Home
>
Panasonic
>
Air Conditioner
>
Panasonic Mva Series Air Handling Unit 035 000039 001 Installation Operation And Maintenance Manual
Panasonic Mva Series Air Handling Unit 035 000039 001 Installation Operation And Maintenance Manual
Here you can view all the pages of manual Panasonic Mva Series Air Handling Unit 035 000039 001 Installation Operation And Maintenance Manual. The Panasonic manuals for Air Conditioner are available online for free. You can easily download all the documents as PDF.
Page 1
035-000039-001 Page 1 of 38 MVA IOM 1.0 4-25-2014 MVA Series units are direct drive vertical and multi-position Air Handlers delivering nominal cooling capacities of 1.5 to 5 tons. Units may be specified with hot water or elec- tric heating coils to meet space cooling loads or heating loads or both. Three return air con- figurations are available for maximum flexibil- ity. How to Use this Manual: This manual gives instructions regarding in- stallation, operation and maintenance for the MVA Series air...
Page 3
035-000039-001 Page 3 of 38 MVA IOM 1.0 4-25-2014 /ŶƐƚĂůůĂƟŽŶ͕^ƚĂƌƚ-Up and Service /ŶƐƚƌƵĐƟŽŶƐ MVA Series Air Handling Unit Installation, Operation and Maintenance Manual Topic Page SAFETY CONSIDERATIONS1, 5 PRODUCT NOMENCLATURE6-7 UNPACKING8 INSTALLATION8 Pre -insta lla tion8 Rigging8 Unpa cka ging8 Se rvice Cle a ra nce s8,11,12 Re turn Air & Unit Orie nta tion9 Ve rtica l to Horizonta l Conve rsion (EEV)10 Unit Suspe nsion or Floor Mount8,13,14 Conde nsa te Dra in13 Ductw ork13 Re frige ra nt...
Page 5
035-000039-001 Page 5 of 38 MVA IOM 1.0 4-25-2014 WARNING CHECK the assembly and component weights to be sure that the rigging equipment can handle them safely. Note also, the centers of gravity and any specific rigging instructions. CHECK for adequate ventilation so that fumes will not migrate through ductwork to occupied spaces when welding or cutting inside air-handling unit cabinet or plenum. WHEN STEAM CLEANING COILS be sure that the area is clear of personnel. DO NOT attempt to handle access covers...
Page 6
035-000039-001 Page 6 of 38 MVA IOM 1.0 4-25-2014 PRODUCT NOMENCLATURE Unit Type/Size Code Selection 01, 02 MV Generation/Series Code Selection 03 A Unit Type/Size Code Selection NOM Capacity 18 24 3030,000 Btu/hr 36 42 48 60 Primary Coil Type Code Selection 06F4 ROW DX with electronic expans ion valve, R-410a Heating Coil Code Selection B C D E F G H I19.5 kW - s ingle phas e w/circuit breaker only * 1 s tage (s ize 42, 48, 60) Notes: * Future Use Description Code Selection 08A 1. Electric Heat KW rated...
Page 7
035-000039-001 Page 7 of 38 MVA IOM 1.0 4-25-2014 Unit Grade Description Code Selection 09S Unit Voltage Code Selection 106 Controls Code Selection 11 H Return Air Cabinet Options Ordering Number Code Selection Return Location BBottom Return RRight Return LLeft Return TBottom Return Drain Pan Code Selection C D G H Tracking Description Code Selection 14P Vert ic al (Fro nt RH C o ndD rain Cnx) Unit Orientation H o rizo ntal Lef t o rVert ic al (F ro nt LHC o ndens at e D rain Cnx) Panas onic 12 Note:...
Page 8
035-000039-001 Page 8 of 38 MVA IOM 1.0 4-25-2014 Pre-installation 1. Check items received against packing list. 2. Do not stack unit components or accesso- ries during storage. Stacking can cause damage or deformation. 3. If unit is to be stored for more than 2 weeks prior to installation, observe the following precautions: a. Choose a dry storage site that is rea- sonably level and sturdy to prevent un- due stress or permanent damage to the unit structure or components. Do not store unit on vibrating...
Page 9
035-000039-001 Page 9 of 38 MVA IOM 1.0 4-25-2014 INSTALLATION Figure 1 Return Configurations and Unit Orientations NOTE: Electronic Expansion Valve (EEV) must be ori- ented vertically, and is shipped for vertical cabi- net orientation. For horizontal cabinet orientation, follow proce- dure to rotate the EEV assembly.Refer to Fig- ure 2. WARNING FOR HORIZONTAL CABI- NET ORIENTATION, EEV MUST BE ROTATED TO VERTICAL POSITION! Failure to reorient the EEV can result in im- proper unit operation or equipment...
Page 10
035-000039-001 Page 10 of 38 MVA IOM 1.0 4-25-2014 INSTALLATION—VERTICAL TO HORIZON- TAL CONVERSION—EEV ROTATION WARNING FOR HORIZONTAL CABINET ORIENTATION, EEV MUST BE ROTATED TO VERTICAL POSITION! Failure to reori- ent the EEV in VERTICAL position can result in improp- er unit operation or equip- ment damage or dangerous condition. CONVERSION PROCEDURE: 1. UNIT IS SHIPPED WITH NITROGEN CHARGE. IF UNIT HAS ALREADY BEEN CHARGED WITH REFRIGERANT, REMOVE RE- FRIGERANT CHARGE PER LOCAL CODES BE- FORE...