Epson L210 Service Manual
Have a look at the manual Epson L210 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1734 Epson manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
L200/L201/L100/L101Revision A ConfidentialDisassembly/AssemblyDisassembling/Assembling Flowchart21 Flowchart 1-4. Disassembling Flowchart of Printer Mechanism Part (2) Porous Pad Front Paper Guide ------ (p 25) Power Supply Unit 1--- (p 24) (p 34) S1 Roller Idler Pick Assy ------ (p 40) Wa s t e In k P a d s ---6 (p 34) CR Motor 2--- (p 31) (p 34) S5 B Printhead 3--- (p 31) (p 34) S4 Waste Ink Tray Assy 2--- (p 26)S1 Tube Holder Top/ Tube Holder Lower ---5 (p 28) ScrewCR Cover 22 (p 27)S9 Tu b e G u i d e P l a t e ---4 --- Tube Pressing Plate Tube Holder Top/ Tube Holder LowerAdapter Assy ---1 (p 28)FFC Cover FFC Cover ---3 (p 24) CR Front 22 (p 27)S9 Tube Assy ------ (p 28) (p 34) Gear Pump Idle ---1 (p 26) Gear Pump ------ (p 26) Bracket Pump ------ (p 26) Pump Housing ------ (p 26) Waste Ink Tube ------ (p 26) Lever Pick Clutch ------ (p 26) Roller Pump ------ (p 26) (p 20) 2 Joint ---2 (p 28) Tube Pressing Plate 1--- ---S9 Screw ------ (p 28)S11 Holder Contact ------ --- L200/L201: (p 18) L100/L101: (p 19) Tube Guide Plate Support ------ (p 29) Screw type/torque listSymbol Screw type Torque C.B.P-TITE SCREW 3x8 5.0 ± 0.5 kgf·cm C.B.P-TITE SCREW 3x10 5.0 ± 0.5 kgf·cm C.B.S-TITE SCREW 3x5 7.5 ± 0.5 kgf·cm C.B.P-TITE SCREW 2.6x8 4.0 ± 0.25 kgf·cm C.P.(P1) SCREW 2.6x3.5 3.5 ± 0.25 kgf·cm C.B.S-TITE SCREW 2x5 3.5 ± 0.25 kgf·cm C.B.P-TITE SCREW 2x6 3.0 ± 0.25 kgf·cm C.F.B-TITE SCREW 2.6x6 3.0 ± 0.25 kgf·cm C.B.P TITE SCREW 2.5x5 5.0 ~ 6.0 kgf·cm C.B.P TITE SCREW 3x6 5.0 ~ 6.0 kgf·cm C.B.P TITE SCREW 2.6x16 5.0 ~ 6.0 kgf·cm S1S2S3S4S5S6S7S8S9S10S11 L200/L201 specific parts/unitL100/L101 specific parts/unitCommon parts/unit
L200/L201/L100/L101Revision A ConfidentialDisassembly/AssemblyDisassembling/Assembling Flowchart22 Flowchart 1-5. Disassembling Flowchart of Printer Mechanism Part (3) Carriage ------ (p 25) (p 31) 1 Carriage Assy ------ (p 34)PCB Encoder 2--- ---S7 Timing Belt ------ --- Head FFC ------ (p 32) CR MotorPrinthead (p 20) C EJ Frame Assy ------ (p 27) EJ Roller ------ (p 39) (p 34)Waste Ink Pads(for flushing) ------ --- Cover Flushing 1--- ---S1 Ink Tube Guide 2nd 22 (p 27)S2 EJ Roller Gear Bottom CoverVa l v e L e v e r Tube Valve Holder RearTube Valve Holder Front Valve Assy ---2 (p 28) Ink Supply Tank Assy ---7 (p 26) Ink Tube Guide 1st 12 (p 30) (p 27) S9 FFC CoverHolder ContactCR Front Tube Pressing Plate Cap L200/L201: (p 18) L100/L101: (p 19) To p C o v e rRight Cover Left Cover Screw type/torque listSymbol Screw type Torque C.B.P-TITE SCREW 3x8 5.0 ± 0.5 kgf·cm C.B.P-TITE SCREW 3x10 5.0 ± 0.5 kgf·cm C.B.S-TITE SCREW 3x5 7.5 ± 0.5 kgf·cm C.B.P-TITE SCREW 2.6x8 4.0 ± 0.25 kgf·cm C.P.(P1) SCREW 2.6x3.5 3.5 ± 0.25 kgf·cm C.B.S-TITE SCREW 2x5 3.5 ± 0.25 kgf·cm C.B.P-TITE SCREW 2x6 3.0 ± 0.25 kgf·cm C.F.B-TITE SCREW 2.6x6 3.0 ± 0.25 kgf·cm C.B.P TITE SCREW 2.5x5 5.0 ~ 6.0 kgf·cm C.B.P TITE SCREW 3x6 5.0 ~ 6.0 kgf·cm C.B.P TITE SCREW 2.6x16 5.0 ~ 6.0 kgf·cm S1S2S3S4S5S6S7S8S9S10S11 L200/L201 specific parts/unitL100/L101 specific parts/unitCommon parts/unit Ink Supply Holder Assy 24 (p 30) (p 30) S10
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit23 Confidential1.3 Details of Disassembling/Reassembling by Parts/Unit Panel Unit (L200/L201) Do not lift the Panel Unit too fast, since the Panel FFC is connected to the back of the Panel Unit. Panel UnitPanel FFC Document Pad (L200/L201) When installing the Document Pad, follow the procedure below. 1. Place the Document Pad with the side where the double-sided tape attached upward on the document glass aligning its corner with the origin position. 