Page 41
2-5 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Site Requirements Altitude Operating a system at high altitude (low pressure) reduces the efficiency of forced and convection cooling and can result in electrical problems related to arcing and corona effects. This condition can also cause sealed components with internal pressure, such as electrolytic capacitors, to fail or perform at reduced efficiency. Each system is rated to operate at...
Page 42
2-6 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Site Requirements When wires are run for any significant distance in an electromagnetic field, interference can occur between the field and the signals on the wires. This fact has two implications for the construction of plant wiring: •Bad wiring practice can result in radio interference emanating from the plant wiring. •Strong EMI, especially when it is caused by lightning or radio...
Page 43
2-7 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Site Requirements •Space heaters •Power tools •Teletype machines •Laser printers •Facsimile machines •Any other motorized equipment Besides these appliances, the greatest threats to a system power supply are surges or blackouts that are caused by electrical storms. Whenever possible, turn off the system and any peripherals, and unplug them from their power sources during thunderstorms. If a...
Page 44
2-8 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Site Requirements NoteIn all situations, grounding practices must comply with Section 250 of the National Electric Code (NEC) requirements or local laws and regulations. A 6 AWG grounding wire is preferred from the chassis to the rack ground or directly to the common bonding network (CBN). The equipment rack should also be connected to the CBN with 6 AWG grounding wire. Table 2-1 Grounding...
Page 45
2-9 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Site Requirements NoteIn installations where FXS modules are installed, supplemental grounding is required. NoteAlways ensure that all of the modules are completely installed and that the captive installation screws are fully tightened. In addition, ensure that all I/O cables and power cords are properly seated. These practices are normal installation practices and must be followed in all...
Page 46
2-10 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Site Requirements •Use approved power cables only. You have been provided with one or more power cables with your chassis power supply that are intended for use in your country, based on the shipping location. Should you need to purchase additional power cables, ensure that they are rated for the product and for the voltage and current marked on the product’s electrical ratings label. The...
Page 47
2-11 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Site Requirements After you install the system ground lug, follow these steps to correctly attach the ESD wrist strap: St e p 1Attach the ESD wrist strap to bare skin as follows: a.If you are using the ESD wrist strap supplied with the FRUs, open the wrist strap package and unwrap the ESD wrist strap. Place the black conductive loop over your wrist and tighten the strap so that it makes good...
Page 48
2-12 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Power Requirements Power Requirements When preparing your site for the switch installation, follow these requirements: •In systems configured with two power supplies, connect each of the two power supplies to a separate input power source. If you fail to do this task, your system might be susceptible to total power failure due to a fault in the external wiring or a tripped circuit breaker....
Page 49
2-13 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Power Requirements •If you are using a 200/240 VAC power source in North America, the circuit must be protected by a two-pole circuit breaker. •The source AC outlet must be within 6 feet (1.8 meters) of the system and should be easily accessible. •The AC power receptacles used to plug in the chassis must be the grounding type. The grounding conductors that connect to the receptacles should...
Page 50
2-14 Catalyst 4500 E-Series Switches Installation Guide OL-13972-02 Chapter 2 Preparing for Installation Cabling Requirements Cabling Requirements CautionThe intrabuilding port(s) of the equipment or subassembly is suitable for connection to intrabuilding or unexposed wiring or cabling only. The intrabuilding port(s) of the equipment or subassembly must not be metallically connected to interfaces that connect to the Outside Plant (OSP) or its wiring. These interfaces are designed for use as...