Home > Yamaha > Music Production System > Yamaha Ls 9 Service Manual

Yamaha Ls 9 Service Manual

Here you can view all the pages of manual Yamaha Ls 9 Service Manual. The Yamaha manuals for Music Production System are available online for free. You can easily download all the documents as PDF.

Page 31

31 LS9-16/LS9-32Fig. 6
¢
$£ [202]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[206A]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[209A]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[302A]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[303A]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 IT (WE997400)
[352A]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
Power switch...

Page 32

LS9-16/LS9-32
32
Photo 7
¢ø
£
•Duct assembly 16¢¼«ÄTT’Z£
DC fan motor

[D60]
[D60]: Bind Head Tapping Screw-B
¢#» Ä´#*/%£4.0X35 MFZN2B3 (WF000100)
A-11. DC Shield Assembly 16, DCA Circuit Board
A-11-1 Remove the side panels L and R. (See procedure 1)
A-11-2 Fix the control panel assembly 16. (See procedure 2)
A-11-3 Remove the JK circuit board. (See procedure A-4)
A-11-4 Remove the DA circuit board. (See procedure A-5)
A-11-5 DC Shield Assembly 16 
  (Time required: About 11 minutes):...

Page 33

33 LS9-16/LS9-32
B.  LS9-16 Disassembly Procedure of Control Panel Assembly
 ¢-4¯ïÍÉTTZw
ür£
[22]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 IT (WE997400)
[24]: Bonding Tapping Screw-B
¢#» Ä´#0/%£3.0X8 MFZN2B3 (WE774100)
[72A]: Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 (WE774400)
[92A]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 IT (WE997400)
[97]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 IT (WE997400)
Fig. 7
¢
$£
B-1....

Page 34

LS9-16/LS9-32
34
Fig. 8
¢
$£
[150A]
[160A]
[170A] Control Panel Assembly 16
¢¯ïÍÉ TTZ£LCD Assembly 16
¢-$%TTZ£
10
5
0
5
• Mounting direction of the fader knob
¢Ñ£”¼”ÊÒw	
ÇM²£
The concave side should be to the right.
¢
æUÈpb{£
B-2. FD Circuit Board
   (Time required: About 7 minutes)
B-2-1 Remove the side panels L and R. (See procedure 1)
B-2-2  Remove the control panel assembly 16. 
  (See procedure 2)
B-2-3 Remove the sixteen (16) fader knobs marked 
[150A]...

Page 35

35 LS9-16/LS9-32
[22I]:   Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 IT (WE997400)
[32B]: Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 (WE774400)
[42B]: Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 (WE774400)
[52B]: Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 (WE774400)
[62B]: Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X8 MFZN2B3 (WE774400)
Fig. 9
¢
$£
STIN2
STIN1[32B]
[42B]
[62B]
[52B]
PNIN
Cable holder A
¢
¢{Úé £
PNIN angle bracket...

Page 36

LS9-16/LS9-32
36
Photo 8
¢ø
£
[40]: Button L (White)
 

Page 37

37 LS9-16/LS9-32
Photo 10
¢ø
£
[20a]: Button S (White)
 

Page 38

LS9-16/LS9-32
38
C.  LS9-32 Disassembly Procedure of Bottom Assembly Section
 ¢-4wØÄÜTTZ
æw
ür£
C-1.  CPU Circuit Board 
 
(Time required: About 6 minutes)
C-1-1 
Remove the side panels L and R. (See procedure 1)
C-1-2  Remove the control panel assembly 32. 
  (See procedure 2)
C-1-3 Remove the two (2) screws marked [322C] and 
two (2) screws marked [322D]. The CPU circuit 
board can then be removed. (Fig. 10)
 *  
MAC (Media Access Control) address is stored 
in the CPU circuit board. If...

Page 39

39 LS9-16/LS9-32
[52]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[322]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[362]: Bonding Tapping Screw-B
¢#» Ä´#0/%£3.0X8 MFZN2B3 (WE774100)
[364]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[372]: Bonding Tapping Screw-B
¢#» Ä´#0/%£3.0X8 MFZN2B3 (WE774100)
[374]:  Bind Head Tapping Screw-B
¢#» Ä´#*/%£3.0X6 MFZN2B3 (WF028600)
[382B]: Bonding Tapping Screw-B
¢#»...

Page 40

LS9-16/LS9-32
40
C-4.  LAMP Circuit Board 
  (Time required: About 6 minutes)
C-4-1 
Remove the side panels L and R. (See procedure 1)
C-4-2 Fix the control panel assembly 32. (See procedure 2)
C-4-3 Remove the two (2) screws marked [392]. The 
LAMP circuit board can then be removed. (Fig. 10)
C-5.  JK Circuit Board 
  (Time required: About 6 minutes)
C-5-1 
Remove the side panels L and R. (See procedure 1)
C-5-2 Fix the control panel assembly 32. (See procedure 2)
C-5-3 Remove the two (2) screws marked...
Start reading Yamaha Ls 9 Service Manual

Related Manuals for Yamaha Ls 9 Service Manual

All Yamaha manuals