioning Hole and Dowel
    CR Front
    Carriage
    CR Cover
    „Tighten the screws in the order indicated in the figure above.
    „After installing the CR Cover, move the Carriage from side to 
    side to make sure that the Tube Assy does not apply extra load 
    of carriage movement.
    1
    C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm)
    2
    CR Cover
    Carriage
     Tube Assy
    Ink Tube Guide 1st
    „When installing the Ink Tube Guide 1st, align the blue lines of the ink tubes (the red lines for L100/L101) in the same direction as shown in the 
    figure above, and be careful not to let the ink tubes go slack on the bottom of the Ink Tube Guide 1st.
    „After securing the Ink Tube Guide 1st, pull the ink tubes from the Ink Supply Tank Assy side to make sure that the ink tubes are not caught.
    „Attach acetate tape (x2) in the positions shown above to secure the Ink Tube Guide 1st.
    Ink Tube Guide 1st
     Ink Tubes
    Ink Tube Guide 1st
     Ink Tubes
    C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm)
    Ink Tube Guide 1st
    Acetate tape (18 mm x 50 mm)Front side
    Acetate tape (18 mm x 50 mm)Left side
    Ink Tube Guide 2nd / EJ Frame Assy
    „Align the ribs on the left/right side of the Ink Tube Guide 2nd with the frame as shown in the figure above.
    „Attach acetate tape in the position shown above to secure the Ink Tube Guide 2nd.
    „Tighten the screws of the Ink Tube Guide 2nd together with the EJ Frame Assy in the order indicated in the figure above.
    Bottom left
    Acetate tape (18 mm x 30 mm)
    2
    C.B.P-TITE SCREW 3x10 (5.0 ± 0.5 kgf·cm)
    1
    Ink Tube Guide 2ndEJ Frame Assy
    Rib
    Bottom right 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit28
    ConfidentialTube Valve Holder Rear / Tube Valve Holder Front
    „When installing the Tube Valve Holder Front, align the blue 
    lines (the red lines for L100/L101) of the ink tubes in the same 
    direction as shown in the figure above, and route them through 
    the grooves of the Tube Valve Holder Front.
    „Tighten the screws in the order indicated in the figure above.
    1
    C.B.P-TITE SCREW 3x6 (5.0 ~ 6.0 kgf·cm)
    2
    Tube Valve Holder Front
    Grooves
     Ink TubesTube Valve Holder Rear
    Tu b e  H o l d e r  To p  /  Tu b e  H o l d e r  L o w e r„Align the positioning holes (x2) of the Tube Guide Plate with 
    the dowels (x2) of the Tube Holder Top.
    „
    Route the ink tubes while avoiding the rib of the Tube Holder 
    Lower to prevent the tubes from getting caught by the tube holders.
    „Make sure to route the ink tubes as shown in the figure above 
    when installing the Tube Holder Top/Tube Holder Lower.
    „Route the ink tubes over the films of the Adapter Assy.
    C.B.P-TITE SCREW 2.6x16 (5.0 ~ 6.0 kgf·cm)CyanYellow
    BlackMagenta
    Tube Holder Top/
    Tube Holder Lower
    Film
     Ink Tubes
    Tube Holder TopTube Guide Plate
    Positioning hole 
    and dowel
    Tube Holder LowerRib
    Adapter Assy
    Be careful not to damage or peel off the film of the Adapter Assy.When installing the ink tubes to the Adapter Assy, insert the ink 
    tubes with their red lines facing upward as shown in the figure 
    above.Film Adapter Assy
    Opening for Ink Tubes
     Ink Tubes
    Joint
    „Align the red lines and blue lines (the other red lines for L100/
    L101) respectively in the same direction as shown in the figure 
    above, and insert them to the joint to the full to its base.
    „Be careful not to damage the ink tubes and joint.
    Valve Assy 
    sideValve Assy 
    side
    Tube Assy 
    sideTube Assy 
    side
    Front
     Joint Joint
    Back
    Tube Assy
    „Before installing the Tube Assy, align the positioning holes (x2) of the Tube Guide Plate with the dowels (x2) of the Ink Tube Guide 2nd.
    „When installing the Tube Assy, attach the Clamps (x2)/Tube Holder Top/Tube Holder Lower/Tube Guide Plate in the positions shown in the 
    figure above.