2. Close the Document Cover to attach the Document Pad. Standard lineDouble-sided tape Document CoverDocument Pad Origin Position Scanner Unit (L200/L201) Do not lift the Scanner Unit too fast, since the Panel FFC, Scanner Motor cable and Scanner FFC are connected to the rear side of the Scanner Unit.Tighten the screws in the order indicated in the figure above. 3 Panel FFC Scanner FFCScanner Motor cable Scanner Unit Scanner Unit 1 2 4 C.B.P-TITE SCREW 3x10 (5.0 ± 0.5 kgf·cm) CIS (L200/L201) Be careful not to lose the Spacer because it comes off easily when disassembling the CIS.„When installing the spacers, be sure to place them with the cutout facing inward. „Align the toothed side of the Timing Belt with the same shaped rib of the backside of the CIS, and secure the Timing Belt with Torsion Spring. Spacer Backside of the CIS Timing Belt Torsion Spring Toothed side CIS Main Board Take care not to damage the PE Sensor Lever.„Align the ribs (x3) of the Main Frame with the cutouts of the Main Board. „Screw one side of the grounding wire (w/ ferrite core) together with the plate of the PF Motor, and the other side together with the Main Board. C.B.S-TITE SCREW 3x5 (7.5 ± 0.5 kgf·cm)C.B.P-TITE SCREW 3x8 (5.0 ± 0.5 kgf·cm) Main Board PE Sensor Lever Rib Main Board Grounding wire Plate of PF Motor
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit24 Confidential Power Supply Unit Route the Power Supply Unit cable through the hole of the Frame Base. Power Supply Unit Power Supply Unit Hole Power Supply Unit Cable FFC Cover Insert the folded part of the Head FFC into the groove of the FFC Cover. FFC Cover Head FFC Groove FFC Cover Groove Head FFC Cap Unit When installing the Cap Unit, follow the instruction below. 1. Temporarily secure the Cleaner Case Spring to the hook and dowel of the Frame Base. 2. Insert the Waste Ink Tube to the Cap Unit until point A (p 26) is hidden. 3. Install the Cap Unit to the Frame Base, and attach the Cleaner Case Spring which is secured temporary earlier to the hook on the Cap Unit. 4. Insert one leg of the Cleaner Lever Spring to the hole of the Frame Base, and secure it to the dowel of the Frame Base, then secure the other leg to the protrusion of the Lever Cleaner. Cleaner Lever Spring Dowel Hole Lever Cleaner Protrusion Waste Ink Tube Point A Cleaner Case Spring Hook Cleaner Case Spring Cap Unit Cap Unit Dowel for temporarily secure Frame Base Step 1 Step 2 Step 3 Step 4 Hook Main Frame „When installing the Grounding Spring of the lower part of the 80-digit side, follow the instruction below. 1. Insert the tip of the spring to the hole of the Frame Base. 2. Attach the eye of the spring to the Bracket and secure the other eye to the hook on the Main Frame. „When installing the Extension Spring of the lower part of the 0-digit side, attach the tip of the Extension Spring to the hole of the Frame Base first. Then attach the leg of the spring to the cutout of the Main Frame from the left side as seen from the rear of the printer. „Tighten the screws in the order indicated in the figure above. Hook Grounding Spring Hole Bracket Main FrameLower part of 80-column side TBD 1 Main Frame 2 3 4 Main Frame Left Side Right Side C.B.P-TITE SCREW 3x8 (5.0 ± 0.5 kgf·cm)C.B.S-TITE SCREW 3x5 (7.5 ± 0.5 kgf·cm) Cutout Hole Lower part of 0-column side Extension Spring CR Scale „When installing the CR Scale, confirm that the arrows on both the edges of the CR Scale face upward. „When installing the Extension Spring, be sure to attach it with its leg facing the rear of the printer. CR Scale Extension Spring
