Samsung Le 27t51b Service Manual
Have a look at the manual Samsung Le 27t51b Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1705 Samsung manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
3 Alignments and Adjustments 3-3 1. Calibration 2. Option Byte 3. W/B 4. VCTi 5. YC Delay 6. FLI5961 7. Adjust 8. Test Pattern 9. Chip Debugger 10. Check Sum 11. Spread Spectrum 12. HDCP 13. Reset T-TRNPEU-0000 month day year time P-TRNPEU-0000 Panel On Time(Hour) 0000 5. YC Delay RF PAL-B/G : 5 RF PAL-D/K : 6 RF PAL-I : 5 RF PAL-L/L : 5 RF SECAM-B/G : 2 RF SECAM-D/K : 0 RF SECAM-I : 2 RF SECAM-L/L : 0 RF NTSC 3.58 : 5 RF NTSC 4.43 : 5 AV PAL : 5 AV SECAM : 2 AV NTSC 3.58 : 5 AV NTSC 4.43 : 5 AV PAL 60 : 5 6. FLI5961 : Scaler IC Correct register Component Calibration: Result DTV Calibration PC Calibration : Result PC Calibration ACC/ACM TNR Picture Enhance 7. Adjust User Control lnitial LNA PLUS Hotel Option 11. Spread Spectrum Spread Spectrum: on/off Spread Spectrum Range: 2 Step : 63 8. Test Pattern : VCTi ICS own test patterns. (Total 7 patterns) 10. Check Sum : 0000 12. HDCP : 0000 13. Reset 9. Password : Use IC Register Correction.
3 Alignments and Adjustments 3-4 3-3 White Balance - Calibration 3-3-2 White Balance - Adjustment 3-3-1 White Balance -Calibration 3-3-3 Conditions for Measurement 1. CalibrationDTV Calibration PC Calibration (Calibration Condition refer to next page) 3. W/B (low light) (hight light) 1. On the basis of toshiba ABL pattern : High Light level (57 IRE) - INPUT SIGNAL GENERATOR : MSPG-925LTH * Mode NO 1 : 744X484@60 Hz NO 6 : 1280X720@60 Hz (Component 720P) NO 21 : 1024X768@60 Hz * PatternNO 15 : Color bar NO 16 : Toshiba ABL Pattern NO 17 : 16 gray 2. Optical measuring device : CA210 (FL) Please use the MSPG-925 LTH generator for model LNR2355W,LNR2755W,LNR3255W.(W/B adjustment Condition refer next page) Sub Bright Sub Contrast R offset R gain G offset G gain B offset B gain
3 Alignments and Adjustments 3-5 2. Adjust the white balance of AV, Component and DVI Modes. a) Set the input to the mode in which the adjustment will be made (AV Component DVI). * Input signal - VIDEO Mode : Model #1 (744*484 Mode), Pattern #16 - Component, DVI Mode : Model #6 (1280*720 Mode), Pattern #16 b) Enter factory W/B. c) Adjust the low light. - Adjust sub - Brightness to set the Y value. - Adjust red offset (x) and blue offset (y) to the color coordinates. ( x : 263, y : 267, Y : 1.3 ft) * Do not adjust green offset data. 3-3-4 Method of Adjustment 1. Adjust the basic level of Component and PC input signals. a) Set the input to the mode in which the adjustment will be made (Component PC ). * Input signal - Component Mode : Model #6 (1280*720 Mode), Pattern #15 (picture 4-1) - PC Mode : Model #21 (1024*768 Mode), Pattern #17 (Picture 4-2) b) Enter factory Calibration (DTV, PC Mode Only). * DTV Calibration Source change for PC PC Calibration Picture 4-1 Color bar Picture 4-2 16gray Picture 4-3 Toshiba ABL Pattern Low light Measurement point
3 Alignments and Adjustments 3-6 Picture 4-4 Toshiba ABL Pattern High light Measurement point d) Adjust the high light. (Refer to table 1, 2 in adjustment position by mode) - Adjust red gain (x) and blue gain (y) to the color coordinates. ( x : 263, y : 267 ) * Do not adjust the green gain and sub-contrast (Y) data.
