Home > Yamaha > Outboard Motor > Yamaha F50 Service Manual

Yamaha F50 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Yamaha F50 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    Page
    of 403
    							62Y3A113-6
    1
    2
    3
    4
    5
    6
    7
    8
    I
    2. Place a drain pan under the drain hole,
    and then remove the drain bolt 2
     and let
    the oil drain completely.
    3. Place a rag under the oil filter, and then
    remove the filter.
    NOTE:
    Be sure to clean up any oil spills.
    4. Apply a thin coat of the new engine oil to
    the O-ring of the new oil filter.
    5. Install the oil filter, and then tighten it to
    the specified torque.6. Install the drain bolt, and then tighten it to
    the specified torque.
    7. Fill the specified engine oil into the oil
    filler hole. Oil filter wrench: YU-38411 / 90890-01426
    S62Y3080
    2
    S62Y3100
    Oil filter wrench: YU-38411 / 90890-01426
    Oil filter: 18 N·m (1.8 kgf·m, 13 ft·lb)
    Drain bolt: 18 N·m (1.8 kgf·m, 13 ft·lb)
    Recommended engine oil:
    4-stroke motor oil
    API: SE, SF, SG, or SH
    SAE: 10W-30, 10W-40, or 20W-40
    S62Y3110
    E
    S62Y3115
    Fuel system / Power unit 
    						
    							CHK 
    ADJ
    Periodic checks and adjustments
    3-762Y3A11
    8. Install the oil filler cap and dipstick, and
    then start the engine and warm it up for 5
    minutes.
    9. Turn the engine off, and then check the
    oil level and correct it if necessary.
    Checking the timing belt
    1. Remove the flywheel magnet cover.
    2. While turning the flywheel magnet clock-
    wise, check the interior a
     and the exte-
    rior b
     of the timing belt for cracks,
    damage, or wear. Replace if necessary.
    CAUTION:
    Do not turn the flywheel magnet counter-
    clockwise, otherwise the valve system
    may be damaged.
    Replacing the timing belt
    1. Turn the flywheel magnet clockwise and
    align the “1” mark a
     on the driven
    sprocket with the “” mark b
     on the cyl-
    inder head.
    CAUTION:
    Do not turn the flywheel magnet counter-
    clockwise, otherwise the valve system
    may be damaged.
    2. Remove the flywheel magnet. Oil quantity:
    With oil filter replacement:
    2.2 L (2.3 US qt, 1.9 Imp qt)
    Without oil filter replacement:
    2.0 L (2.1 US qt, 1.8 Imp qt) 
    						
    							62Y3A113-8
    1
    2
    3
    4
    5
    6
    7
    8
    I
    ÈFor USA and Canada
    ÉFor worldwide
    CAUTION:
    •Apply force in the direction of the
    arrows shown, to prevent the flywheel
    holder from slipping off easily.
    •To prevent damage to the engine or
    tools, screw in the flywheel puller set
    bolts evenly and completely so that the
    flywheel puller plate is parallel to the fly-
    wheel magnet.
    NOTE:
    Apply force to the crankshaft end until the fly-
    wheel magnet comes off the tapered portion
    of the crankshaft.3. Disconnect the stator couplers 3
    , and
    then remove the stator 4
    .
    4. Disconnect the pulser coil coupler 5
    ,
    and then remove the stator base 6
     with
    both collars 7
    .
    5. Remove the blowby hose bolts 8
     and
    tensioner 9
    , then the timing belt 0
     from
    the driven sprocket side.
    Flywheel magnet holder 1
    : YB-06139
    Flywheel holder 1
    : 90890-06522
    Universal puller 2
    : YB-06117
    Flywheel puller 2
    : 90890-06521
    Power unit 
    						
    							CHK 
    ADJ
    Periodic checks and adjustments
    3-962Y3A11
    6. Check that the “1” mark a
     on the driven
    sprocket is aligned with the “” mark b
    on the cylinder head, and that the “”
    mark c
     on the drive sprocket is aligned
    with the “” mark d
     on the crankcase.
    Align if necessary.
    CAUTION:
    Do not turn the sprockets counterclock-
    wise, otherwise the valve system may be
    damaged.
    7. While pushing against the tensioner side
    of the belt, install the new timing belt from
    the drive sprocket side with its part num-
    ber in the upright position.
    CAUTION:
    •Do not twist, turn inside out, or bend the
    timing belt beyond the maximum limit of
    25 mm (1.0 in) e
    , otherwise it may be
    damaged.
    •Do not get oil or grease on the timing
    belt.
    8. Install the tensioner and bolts, and then
    tighten the bolts finger tight.
    9. Turn the drive sprocket clockwise two
    turns, and then check that the alignment
    marks are aligned.
    CAUTION:
    Do not turn the sprockets counterclock-
    wise, otherwise the valve system may be
    damaged.
    10. Tighten the tensioner bolts to the speci-
    fied torque.
    11. Install the blowby hose bolts, stator base
    with both collars and stator, and then
    connect the couplers.
    12. Install the Woodruff key.
    Tensioner bolt:
    8 N·m (0.8 kgf·m, 5.8 ft·lb)
    Tensioner bolt (adjusting bolt):
    25 N·m (2.5 kgf·m, 18 ft·lb)
    Stator base screw:
    4 N·m (0.4 kgf·m, 2.9 ft·lb) 
    						