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit25 Confidential LD Roller Assy / LD Roller „When removing the LD Roller Assy, follow the procedure below. 1. Release the hooks (x2) and remove the Gear 23T. 2. Release the hooks (x2) and slide the Shaft Gear 24T to the 0-digit side until the concave section of the gear comes to the bearing part of the Pick Assy. 3. Remove the LD Roller Assy upward. „When removing the LD Roller, remove the screws (x2) shown in the figure above.When install the Torsion Spring, make sure to align the leg to the position as shown above. Pick Assy Step 2, 3 Shaft Gear 24T Concave section Bearing C.B.P-TITE SCREW 3x8 (TBD)C.F.B-TITE SCREW 3x5 (TBD) Hook Step 1 Gear 23T Step 2 Shaft Gear 24T LD Roller Assy LD Roller LD Roller AssyTorsion Spring Leg of the spring Housing Buckler „When installing the Friction Buckler and Friction Buckler R to the Housing Buckler, pay attention to the following instructions. • Remove the Sheet BF2-A on the rear side of the Friction Buckler to be replaced, and secure the removed sheet with double-sided tape to the new Friction Buckler. • Install the friction bucklers to the Housing Bucklers with the cutouts facing forward. „Install the buckler to the position as shown above. Friction Buckler R Housing Bucklers Friction Buckler Cutouts Friction Buckler Friction Buckler R Friction Buckler Sheet BF2-A Double-sided tape Housing Buckler (Friction Buckler) Housing Buckler (Friction Buckler R) Carriage When replacing the Carriage, be careful about the following and remove the Grounding Plate, Guide Carriage, Compression Springs from the Carriage to be replaced, then attach them to the new Carriage as shown in the figure above. „Insert the protrusion of the Grounding Plate to the hole of the Carriage, and align the dowels (x3) of the Carriage with the positioning holes (x3) of the Grounding Plate. „Secure hooks (x2) of the Guide Carriage by attaching them on the holes (x2) of the Carriage. Grounding PlateGuide CarriageCompression Spring Positioning Hole and Dowel Hook Protrusion Compression Spring Porous Pad Front Paper Guide When installing the Porous Pad Front Paper Guide, align the pad with the ribs and protrusions of the Platen. After installing the pad, make sure to fit it evenly 1.5mm lower than the standard surface. Standard surface: In the area with concaves and convexes on the Porous Pad Front Paper Guide, use the level of the concave section as a standard surface. Rib Protrusion Jam Cover When removing the Jam Cover, be careful not to lose the spring installed to the dowel on the right side. Jam Cover Spring Jam Cover USB Cover The USB Cover cannot be re-used once it is removed. Whenever the cover is removed, make sure to replace it with a new one.When removing the USB Cover, cut the hook securing the USB Cover with a nipper. Be careful not to damage the Upper Housing then. Hook USB Cover
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit26 Confidential Gear Pump Idle/ Gear Pump/ Bracket Pump/ Roller Pump/ Waste Ink Tube/ Pump Housing When reassembling the Pump Assy, follow the instructions below. 1. Make six points on the Waste Ink Tube. 2. Insert the Waste Ink Tube in the hole of the Pump Housing with the red line of the tube set as shown in the figure above. 3. Secure point C of the Waste Ink Tube to the point C of the Pump Housing. 4. Secure point D of the Waste Ink Tube to the point D of the Pump Housing. 5. Install the Roller Pump to the Bracket Pump. 6. Set the Waste Ink Tube inside the Bracket Pump, and install the Bracket Pump to the Pump Housing. 7. Rotate the Bracket Pump shaft and make sure that the Roller Pump shaft moves to both ends in the groove. 8. Make sure that point D is placed in the correct position. 9. Install the Gear Pump. 10. Install the Gear Pump Idle. 11. Install the Lever Pick Clutch. Step 10, 11Lever Pick Clutch Gear Pump Idle Step 7Roller Pump shaft GrooveBracket Pump shaft Step 6 Pump Housing Bracket Pump Waste Ink Tube Pump Housing Point DStep 4, 8 Step 2,3 Point C Pump Housing Waste Ink Tube Step 1 Waste Ink Tube ABC D EF 10 ±1 mm 110.5 ±1 mm 110 ±1 mm 39 ±1 mm10 ±1 mm 19 ±1 mm Step 5 Bracket Pump Roller Pump Step 9 Gear Pump Cap Unit sideWaste Ink Tray Assy side Pump Assy „Route the Ink Tube along the ribs on the Frame Base. „After installing the Ink Tube, make sure that no part of the tube is pressed flat. Rib Waste Ink Tube Waste Ink Tray Assy When