Asus S62f Service Guide
Here you can view all the pages of manual Asus S62f Service Guide. The Asus manuals for Notebook are available online for free. You can easily download all the documents as PDF.
Page 41
Assembly procedure 4. Install the LCD panel and secure 2 screws (M2.5*4L (K)) & 4 screws (M2.5*6L (K)) to secure it. M2.5*4L M2.5*6L 5. Connect the LCD cable. 6. Combine the LCD bezel and LCD Cover properly and press on all four edges\ until them snap into position. 3 - 6
Page 42
Assembly procedure 7. Secure74 screws (M2.5 x 6L) on LCD front bezel then paste 7 rubber pads above. M2.5*6L Bottom Case Module BOTTOM CASE MODULE The illustrations below show ho w to assembly the Bottom case module. The module contains Bluetooth boar d, speaker cable. Assembling Bottom case Module BOTTOM CASE...
Page 43
Assembly procedure 2. Install the Bluetooth board on the bottom case. 3. Connect the Bluetooth cable and lay it through the locking trench on bottom case. Motherboard MOTHERBOARD The illustrations below show how to asse mble and install the motherboard of the notebook. MOTHERBOARD ASSEMBLY 1. Install the...
Page 44
Assembly procedure 2. Connect the modem cable and paste 4 pieces of tape to fix the cable. 3. Install the TPM board and secure 1 screw (M2*3L (K)) to secure it. M2*3L 4. Install the IO bracket and use a single-slotted screwdriv er to secure 2 screws HEX 5mm. 3 - 9
Page 45
Assembly procedure 5. Secure 1 screw (M2*3L (K)) on the IO bracket to secure it. M2*3L 6. Connect the Bluetooth & Speaker cables, before install the Motherboard to the bottom case. Bluetooth cable Speaker cable 7. Combine the Motherbo ard and the bottom case. 8. Remove 2 screws for CRT on the...
Page 46
Assembly procedure 9. Secure 2 screws (M2.5*4L (K)) to secu re the motherboard. Top Case Module TOP CASE MODULE The illustrations below show how to assemb le and install the top case module of the notebook. 1. Install the touc hpad on the top case. TOP CASE ASSEMBLY 2. Install the...
Page 47
Assembly procedure 3. Connect the touch pad FFC and paste 1 piece of tape. 4. Connect the LANCH board cable. 5. Install the LANCH board and secu re 2 screws (M2.5*4L (K)). M2.5*4L 3 - 12
Page 48
Assembly procedure 1. Combine the Top case module and LCD module. 2. Secure 2 screws (M2.5*6L (K)) to fix the hinge. 1. Combine the bottom ca se from the top case. TOP CASE MODULE ASSEMBLY M2.5*6L BOTTOM CASE ASSEMBLY 3 - 13
Page 49
Assembly procedure 2. Before secure the bottom case, let the cable and ant ennas through in the hole. Inverter & camera cable Antenna 3. Secure 15 screws (M2.5*6L (K)) and 1 screw (M2.5*4L) (K)) to secure the bottom case. 4. Lay the antennas through the locking trench on bottom case M2.5*6L M2.5*4L 3...
Page 50
Assembly procedure 5. Connect the Coaxial & inverter cable and lay the cables through the locking trench on bottom case. Coaxial cable Inverter cable 6. Secure 1 screws (M2*3L (K)) to secure cables. I M2*3L 7. Turn over the NB and connect the LA NCH cable and touchpad FFC on top case. LANCH cable...