Home > Panasonic > Print Board > Panasonic Electronic Board Ub 780bp Operating Instructions

Panasonic Electronic Board Ub 780bp Operating Instructions

    Download as PDF Print this page Share this page

    Have a look at the manual Panasonic Electronic Board Ub 780bp Operating Instructions online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 10737 Panasonic manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							Assembling the elite Panaboard
    Note•There are 2 types of lower frame covers for the
    elite Panaboard: a lower frame cover made
    from 2 parts and a lower frame cover made from
    1 part.
    If you will be mounting elite Panaboard on a
    wall, the assembly procedure will differ
    depending on the type of lower frame cover.
    Follow the steps below:
    When the lower frame cover is secured with 4
    screws (2 parts)  ® Page 41
    When the lower frame cover is secured with 2
    screws (1 part)  ® Page 43
    For Wall Mounting (with 2-part lower
    frame cover)
    1. Remove the screw ( A) of the attachment cover
    ( B ), which is fixed to the attachment board, and
    slide the attachment cover down.
    Ensure that the attachment cover and the screw
    hole ( C) of the board attachment are aligned.
    After unscrewing the attachment cover screws ( A),
    fix them in the holes after sliding the attachment
    cover down, as shown in the right-sided illustration
    above.
    2. Hang the elite Panaboard on the wall mounting
    plates with the screw heads.
    Operating Instructions (For Basic Operations)41
    1
    Installation Manual12
    2   2 1
    3   
    						
    							3.Unscrew the 4 screws from the front lower
    frame cover.
    4. Lift the bottom of the front lower frame cover to
    remove it.
    5. Fasten to the wall.
    Fasten the lower portion of the board attachment
    securely to the wall.
    6. Attach the front lower frame cover.
    Attach the front lower frame cover to the elite
    Panaboard and fix it using 4 screws, ensuring that
    the cover is flush with the main unit.
    Notice
    •When mounting on a wall, do not hit or jolt
    the elite Panaboard.
    • After mounting, gently apply some weight
    on the elite Panaboard to make sure that it
    is securely fastened to the wall.
    42Operating Instructions (For Basic Operations)Installation Manual     
    						
    							7.Wipe the screen board surface.
    Gently wipe the screen board surface with a soft,
    moist cloth.
    Notice
    •Do not use thinner, benzene, or abrasive
    chemicals to clean.
    (Doing so can result in discoloration.)
    8. Confirm that the elite Panaboard can operate.
    See "Confirming the elite Panaboard
    Operation" (page 47).
    For Wall Mounting (with 1-part lower
    frame cover)
    1. Remove the screw ( A) of the attachment cover
    ( B ), which is fixed to the attachment board, and
    slide the attachment cover down.
    Ensure that the attachment cover and the screw
    hole ( C) of the board attachment are aligned.
    After unscrewing the attachment cover screws ( A),
    fix them in the holes after sliding the attachment
    cover down, as shown in the right-sided illustration
    above.
    2. Hang the elite Panaboard on the wall mounting
    plates with the screw heads.
    Operating Instructions (For Basic Operations)43
    1
    Installation Manual 2 1
    3   
    						
    							3.Remove the lower frame cover.
    Remove the left and right screws, and then remove
    the lower frame cover from the main unit of the elite
    Panaboard.
    4. Fasten to the wall.
    Using the remaining 4 screws, securely fasten the
    lower portion of the board attachment to the wall.
    5. Reattach the lower frame cover.
    Attach the lower frame cover to the lower side of the
    elite Panaboard, and tighten both left and right
    screws so that the cover does not protrude.
    How to Attach the Lower Frame Cover
    a.Holding the lower frame cover with both
    hands, slide it into the guides on both sides.
    b. Push the lower frame cover backward ().
    While keeping the lower frame cover's rib
    against the rear side of the guides, push the
    lower frame cover upwards (
    ).
    44Operating Instructions (For Basic Operations)Installation ManualLower Frame Cover   1 2 B
    Guide
    Rib
    A  
    						