installing the Waste Ink Tube, pay attention to the following instructions. „Align and secure the point E (p 26) of the Waste Ink Tube to the hook on the Frame Base. „Insert the Holder Tube up to the point F (p 26) of the Waste Ink Tube, and insert the holder into the Duct Tube End. Waste Ink Tube Point E Point F Holder Tube Waste Ink Unit Hook Duct Tube End Holder Tube Ink Supply Tank Assy Be careful not to damage or peel off the film of the Ink Supply Tank Assy.To make disassembling the Ink Supply Tank Assy easier, push slightly the part A of the Ink Supply Tank shown in the figure above to release the hooks.When assembling the Ink Supply Tank Assy, attach them according to their color in the order of the indications on the Top Cover. Film Ink Supply Tank Assy Top coverBk M Y C Part A Valve Lever In order to prevent ink spill, make sure to close the Valve Lever before disassembling. (p 10)When removing the Valve Lever, follow the instructions below. 1. Remove the Ink Supply Tank Assy from the Housing. 2. Insert the flathead precision screwdriver by the Tube Valve Holder Rear as shown in the figure above. 3. Release the hook and remove the Valve Lever. Flathead precision screwdriver Tube Valve Holder Rear Hook Valve Lever
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit27 Confidential Right Cover / Left Cover / Bottom Cover The figures above indicate the hooks and ribs that secure the parts. Hook Rib Right Cover Left Cover Bottom Cover CR Front „Align the positioning holes (x2) of the CR Front with the dowels (x2) of the Carriage. „Tighten the screws in the order indicated in the figure above. 1 2 C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm) Positioning Hole and Dowel CR Front Carriage CR Cover „Tighten the screws in the order indicated in the figure above. „After installing the CR Cover, move the Carriage from side to side to make sure that the Tube Assy does not apply extra load of carriage movement. 1 C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm) 2 CR Cover Carriage Tube Assy Ink Tube Guide 1st „When installing the Ink Tube Guide 1st, align the blue lines of the ink tubes (the red lines for L100/L101) in the same direction as shown in the figure above, and be careful not to let the ink tubes go slack on the bottom of the Ink Tube Guide 1st. „After securing the Ink Tube Guide 1st, pull the ink tubes from the Ink Supply Tank Assy side to make sure that the ink tubes are not caught. „Attach acetate tape (x2) in the positions shown above to secure the Ink Tube Guide 1st. Ink Tube Guide 1st Ink Tubes Ink Tube Guide 1st Ink Tubes C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm) Ink Tube Guide 1st Acetate tape (18 mm x 50 mm)Front side Acetate tape (18 mm x 50 mm)Left side Ink Tube Guide 2nd / EJ Frame Assy „Align the ribs on the left/right side of the Ink Tube Guide 2nd with the frame as shown in the figure above. „Attach acetate tape in the position shown above to secure the Ink Tube Guide 2nd. „Tighten the screws of the Ink Tube Guide 2nd together with the EJ Frame Assy in the order indicated in the figure above. Bottom left Acetate tape (18 mm x 30 mm) 2 C.B.P-TITE SCREW 3x10 (5.0 ± 0.5 kgf·cm) 1 Ink Tube Guide 2ndEJ Frame Assy Rib Bottom right
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit28 ConfidentialTube Valve Holder Rear / Tube Valve Holder Front „When installing the Tube Valve Holder Front, align the blue lines (the red lines for L100/L101) of the ink tubes in the same direction as shown in the figure above, and route them through the grooves of the Tube Valve Holder Front. „Tighten the screws in the order indicated in the figure above. 