Home
>
Panasonic
>
Ventilation
>
Panasonic Ventilating Fan Fv-08vsl2, Fv-10vsl2 Installation Instructions
Panasonic Ventilating Fan Fv-08vsl2, Fv-10vsl2 Installation Instructions
Have a look at the manual Panasonic Ventilating Fan Fv-08vsl2, Fv-10vsl2 Installation Instructions online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 10737 Panasonic manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
INSTALLATION (BETWEEN JOIST MOUNTING ) CONTINUED3. Insert the fan body between joists. Make sure the fan body is level and square (perpendicular) with the joists. (Fig.17) CAUTION: Backside of flange should mount directly to bottom of joist. 5. Secure the suspension bracket to fan body by using screws (ST4.2X12). (Fig.19) 4. Secure the suspension bracket to joists by using long screws (ST4.2X20). (Fig.18, Fig.19) 6. Follow step 5 to 11 of installation (page 7~ page 8) to complete the installation work. INSTALLATION (WOODEN HEADER ) 2. Install header between joists by using nails or screws. 1. Before installation, secure the fan body to adaptor by using machine screw (M4X8) (Fig.13 of page 10). Secure the lighting unit to fan body (refering to Fig.6 of page 8). 3. Install the fan body and secure it by using long screws (ST4.2X20). (Fig.20, Fig.21 of page 12) Joists Fan body Unit: inches (mm) Suspension bracket Adaptor Junction box 13 1/4~ 15 1/ 2(336 ~394) 16 1/ 2~ 18 3/ 4(419~ 480) 21 1/ 4~ 23 1/ 2(540~ 597) B Fig. 17 Fig. 18 Fig. 19 Fig. 20 2 Long screws (ST4.2X20) Joist 4 Long screws (ST4.2X20) 2 Screw (ST4.2X12) Joist Joist Joist Adaptor Fan body Unit: inches (mm) Header /414 3 7(3 5)(2 )7510 7/8 11
INSTALLATION (WOODEN HEADER ) CONTINUED4. Follow step 5 to 11 of installation (page 7 ~ page 8) to complete the installation work. 1. Installation in existing construction. Installing the fan body in an existing building requires an accessible area (attic or crawl space) above the planning installation location or existing ducting and wiring. (1) To install the fan body, follow the procedures described in lnstallation . Take the following precautions before installation. (3) Install fan body. (2) Inspect duct work and wiring before proceeding with installation. (3) Plan suitable location for fan body. (next to ceiling joist) (4) Before installation, provide inspection and maintenance access at a location that will not interfere with installation work shown in installation (5) First, remove ceiling section according to Fig.6 of page 8. (6) Install fan body. (1) Inspect duct work and wiring before proceeding with installation. (2) Remove ceiling section according to Fig.6 of page 8. 2. Installation from accessible area above fan location. CAUTION: Check area above planning installation location to be sure that: 1. Duct work can be done and that area is sufficient for proper ventilation. 2. Wiring can be run to planning location. 3. No wiring or other obstructions shall interfere with installation. Junction box Circular duct 6 Long screws (ST4.2X20) Junction box Green wires Conduit Wire nut Lead wires Fig. 21 INSTALLATION (IN EXISTING CONSTRUCTION ) 12
MAINTENANCE (CLEANING ) WARNING: CAUTION: Disconnect power source before working on unit. Routine maintenance must be done every year. 1. Never use petrol, benzene, thinner or any other such chemicals for cleaning the ventilating fan. 2. Do not damp water to enter motor. 3. Do not soak resin parts in water over 140 F(60 C). 1. Remove grille. (Squeeze mounting spring and pull down carefully.) (Fig.22) 2. Wash and clean grille. (Use non-abrasive kitchen detergent, wipe dry with new cloth.) (Fig.23) 4. Using a cloth dampened with kitchen detergent, remove any dirt from fan body. Wipe dry with new cloth. (Fig.25) 3. Remove dust and dirt from fan body using a vacuum cleaner. (Remove lamps if necessary.) (Fig.24) 5. Replace lamps and grille. MAINTENANCE (REPLACEMENT OF LAMP ) WARNING: 1. Disconnect power source before working on unit. 2. The lamp s glass is fragile. Please handle with care. To remove lamp, grasp at base and move back and force to loosen. Do not pull hard on the lamp or you may break the glass. 3. 4W night lamp has threaded base. Remove by turning counterclockwise. Slot Mounting spring Vacuum cleaner Gloves Grille Fig. 22 Fig. 23 Fig. 24 Fig. 25 13
MAINTENANCE (REPLACEMENT OF LAMP ) CONTINUED 1. Remove grille. (Squeeze mounting spring and pull down) (Fig.22 of page 13) 2. Disconnect connector or connector from lighting unit. (Fig.26) 3. Replace the fluorescent lamp (Panasonic FHT32E35 32W) or the 4 W night lamp, connect the connector or connector and replace the grille. (Fig.27) PRACTICAL GUIDE TO INSTALLATION Fig. 26 Plug connector Plug connector Receptacle Receptacle Fluorescent lamp 4 W Night Lamp 14 4 inches or 6 inches roof jack, wall cap, or soffit vent with backdraft damper Mechanically connect duct to termination and seal with mastic or approved foil faced tape 2-3 ft straight run before elbow In attic installation, caulk box to drywall Short piece of flexible duct helps alignment and absorbs sound. Clamps plus mastic or approved foil faced tape at all flex joints Foil tape tightly covers all metal duct joints (glue PVC joints)Insulation Fig. 28 Properly insulate the area around the fan to minimize building heat loss and gain. (Fig.28) Loose fill or batt insulation can be placed directly over the fan housing in the attic. Our fans and fan/light combination units do not create excessive heat that is a common problem with recessed light fixtures or some competitors fan/light combinations. Our efficient, cool-running motors and our fluorescent lamp do not create enough ambient heat to be subjected to these limitations. Fig. 27
PRODUCT SERVICE Warning Concerning Removal of Covers. The unit should be serviced by qualified technicians only. Your product is designed and manufactured to ensure a minimum of maintenance. Should your unit require service or parts, call Panasonic Call Center at 1-866-292-7292 (USA) or 1-800-669-5165 (Canada). 32 FV-10VSL2 SPECIFICATIONS Model Air directionVoltage (V) Frequency (Hz) Duct diameter (inches) Noise (sones) Power consumption (W) Fluorescent lamp Lighting unit Fan body Night lamp Speed Air deliver at 0.1 WG Weight (cfm) FV-08VSL2 Exhaust Exhaust120 12060 60 4 41.3 1.5 26 34 32 4 4805 880 80 100 13 (5.9) 13 (5.9) HVI Certified performance based on HVI Procedures 915, 916 and 920. 15
T0212-0 08VSL2420Panasonic Corporation of North America One Panasonic Way, Secaucus, New Jersey 07094 www.panasonic.com Panasonic Canada lnc. 5770 Ambler Drive, Mississauga, Ontario L4W 2T3 www.panasonic.ca Printed in China Panasonic corporation 2012