3 Alignments and Adjustments 3-7 3-4 TORINO Micom Update 3-4-1 Installing G-Probe 1. Uncompress GProbe5.1.0.18.zip. 2. Run GProbe5.1.0.18.exe. 3. The files are created in the C: Program FilesGenesis MicrochipGProbe 5 folder. 4. Copy the ispoak_spi.hex file to the C: Program FilesGenesis MicrochipGProbe 5 folder. 5. Uncompress FLI5961-AC_GProbe_S0006-CSC-33B.zip. 6. Three files are extracted (FLI5961.Chip.GProbe, FLI5961.chm, outputlog.txt). 7. Copy all 3 files to the C: Program FilesGenesis MicrochipGProbe 5ChipDB folder. 8. Run GProbe.exe in the C: Program FilesGenesis MicrochipGProbe 5 folder. The G-Probe program is created.
3 Alignments and Adjustments 3-8 3-4-2 Connecting to the MAIN PCB Switch off Connect to the PCConnect to the MAIN PCB.
3 Alignments and Adjustments 3-9 3-4-3 Update Procedures 1. Open mgm.txt in the C:Program FilesGenesis MicrochipGProbe 5 folder. 2. The following result will appear. // // Batch file to program a sPI serial flash using ISP. // Moving the stack to high memory area is now taken care of in IROM // through the Reset 0 command. Assumes the ISP driver is in the same // directory as this file. Change ISP driver path in fastFlashWrite // command, if different from current directory. // debugon SetBuffer 0x2000 0x800 delay 200 Reset 0 delay 500 // SPI flash driver RAMWrite ispoak_spi.hex Run 0x500 delay 100 // Optional - Get Flash ID. The second parameter is a dont care //FLASHCRC 0xff0000 0x20000 // Command delay for flash erase SetDelay 1000 9000 FlashErase // Command delay for flash write. This is for each flash write packet (upto 4 k Bytes) SetDelay 1000 3000 // Change this line to point to a file in a different location, if needed //fastFlashWrite C: ProjOAKAPP-59xxdebugobj59xx_proj.hex fastFlashWrite C: C:Program FilesGenesis MicrochipGProbe 5T_TRNNUS.hex // Optional - Get CRC of 128 kByte flash. For other sizes, change second parameter // accordingly //FLASHCRC 0x80000 0x20000 // to reset the monitor after programming the flash using DDC2BI ONLY: // Un-comment the following three lines (PLEASE - FOR DDC2BI PORT SELECTED ONLY) //0x8000=1 //0x8003=0 //0x8027=1
The Micom program is to be copied to the folder marked in red and the name of the program is to be the same as the file name marked in blue. (If the Micom program is not in the folder marked in red, change the path to the folder which includes the Micom program and then save the file.) 3. When completing all the procedures above, connect the Jig and the PCB, and run the G-Probe program. After that Enter test 10 as shown in the following figure and press Enter or click the Execute button. If the result appears as shown in the following figure, it is properly connected. 3 Alignments and Adjustments 3-10
3 Alignments and Adjustments 3-11 4. Enter batch mgm.txt as show in the following figure and press Enter or click the Execute button to update Micom. If the MICOM update is successfully completed, the above message appears.
11 Disassembly and Reassembly 11-1 11 Disassembly and Reassembly This section of the service manual describes the disassembly and reassembly procedures for the LE23T51B/LE27T51B/LE32T51B TFT-LCD monitors. WARNING: This monitor contains electrostatically sensitive devices. Use caution when handling these components. (ONLY LE32T51B) Check the connector of POWER BOARD which are CNM 802, 803. IF Panel MARK is A(AUO), The wire which is from PANEL INVERTER Must be connected into CNM 803. IF Panel MARK is S(Sec), The wire which is from PANEL INVERTER Must be connected into CNM 802. 11-1 Disassembly Cautions: 1. Disconnect the monitor from the power source before disassembly. 1. Place LCD-TV face down on cushioned table. Remove 14 screws from the rear-cover and Remove stand. 2. Remove 2 screws from the cover-jack. Lift up the rear-cover.