1 C.B.P-TITE SCREW 3x6 (5.0 ~ 6.0 kgf·cm) 2 Tube Valve Holder Front Grooves Ink TubesTube Valve Holder Rear Tu b e H o l d e r To p / Tu b e H o l d e r L o w e r„Align the positioning holes (x2) of the Tube Guide Plate with the dowels (x2) of the Tube Holder Top. „ Route the ink tubes while avoiding the rib of the Tube Holder Lower to prevent the tubes from getting caught by the tube holders. „Make sure to route the ink tubes as shown in the figure above when installing the Tube Holder Top/Tube Holder Lower. „Route the ink tubes over the films of the Adapter Assy. C.B.P-TITE SCREW 2.6x16 (5.0 ~ 6.0 kgf·cm)CyanYellow BlackMagenta Tube Holder Top/ Tube Holder Lower Film Ink Tubes Tube Holder TopTube Guide Plate Positioning hole and dowel Tube Holder LowerRib Adapter Assy Be careful not to damage or peel off the film of the Adapter Assy.When installing the ink tubes to the Adapter Assy, insert the ink tubes with their red lines facing upward as shown in the figure above.Film Adapter Assy Opening for Ink Tubes Ink Tubes Joint „Align the red lines and blue lines (the other red lines for L100/ L101) respectively in the same direction as shown in the figure above, and insert them to the joint to the full to its base. „Be careful not to damage the ink tubes and joint. Valve Assy sideValve Assy side Tube Assy sideTube Assy side Front Joint Joint Back Tube Assy „Before installing the Tube Assy, align the positioning holes (x2) of the Tube Guide Plate with the dowels (x2) of the Ink Tube Guide 2nd. „When installing the Tube Assy, attach the Clamps (x2)/Tube Holder Top/Tube Holder Lower/Tube Guide Plate in the positions shown in the figure above. „When installing the Tube Assy, align the red lines of the ink tubes in the same direction as shown in the figure above, and attach them without any slack. 190 ± 1 mm 257 ± 1 mm 335 ± 1 mm 420 ± 4.2 mm or 10% toleranceBlack Magenta Yellow Cyan Joint side Adapter Assy side Tube Guide Plate Clamps (x2) Tube Holder Top/ Tube Holder Lower Tube Guide Plate Tube Holder Top/ Tube Holder Lower Clamps (x2) Joint Tube Assy Ink Tube Guide 2nd Tube Guide Plate Positioning hole and dowel Va l v e A s s y „When installing the Valve Assy, attach the Clamp on the position shown in the figure above. „When installing the Valve Assy, align the blue lines of the ink tubes (the red lines for L100/L101) in the same direction as shown in the figure above, and route them through the holes of the Ink Supply Tank Assy. „When installing the Valve Assy, secure it with the hooks (x2) of the Ink Supply Tank Assy. 165 ± 1 mm L200/L201: 310 mm L100/L101: 290 mm 380 mm 400 mmL100/L101 L200/L201 350 mm 370 mm 325 mm 345 mm 325 mm 345 mm Black Magenta Yellow Cyan Clamp Valve case Valve caseTube Assy side Ink Supply Tank Assy side Hole Length of Ink Tube Joint Ink Supply Tank Assy Ink Tube Valve Assy Ink Supply Tank Assy Hook
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit29 Confidential Tube Guide Plate Support Refer to the figure above and follow the procedure below when installing the Tube Guide Plate Support. 1. Make sure that the hole B of the Tube Guide Plate Support comes on the right front side as seen from the front of the printer, and route the Tube Guide Plate Support through the hole A (x2) of the Tube Guide Plate as shown in the “OK” image above. 2. Route the ink tubes along with the Tube Guide Plate. 3. Insert the section A of the Tube Guide Plate Support into the hole C of the Tube Guide Plate Support up from the bottom as shown in the “OK” image above to secure it OK Section A Hole C Ink Tube NG Section A Hole C Ink Tube Tube Guide Plate Support Hole C Hole B Hole C Hole B Section A Section A Hole A NGOK Tube Guide Plate Tube Guide Plate Support Cross- section Tube Guide Plate Hole A Tube Guide Plate Refilling Ink Label (L200/L201) Attach the Refilling Ink Label on the position shown in the figure above. 8.0 mm Refilling Ink Label 16.5 mm 30.5 mm Valve Position Label Attach the Valve Position Label on the position shown in the figure above. 