Home > Cisco > Ethernet Switch > Cisco 4507re Manual

Cisco 4507re Manual

Here you can view all the pages of manual Cisco 4507re Manual. The Cisco manuals for Ethernet Switch are available online for free. You can easily download all the documents as PDF.

Page 51

  
2-15
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 2      Preparing for Installation
Site Preparation Checklist
Table 2-2 Site-Planning Checklist
Task No. Planning Activity  Verified by Time Date
1 Space evaluation:
•Space and layout
•Floor covering
•Impact and vibration
•Lighting
•Maintenance access
2 Environmental evaluation:
•Ambient temperature
•Humidity
•Altitude
•Atmospheric contamination
•Airflow
3 Power evaluation:
•Input power type
•Receptacle proximity to the...

Page 52

  
2-16
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 2      Preparing for Installation
Site Preparation Checklist 

Page 53

CHAPTER
  
3-1
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
3
Installing the Switch
Revised: October 2011
This chapter describes how to install Catalyst 4500 E-series switches in an equipment rack. The chapter 
contains the following sections:
•Installation Process, page 3-2
•Rack-Mounting Guidelines, page 3-2
•Unpacking the Switch, page 3-4
•Installing the Switch in a Rack, page 3-4
•Establishing the System Ground Connection, page 3-7
•Completing the Installation Process, page 3-9
Wa r...

Page 54

  
3-2
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 3      Installing the Switch
Installation Process
Installation Process
The process of installing the switch can be broken down into a series of tasks. These tasks are listed in 
Ta b l e 3 - 1.
TipFor additional information about the Cisco Catalyst 4500 E-series switches (including configuration 
examples and troubleshooting information), see the documents listed on this page:...

Page 55

  
3-3
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 3      Installing the Switch
Rack-Mounting Guidelines
NoteAll of the Catalyst 4500 E-series switch chassis are designed to install in standard 19-inch racks.
•The rack must have sufficient vertical clearance to insert the chassis. The chassis heights are as 
follows:
–Catalyst 4503-E switch—12.25 inches (31.12 cm) (7 RU)
–Catalyst 4506-E switch—17.38 inches (44.13 cm) (10 RU)
–Catalyst 4507R-E switch—19.15 inches (49 cm) (10...

Page 56

  
3-4
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 3      Installing the Switch
Unpacking the Switch
Unpacking the Switch
To check the contents of the shipping cartons, follow these steps:
St e p 1Check the contents of the accessories box against the accessories box components checklist and the 
packing slip that were included with your switch. Verify that you received all listed equipment, including 
the following: 
•Rack-mount kit, cable guide kit, and system ground kit...

Page 57

  
3-5
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 3      Installing the Switch
Installing the Switch in a Rack
•Tape measure 
•Level
•Your own electrostatic discharge (ESD) grounding strap or the disposable ESD strap included with 
the system
Installing the Catalyst 4500 E-Series Switches in a Rack
To install a Catalyst 4500 E-series switch in an equipment rack, follow these steps:
St e p 1Place the chassis on the floor or on a sturdy table near the rack.
St e p 2Use a tape...

Page 58

  
3-6
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 3      Installing the Switch
Installing the Switch in a Rack
Figure 3-1 Installing the Switch in the Rack (Catalyst 4506-E Switch Shown)
a.
Attach the cable guide, if needed, using the M3 screws provided in the cable management kit. The 
cable guide attaches to prethreaded holes in either L bracket. (See Figure 3-2.)
NoteWe recommend that you attach the cable guide to the right side of the switch chassis to prevent 
the network...

Page 59

  
3-7
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 3      Installing the Switch
Establishing the System Ground Connection
Figure 3-2 Attaching the Cable Guide to the Chassis (Catalyst 4506-E Switch Shown)
St e p 6
Verify that on all installed supervisor engines and switching modules, the ejector levers are completely 
closed and that the captive installation screws are tight.
Establishing the System Ground Connection
The system (NEBS) ground provides additional grounding for...

Page 60

  
3-8
Catalyst 4500 E-Series Switches Installation Guide
OL-13972-02
Chapter 3      Installing the Switch
Establishing the System Ground Connection
Required Tools and Parts
To connect the system ground, you need the following tools and parts:
•Grounding lug—A two-hole standard barrel lug that supports up to 6 AWG wire. The grounding lug 
is upplied as part of accessory kit.
•Grounding screws—Two M4 x 8 mm (metric) pan-head screws that are supplied as part of the 
accessory kit.
•Grounding wire—Not...
Start reading Cisco 4507re Manual

Related Manuals for Cisco 4507re Manual

All Cisco manuals