Home > Toshiba > Communications System > Toshiba Perception Electronic Business Communications System Installation And Maintenance Manual

Toshiba Perception Electronic Business Communications System Installation And Maintenance Manual

Here you can view all the pages of manual Toshiba Perception Electronic Business Communications System Installation And Maintenance Manual. The Toshiba manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 301


				            

Page 302


				            

Page 303


				            

Page 304


				            

Page 305


				            

Page 306

TB 100-8504 
March 25, 1985 Page 1 of 1 
Both the LCD EKT and attendant console require a high volume of control data from 
the central control. If LCD EKTs and an attendant console are connected to the first half of a 
DEKU PCB, one or the other might malfunction during high traffic conditions. 
Therefore, LCD EKTs should not be installed at the following ports: 
I ) If the attendant console is assigned to port number LOOI, do not assign an LCD EKT to 
port numbers LO02, LOO3 or LOO4. 
2) If the...

Page 307


				            

Page 308


				            

Page 309

TB 100-8503 
March 1, 1985 Page 3 of 3 
b) The strapping terminal consists of six pins labeled A C D E F andapairof 
insulated shorting bars. The bars can connect two pairs of adjacent pins. Select 
the desired option according to the following table. (Note: The table is printed on 
each DLSU PCB for reference.) 
Battery to Ground Dial Pulse: A-B & E-F 
Loop Dial Pulse: B-C & D-E 
3) Loop Current Detection Level: 
a ) For proper detection of incoming digits, adjustments are required based upon 
the CO...

Page 310

To: 
Erom: 
Date: 
Subject: 
Open jack set box* 
Remove mute switch wires from switch0 
solder them togetherP tape and store*  MEMORANDUM 
---m--w--- 
Tech Tips 
John Brady 
March 6, 1985 
Headset Hook Switch Control 
Solder two lengths of 
wire to the switch about i foot long- 
Route these wires along the coil cord to the phone. 
Lift mod 
jack and lay the wires at bottom of slot. 
Replace mod jack- 
Route the wires aiong the left side of EKT. 
bottom of hook switch. Solder to top and 
JB:sh  
Start reading Toshiba Perception Electronic Business Communications System Installation And Maintenance Manual

Related Manuals for Toshiba Perception Electronic Business Communications System Installation And Maintenance Manual

All Toshiba manuals