    „When installing the Tube Assy, align the red lines of the ink tubes in the same direction as shown in the figure above, and attach them without 
    any slack.
    190 ± 1 mm
    257 ± 1 mm
    335 ± 1 mm
    420 ± 4.2 mm or 10% toleranceBlack
    Magenta
    Yellow
    Cyan
    Joint side
    Adapter Assy 
    side
    Tube Guide Plate
    Clamps (x2)
    Tube Holder Top/
    Tube Holder Lower
    Tube Guide Plate
    Tube Holder Top/
    Tube Holder Lower
    Clamps (x2)
     Joint
     Tube Assy
    Ink Tube Guide 2nd
    Tube Guide Plate
    Positioning hole and dowel
    Va l v e  A s s y
    „When installing the Valve Assy, attach the Clamp on the position shown in the figure above.
    „When installing the Valve Assy, align the blue lines of the ink tubes (the red lines for L100/L101) in the same direction as shown in the figure 
    above, and route them through the holes of the Ink Supply Tank Assy.
    „When installing the Valve Assy, secure it with the hooks (x2) of the Ink Supply Tank Assy.
    165 ± 1 mm
    L200/L201: 310 mm
    L100/L101: 290 mm 
    380 mm 400 mmL100/L101 L200/L201
    350 mm 370 mm
    325 mm 345 mm
    325 mm 345 mm
    Black
    Magenta
    Yellow
    Cyan
    Clamp
    Valve case
    Valve caseTube Assy 
    side
    Ink Supply Tank 
    Assy side
    Hole
    Length of Ink Tube
     Joint
     Ink Supply Tank Assy
     Ink Tube
    Valve Assy
     Ink Supply Tank Assy
    Hook 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit29
    Confidential
    Tube Guide Plate Support
    Refer to the figure above and follow the procedure below when installing the Tube Guide Plate Support.
    1. Make sure that the hole B of the Tube Guide Plate Support comes on the right front side as seen from the front of the printer, and route the Tube 
    Guide Plate Support through the hole A (x2) of the Tube Guide Plate as shown in the “OK” image above. 
    2. Route the ink tubes along with the Tube Guide Plate.
    3. Insert the section A of the Tube Guide Plate Support into the hole C of the Tube Guide Plate Support up from the bottom as shown in the “OK” 
    image above to secure it
    OK
    Section A
    Hole C
     Ink Tube
    NG
    Section A
    Hole C
     Ink Tube
    Tube Guide Plate Support
    Hole C
    Hole B
    Hole C
    Hole B
    Section A
    Section A
    Hole A
    NGOK
    Tube Guide Plate
    Tube Guide Plate Support
    Cross-
    section
    Tube Guide Plate
    Hole A
    Tube Guide Plate
    Refilling Ink Label (L200/L201)
    Attach the Refilling Ink Label on the position shown in the figure 
    above.
    8.0 mm
    Refilling Ink Label
    16.5 mm
    30.5 mm
    Valve Position Label
    Attach the Valve Position Label on the position shown in the figure 
    above.
    6.4 mm
    7.5 mm
    7.5 mm
    Valve Position Label
    Middle Housing (L200/L201)
    When replacing the Middle Housing, peel off the Voluntary Label 
    from the old housing and attach it to the new housing as specified 
    in the figure above.
    Left sideVoluntary Label
    10.0 mm
    45.0 mm
    Middle Housing
    Ink Supply Holder Assy (L200/L201)When installing the Ink Supply Holder Assy, align the hooks (x2) 
    with the hole of the Middle Housing, and tighten the screws in the 
    order indicated in the figure above.
    1
    C.B.P-TITE SCREW 3x6 (5.0 ~ 6.0 kgf·cm)
    2
    Ink Supply Holder Assy
    Hook
    Middle Housing
    Ink Tube Guide 1st / Ink Supply Holder Assy (L200/L201)
    Follow the procedure below when removing the Ink Supply Holder Assy / Ink Tube Guide 1st.