    							c.Pull the lower frame cover ().
    While keeping the rear section of the lower
    frame cover against the rear of the board, push
    the lower frame cover up into the rear of the
    board (
    ).
    d. Push the lower frame cover backward ().
    Push the entire lower frame cover up until both
    ends lock into place (
    ). Fasten the 2 screws
    on the bottom side.
    Notice
    •Be careful not to cut yourself on the board
    attachments when attaching the lower
    frame cover.
    • When mounting on a wall, do not hit or jolt
    the elite Panaboard.
    • After mounting, gently apply some weight
    on the elite Panaboard to make sure that it
    is securely fastened to the wall.
    6. Wipe the screen board surface.
    Gently wipe the screen board surface with a soft,
    moist cloth.
    Notice
    •Do not use thinner, benzene, or abrasive
    chemicals to clean.
    (Doing so can result in discoloration.)
    7. Confirm that the elite Panaboard can operate.
    See "Confirming the elite Panaboard
    Operation" (page 47).
    Operating Instructions (For Basic Operations)45
    1
    Installation Manual1 2 B
    A 1 2 AB   
    						
    							For Mounting on a Stand (Sold
    Separately)
    1. Hang the elite Panaboard on the stand with the
    screw heads.
    2. Secure the elite Panaboard to the stand frame
    using the two-wing bolts (M5  ´ 12 mm [ 1
    /2  in.]
    [2 count]) included with the stand.
    Note
    •When installing the elite Panaboard on the
    stand, you can adjust its height to 4 different
    levels.
    When changing the height, remove the left
    and right screws from the back of the elite
    Panaboard, and securely insert them at the
    desired height. Torque (greater than 1 N·m
    [10 k gf·cm (9 lbf·in.)]).elite Panaboard
    HeightScrew Position-100 mm (-3  7
    /8  in.)HighestStandard2nd from top+100 mm (+3  7
    /8  in.)2nd from bottom+200 mm (+7  7
    /8  in.)Lowest
    3. Wipe the screen board surface.
    Gently wipe the screen board surface with a soft,
    moist cloth.
    Notice
    •Do not use thinner, benzene, or abrasive
    chemicals to clean.
    (Doing so can result in discoloration.)
    4. Confirm that the elite Panaboard can operate.
    See "Confirming the elite Panaboard
    Operation" (page 47).
    46Operating Instructions (For Basic Operations)Installation Manual    
    						
    							Confirming the elite Panaboard OperationAfter assembling the elite Panaboard, confirm that it operates properly by following the procedure below.Action
    CheckpointsOperationMeasure1Connect to a computer
    using a USB cable.Green LED lights.(Normal operation)Green LED does not light, or
    red LED is blinking.Check the USB cable.
    • Check if the USB cable is connected
    properly.
    • Disconnect the USB cable from the
    computer, and then connect it again.
    Confirming the Interactive Features
    1.Following the procedure in  "Installing the elite Panaboard software " (page  17), install the software
    and, and connect the included USB cable.
    2. Confirm that the interactive features are operating correctly.
    • If a projector is not available, confirm operation using only the elite Panaboard and computer.
    • When the elite Panaboard software starts, the calibration screen is displayed on the computer screen.
    • Perform tentative calibration by pressing the 5 points on the elite Panaboard with the electronic pen,
    as shown in the illustration below.
    For precise adjustment, it is necessary to use a projector.
    • With the elite Panaboard software running, enter White Background mode and select the marker tool.
    Confirm operation by writing on the screen board with the electronic pen and checking that the writing
    is displayed on the computer's screen. (Your writing with the electronic pen will not appear on the
    screen board itself.)
    Operating Instructions (For Basic Operations)47
    1
    Installation ManualApprox. 
    100 mm (3 7/8 in.) Approx. 100 mm (3 
    7/8 in.)
    1
    34
    5
    2  
    						
    							RepackagingTo repackage the elite Panaboard, perform steps in the following  "Assembling the elite Panaboard " in reverse.
    • For Wall Mounting (with 2-part lower frame cover)  ® page 41
    • For Wall Mounting (with 1-part lower frame cover)  ® page 43
    • For Mounting on a Stand (Sold Separately)  ® page 46
    Package the unit as depicted in the diagram in "Preparing for Removing the elite Panaboard from Its
    Packaging" (page 40), and reinforce the packaging with tape or 2 bands.Notice• When handling the screen board, hold it by the frame and not the screen board itself. (Holding the
    screen board can result in the damage.)48Operating Instructions (For Basic Operations)Installation Manual 
    						
    							Operating Instructions (For Basic Operations)49
    1
    Notes 
    						
    							50Operating Instructions (For Basic Operations)
    Notes 
    						
    All Panasonic manuals Comments (0)

    Related Manuals for Panasonic Electronic Board Ub 780bp Operating Instructions