    							62Y3A113-10
    1
    2
    3
    4
    5
    6
    7
    8
    I
    13. Install the flywheel magnet and flywheel
    magnet cover.
    ÈFor USA and Canada
    ÉFor worldwide
    CAUTION:
    Apply force in the direction of the arrows
    shown, to prevent the flywheel holder
    from slipping off easily.
    NOTE:
    Apply engine oil to the flywheel magnet nut
    before installation.
    Checking the valve clearance
    1. Remove the flywheel magnet cover, and
    then disconnect the high-tension cords
    and blowby hose 1
    .2. Remove the spark plugs, fuel pump 2
    ,
    and cylinder head cover 3
    .
    3. Turn the flywheel clockwise and align the
    “1” mark a
     on the driven sprocket with
    the “” mark b
     on the cylinder head.
    CAUTION:
    Do not turn the flywheel counterclock-
    wise, otherwise the valve system may be
    damaged.
    4. Check the intake valve clearance for cyl-
    inders #1 and #2, and the exhaust valve
    clearance for cylinders #1 and #3. Adjust
    if necessary. Flywheel magnet holder: YB-06139
    Flywheel holder: 90890-06522
    Flywheel magnet nut:
    160 N·m (16 kgf·m, 116 ft·lb)
    Power unit 
    						
    							CHK 
    ADJ
    Periodic checks and adjustments
    3-1162Y3A11
    5. Turn the flywheel clockwise and align the
    “4” mark c
     on the driven sprocket with
    the “” mark b
     on the cylinder head.
    CAUTION:
    Do not turn the flywheel counterclock-
    wise, otherwise the valve system may be
    damaged.
    6. Check the intake valve clearance for cyl-
    inders #3 and #4, and the exhaust valve
    clearance for cylinders #2 and #4. Adjust
    if out of specification.
    NOTE:
    Adjust the valve clearance when the engine
    is cold.
    7. Loosen the locknut 4
    , and then turn the
    adjusting screw 5
     until the specified
    valve clearance is obtained.
    NOTE:
    To decrease the valve clearance, turn the
    adjusting screw clockwise.
    To increase the valve clearance, turn the
    adjusting screw counterclockwise.
    8. Tighten the locknut, and then check the
    valve clearances. Adjust if necessary.
    9. Install the cylinder head cover, fuel
    pump, and spark plugs.
    10. Connect the blowby hose and high-ten-
    sion cords, and then install the flywheel
    magnet cover.
    Checking the spark plugs
    1. Disconnect the high-tension cords, and
    then remove the spark plugs.
    Valve clearance:
    Intake d
    :
    0.20 ±
     0.05 mm (0.008 ±
     0.002 in)
    Exhaust e
    :
    0.30 ±
     0.05 mm (0.012 ±
     0.002 in) 
    						
    							62Y3A113-12
    1
    2
    3
    4
    5
    6
    7
    8
    I
    2. Clean the electrodes 1
     with a spark plug
    cleaner or wire brush. Replace the spark
    plug if necessary.
    3. Check the electrodes for erosion and
    excessive carbon or other deposits, and
    the gasket for damage. Replace the
    spark plug if necessary.
    4. Check the spark plug gap a
    . Adjust if out
    of specification.
    5. Install the spark plug, tighten it finger
    tight b
    , then to the specified torque with
    a spark plug wrench c
    .
    Checking the thermostat
    1. Remove the cover 1
    , thermostat cover
    2
    , and thermostat 3
    .
    2. Suspend the thermostat in a container of
    water.
    3. Place a thermometer in the water and
    slowly heat the water.
    Specified spark plug: DPR6EA-9 (NGK)
    Spark plug gap a
    : 0.9 mm (0.035 in)
    Spark plug: 18 N·m (1.8 kgf·m, 13 ft·lb)
    S62Y3290
    3
    2
    1
    S62Y3300
    Power unit 
    						