    1. Remove the screws (x2) that secure the Ink Supply Holder Assy. (p 29)
    2. Peel off the acetate tape (x2) that secure the Ink Tube Guide 1st. (p 27)
    3. Remove the screw (x1) that secures the Ink Tube Guide 1st.
    4. Release the hooks (x2) that secure the Ink Tube Guide 1st, and remove it from the frame.
    5. After confirming the Valve is closed, disconnect the Ink Tubes from the Joint. (p 10)
    6. Pull out the Ink Tubes from the holes of the Middle Housing / Ink Supply Holder Assy / Ink Tube Guide 1st, and remove the Ink Supply Holder 
    Assy / Ink Tube Guide 1st.
    C.B.P-TITE SCREW 2.5x5 
    (5.0 ~ 6.0 kgf·cm)
    Ink Tube Guide 1st
    Hook
     Joint
    Ink Tube Guide 1st
    Ink Supply Holder Assy
    Middle Housing
    Ink Tube Guide 1st
    Holes
     Ink Tube
     Ink Tube 
    						
    							L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit30
    Confidential
    Upper Housing Assy / Ink Supply Holder Assy (L100/L101)
    „Do not lift the Upper Housing Assy too fast, since the Panel FFC is connected to the back of the Upper Housing Assy.
    „Be careful not to damage the hooks (x2) on the bottom left because these cannot be seen when removing.Follow the procedure below when removing the Upper Housing Assy.
    1. Remove the screws (x2) that secure the Ink Supply Holder Assy.
    2. Remove the screws (x2) that secure the Upper Housing Assy.
    3. Release the hooks (x8) that secure the Upper Housing Assy.
    4. Lift the Upper Housing Assy while leaving the Ink Supply Holder Assy.
    5. Disconnect the Panel FFC from the connector on the main board, and remove the Upper Housing Assy.„When replacing the Upper Housing Assy, peel off the Voluntary Label from the old housing and attach it to the new housing as specified in the 
    figure above.
    „When installing the Ink Supply Holder Assy, align the hooks (x4) of it with the holes of the Upper Housing Assy and then tighten the screws in 
    the order indicated in the figure above.
    Bottom side
    Hook
    Upper Housing Assy
    Step 3
    Upper Housing Assy
    Panel FFC
    Step 5
    1C.B.P-TITE SCREW 3x6 (5.0 ~ 6.0 kgf·cm)Ink Supply Holder Assy
    Hook
    2
    C.B.P-TITE SCREW 3x10 (5.0 ± 0.5 kgf·cm)
    Upper Housing Assy
    Upper Housing Assy
    Ink Supply Holder Assy
    Left side
    Rear side
    Step 1
    Step 2
    Step 4Left sideVoluntary Label
    5.0 mm
    30.0 mm
    Refilling Ink Label (L100/L101)
    Attach the Refilling Ink Label on the position shown in the figure 
    above.23.2 mm
    4.0 mm
    4.0 mm
    10.0 mm
    Refilling Ink Label
    Printer Cover (L100/L101)
    Be careful when removing the Printer Cover, because the hooks 
    (x2) are fragile and easily get damaged or softened.
    Printer Cover
    Hook
    Ink Tube Guide 1st / Ink Supply Holder Assy (L100/L101)
    Follow the procedure below when removing the Ink Supply Holder Assy / Ink Tube Guide 1st.
    1. Remove the Upper Housing Assy. (p 30)
    2. Peel off the acetate tape (x2) that secure the Ink Tube Guide 1st. (p 27)
    3. Remove the screw (x1) that secures the Ink Tube Guide 1st.
    4. Release the hooks (x2) that secure the Ink Tube Guide 1st, and remove it from the frame.
    5. After confirming the Valve is closed, disconnect the Ink Tubes from the Joint. (p 10)
    6. Pull out the Ink Tubes from the holes of the Ink Supply Holder Assy / Ink Tube Guide 1st, and remove the Ink Supply Holder Assy / Ink Tube 
    Guide 1st.
    Hook Joint
    Ink Tube Guide 1st
    Ink Supply Holder Assy
    Ink Tube Guide 1st
    Holes
     Ink Tube
     Ink Tube
    C.B.P-TITE SCREW 2.5x5 
    (5.0 ~ 6.0 kgf·cm)
    Ink Tube Guide 1st 
    						
    All Epson manuals Comments (0)

    Related Manuals for Epson L210 Service Manual