Vodavi Triad 1/2/3 Installation Manual
Here you can view all the pages of manual Vodavi Triad 1/2/3 Installation Manual. The Vodavi manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 22
2 Tr iad 1/2System Installation This chapter contains the basic system installation and wiring instructions for theTriad 1/2Systems, as well as how to install the op t i o na l c ar d s a n d u ni t s .
Page 24
Introduction2-3 Introduction As with any sophisticated communications device, installation of the Tri ad 1 /2S yst ems , r eq uir es t he c are a nd for e though t of a c ompe te nt technician. To as sure easy s ervicing a nd reliab le operation , several factors must b e cons id ered when planning the sys te m installa tion. The installation consists of these major steps: †Si te Pre par at ion †KSU and Power S upply ( PS ) Installa tion †PCB Installation †Sys te m Wi r ing †Keys et an d Ter mi nal I nst...
Page 25
2-4 Site Preparation Site Preparation Gen eral Sit e C on si der at i on s The first step is to locate an acceptable site for the common equipment (KSUs , b oard s, etc.). Whe n locating a moun ting s ite for the KS Us, the following p oints must be cons idered. †The KSUs are de sig ned for wall mounting and should not b e mount ed dir ec tl y t o a mas onr y or pl as te rboa rd wal l. I t is recommen ded th at a 1/2 inch plywood b ack b oard be firmly mounted to the wall, and the KSU and MDF, if other...
Page 26
Site Preparation 2-5 Back- Board In st all at i on A wooden ba ck-boa rd is recommended for a ll installa tions and m ust be ins ta lled when the location ha s ma sonry or plasterboa rd walls. A 1/2 in ch plywood m aterial is sufficient for mos t ins ta llations . T he back- board should be mounted at a convenient height, about 3 feet above the floor and bo l te d i n a nu mbe r o f p lac e s to dis tr i bu te t he wei ght o f th e s yst em . Spaceshouldbeavailableonthebottomsideoftheback-boardforthe MDF...
Page 27
2-6 Site Preparation Figure 2-1:Tr i ad 1Def ault Card La yout D T I BD T I BL C O BN O N EM P B DE FA ULT C A R D L AYO U T 01267SLOTS MP B D T I B
Page 28
Site Preparation 2-7 Fi g u r e 2- 2:Tr ia d 2Key S ervice Unit (BKS U/ EKS U) In ce rtai n con figura tion s, i t is p ossi ble to not h ave all ca rd slots uti lize d due to powe r su ppl y cap acit ies. U se the C onfigu rator Progr am to calcu late the co rrec t con fi gura tion . D T I BD T I BD T I BL C O BL C O BL C O BN O N EM P BN O N EN O N EN O N EN O N E DEFAULT CARD LAYOUT 234 56SLOTS MPB 01D T I B7101189
Page 29
2-8 K SU & Po we r Suppl y ( PSU) Inst al l atio n KSU & Power Supply (PSU) Installation TheTr iad 1Sys tem cons ists of a Bas ic KSU (BKSU) cab inet. The basic exterior of theTri ad 1S yst em is show n i nFigure 2 -2. Mounting theTr i a d 1Basic KSU The Bas ic KSU is a me tal frame cabinet d esigne d f or w all m ounting. Emp loying the KSU mountin g temp late provided with the BKSU , ma rk the location of the two screws to mount the BKSU. Again, the KSU must NOT be moun ted on a mas onry or dry -wall...
Page 30
KS U & Power Supp ly (PSU) In sta llat ion 2-9 Fi gure 2-3 :Tr ia d 1Unit Basic KSU Bac k w/M ounting Plate Ex tende d