    							CHK 
    ADJ
    Periodic checks and adjustments
    3-1362Y3A11
    4. Check the thermostat valve opening at
    the specified water temperatures.
    Replace if out of specification.
    5. Install the thermostat, new gasket, ther-
    mostat cover, and cover.
    Checking the cooling water passage
    1. Check the cooling water inlet cover 1
    and cooling water inlet for clogs. Clean if
    necessary.
    2. Place the lower unit in water, and then
    start the engine.3. Check for water flow at the cooling water
    outlet. If there is no water flow, check the
    cooling water passage inside the out-
    board.
    Control system3
    Checking the throttle cable operation
    1. Check that the throttle cam 1
     is at the
    fully closed position a
     when the remote
    control lever is in neutral or the throttle
    grip is fully closed. Adjust the throttle
    cable length if necessary as follows.
    2. Loosen the locknut 2
    , remove the clip
    3
    , and then disconnect the throttle cable
    joint 4
    . Water temperature Valve lift a
     
    below 
    60 °C (140 °F)0 mm (0 in)
    above 
    70 °C (158 °F)more than 
    3 mm (0.12 in)
    S62Y3320
    1 1
    S62Y33701 
    						
    							62Y3A113-14
    1
    2
    3
    4
    5
    6
    7
    8
    I
    3. Align the alignment mark b
     on the throt-
    tle cam 1
     with the alignment mark c
     on
    the shift bracket.
    4. Adjust the position of the throttle cable
    joint until its hole is aligned with the set
    pin d
     on the throttle cam.
    CAUTION:
    The throttle cable joint must be screwed
    in a minimum of 8.0 mm (0.31 in) e
    .
    5. Connect the cable joint, install the clip,
    and then tighten the locknut.
    6. Check the throttle cable for smooth oper-
    ation and adjust the cable length, if nec-
    essary, repeating steps 2–6.
    Checking the gearshift operation
    1. Check that the gearshift operates
    smoothly when shifting from neutral into
    forward and reverse. Adjust the shift
    cable length if necessary.
    2. Set the gearshift to the neutral position.
    3. Loosen the locknut 1
    , remove the clip
    2
    , and then disconnect the shift cable
    joint 3
    .4. Align the set pin a
     in the center of the
    shift bracket with the alignment mark b
    on the bracket.
    5. Adjust the position of the shift cable joint
    until its hole is aligned with the set pin.
    CAUTION:
    The shift cable joint must be screwed in a
    minimum of 8.0 mm (0.31 in) c
    .
    6. Connect the cable joint, install the clip,
    and then tighten the locknut.
    7. Check the gearshift for smooth operation
    and adjust the shift cable length, if nec-
    essary, repeating steps 3–6.
    S62Y3400
    S62Y3360
    Power unit / Control system 
    						
    							CHK 
    ADJ
    Periodic checks and adjustments
    3-1562Y3A11
    Checking the engine idle speed
    1. Start the engine and warm it up for 5 min-
    utes.
    2. Attach the special service tool to high-
    tension cord #1 1
    , and then check the
    engine idle speed. Adjust if out of specifi-
    cation.
    3. Turn the throttle stop screw 2
     in direc-
    tion a
     or b
     until the specified engine
    idle speed is obtained.
    NOTE:
    To increase the idle speed, turn the throttle
    stop screw in direction a
    .
    To decrease the idle speed, turn the throttle
    stop screw in direction b
    .
    4. After adjusting the idle speed, rev the
    engine a few times and let it idle for at
    least 15 seconds to check the stability of
    the engine.
    Checking the ignition timing
    1. Start the engine and warm it up for 5 min-
    utes.
    2. Attach the special service tool to high-
    tension cord #1 1
    , and then check the
    engine idle speed.
    3. Attach the special service tool to high-
    tension cord #1 1
    . Inductive self-powered tachometer:
    YU-08036-B
    Digital tachometer: 90890-06760
    Engine idle speed: 
    750 ±
     50 (950 ±
     50) r/min
    S62Y3410
    1
    Inductive self-powered tachometer:
    YU-08036-B
    Digital tachometer: 90890-06760
    Engine idle speed: 
    750 ±
     50 (950 ±
     50) r/min
    Battery powered timing light: YM-33277-A
    Timing light: 90890-03141
    S62Y3430
    1
    S62Y3440
    1
    S62Y3450 
    						
    All Yamaha manuals Comments (0)

    Related Manuals for Yamaha F50 Service Manual