6.4 mm 7.5 mm 7.5 mm Valve Position Label Middle Housing (L200/L201) When replacing the Middle Housing, peel off the Voluntary Label from the old housing and attach it to the new housing as specified in the figure above. Left sideVoluntary Label 10.0 mm 45.0 mm Middle Housing Ink Supply Holder Assy (L200/L201)When installing the Ink Supply Holder Assy, align the hooks (x2) with the hole of the Middle Housing, and tighten the screws in the order indicated in the figure above. 1 C.B.P-TITE SCREW 3x6 (5.0 ~ 6.0 kgf·cm) 2 Ink Supply Holder Assy Hook Middle Housing Ink Tube Guide 1st / Ink Supply Holder Assy (L200/L201) Follow the procedure below when removing the Ink Supply Holder Assy / Ink Tube Guide 1st. 1. Remove the screws (x2) that secure the Ink Supply Holder Assy. (p 29) 2. Peel off the acetate tape (x2) that secure the Ink Tube Guide 1st. (p 27) 3. Remove the screw (x1) that secures the Ink Tube Guide 1st. 4. Release the hooks (x2) that secure the Ink Tube Guide 1st, and remove it from the frame. 5. After confirming the Valve is closed, disconnect the Ink Tubes from the Joint. (p 10) 6. Pull out the Ink Tubes from the holes of the Middle Housing / Ink Supply Holder Assy / Ink Tube Guide 1st, and remove the Ink Supply Holder Assy / Ink Tube Guide 1st. C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm) Ink Tube Guide 1st Hook Joint Ink Tube Guide 1st Ink Supply Holder Assy Middle Housing Ink Tube Guide 1st Holes Ink Tube Ink Tube
L200/L201/L100/L101Revision ADisassembly/Assembly Details of Disassembling/Reassembling by Parts/Unit30 Confidential Upper Housing Assy / Ink Supply Holder Assy (L100/L101) „Do not lift the Upper Housing Assy too fast, since the Panel FFC is connected to the back of the Upper Housing Assy. „Be careful not to damage the hooks (x2) on the bottom left because these cannot be seen when removing.Follow the procedure below when removing the Upper Housing Assy. 1. Remove the screws (x2) that secure the Ink Supply Holder Assy. 2. Remove the screws (x2) that secure the Upper Housing Assy. 3. Release the hooks (x8) that secure the Upper Housing Assy. 4. Lift the Upper Housing Assy while leaving the Ink Supply Holder Assy. 5. Disconnect the Panel FFC from the connector on the main board, and remove the Upper Housing Assy.„When replacing the Upper Housing Assy, peel off the Voluntary Label from the old housing and attach it to the new housing as specified in the figure above. „When installing the Ink Supply Holder Assy, align the hooks (x4) of it with the holes of the Upper Housing Assy and then tighten the screws in the order indicated in the figure above. Bottom side Hook Upper Housing Assy Step 3 Upper Housing Assy Panel FFC Step 5 1C.B.P-TITE SCREW 3x6 (5.0 ~ 6.0 kgf·cm)Ink Supply Holder Assy Hook 2 C.B.P-TITE SCREW 3x10 (5.0 ± 0.5 kgf·cm) Upper Housing Assy Upper Housing Assy Ink Supply Holder Assy Left side Rear side Step 1 Step 2 Step 4Left sideVoluntary Label 5.0 mm 30.0 mm Refilling Ink Label (L100/L101) Attach the Refilling Ink Label on the position shown in the figure above.23.2 mm 4.0 mm 4.0 mm 10.0 mm Refilling Ink Label Printer Cover (L100/L101) Be careful when removing the Printer Cover, because the hooks (x2) are fragile and easily get damaged or softened. Printer Cover Hook Ink Tube Guide 1st / Ink Supply Holder Assy (L100/L101) Follow the procedure below when removing the Ink Supply Holder Assy / Ink Tube Guide 1st. 1. Remove the Upper Housing Assy. (p 30) 2. Peel off the acetate tape (x2) that secure the Ink Tube Guide 1st. (p 27) 3. Remove the screw (x1) that secures the Ink Tube Guide 1st. 4. Release the hooks (x2) that secure the Ink Tube Guide 1st, and remove it from the frame. 5. After confirming the Valve is closed, disconnect the Ink Tubes from the Joint. (p 10) 6. Pull out the Ink Tubes from the holes of the Ink Supply Holder Assy / Ink Tube Guide 1st, and remove the Ink Supply Holder Assy / Ink Tube Guide 1st. Hook Joint Ink Tube Guide 1st Ink Supply Holder Assy Ink Tube Guide 1st Holes Ink Tube Ink Tube C.B.P-TITE SCREW 2.5x5 (5.0 ~ 6.0 kgf·cm) Ink Tube Guide 1st