Panasonic Electronic Board Ub 780bp Operating Instructions
Have a look at the manual Panasonic Electronic Board Ub 780bp Operating Instructions online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 10737 Panasonic manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Included AccessoriesConfirm that the following items are included with the elite Panaboard.No.Part NameIllustrationQ’tyRemarksUSB Cable (5 m [16 ft. 4 7 /8 in.])1For computer connection CD-ROM1 Operating Instructions (For Software) Drivers Application software Wall Mounting Plate (Left)1—Wall Mounting Plate (Right)1—Battery (LR03 AAA alkaline battery)1For electronic penElectronic Pen1—Penpoint (Replacement)2For electronic penOperating Instructions1 Operating Instructions (For Basic Operations) (includes Installation Manual) Warranty1 May not be included depending on country/ area. Notice •Screws (8 count) for wall mounting are not included. Please purchase screws with a size of M6, appropriate for your type of wall (page 34). Operating Instructions (For Basic Operations)31 1 Installation Manual
Wall Mounting Construction Checking the Wall When mounting on a wall, consult with your building's owner, caretaker or construction manager to determine if the wall strength is sufficient to install the elite Panaboard. For safety, install the elite Panaboard only after thoroughly understanding the type of walls, the appropriate types of screws and the construction method (Page 34). CAUTION Do not attach the electronic board to mortared walls. Accidental electric leakage from the wall mounting plate bolts to metal laths or wire laths can cause heat, smoke or fire. I. Necessary Tools and Parts (not included with the elite Panaboard) Drill, Screwdriver, Measuring tape, Level 8 screws (M6 size) II. Before Starting 1. Make sure that the wall is strong enough to support the elite Panaboard. Rated strength: greater than 1,324 N (135 k gf) Notice •If necessary, reinforce the wall so that it is strong enough to support the elite Panaboard. 2. Make sure that the location is large enough to accommodate the elite Panaboard. Height: greater than 2,100 mm (6 ft. 10 5 /8 in.) Width: greater than 2,000 mm (6 ft. 6 3 /4 in.) 32Operating Instructions (For Basic Operations)Installation Manual
Installing the Wall Mounting Plates1.Ensure that the wall is strong enough to support the elite Panaboard. Rated strength: greater than 1,324 N (135 k gf) 2. Using the measuring tape and level, mark the 8 locations to insert the screws. Note •The dotted line in the illustration represents the outer edge of the elite Panaboard. 3. Drill 8 holes for the wall mounting plates. • Drill holes that are appropriate for the screws you are using. 4. Install the wall mounting plates using the 4 screws. • 2 screws are used for each wall mounting plate. The remaining 4 screws are used after installing the elite Panaboard on the wall. • Screws (8 count) are not included with the elite Panaboard. Please purchase screws with a size of M6, appropriate for your type of wall. Operating Instructions (For Basic Operations)33 1 Installation Manual813 mm (2 ft. 8 in.) 40 mm (1 9/16 in.) 982 mm (3 ft. 2 21/32 in.) 30 mm (1 3/16 in.) 44 mm (1 23/32 in.) 222.5 mm (8 3/4 in.) 469.5 mm (1 ft. 6 15/32 in.) 725 mm (2 ft. 4 17/32 in.) 40 mm (1 9/16 in.) 982 mm (3 ft. 2 21/32 in.) 30 mm (1 3/16 in.) 44 mm (1 23/32 in.) 813 mm (2 ft. 8 in.)
•Tighten the bolt so that it will not become loose. • When drilling the holes and installing the wall mounting plates, follow the procedure in "Wall Types and Installation Procedures" (page 34). 5. Mount the elite Panaboard on the wall. See "Assembling the elite Panaboard" (page 41). Wall Types and Installation Procedures The method for attaching the wall mounting plates to the wall will vary depending on the wall's structure. Three available options are listed below. Other methods may be necessary depending on the wall. Metal or Concrete wallsStud plugs (not included) are needed.Drill eight holes in the wall. For the correct hole size, refer to the instructions for the particular stud plugs used.Insert the bolt through the hole in the wall mounting plate and tighten until the wall mounting plate is securely fixed to the wall.34Operating Instructions (For Basic Operations)Installation ManualDrill bit Metal or concrete wall Stud plug Wall mounting plate Bolt Insert a stud plug in the hole.
Plasterboard wallsSplit-wing toggles (not included) are needed.Insert the bolt through the hole in the wall mounting plate and into the hole in the wall so that the arms of the split-wing toggle are horizontal. For the correct hole size, refer to the instructions for the particular split-wing toggles used. After the arms expand, pull the wall mounting plate out until the arms of the split-wing toggle grip firmly into the wall. Tighten the bolt until the wall mounting plate is securely fixed into the wall. Wooden walls Wood screws (not included) are needed.Insert the wood screw through the hole in the wall mounting plate and tighten until the wall mounting plate is securely fixed to the wall. For the correct hole size, refer to the instructions for the particular wood screws used.Operating Instructions (For Basic Operations)35 1 Installation ManualPlasterboardSplit-wing toggleWall mounting plate Bolt Arms Arms Wall mounting plate Wood screw Wooden wall
Stand Assembly (Sold Separately) Included Parts Check that the following parts are included with the stand (KX-B061).No.Part NameIllustrationQ'tyStand Base2Support Beam2Cross Bar (A)2Cross Bar (B)1Screw (M6 ´ 45 mm [1 3 /4 in.])10Two-wing Bolt (M5 ´ 12 mm [ 1 /2 in.]) *12Support Bracket2 Fall-prevention Extension Leg4Screw (M6 ´ 60 mm [2 3 /8 in.])4Nut4Wrench *21Washer10 *1 Use the two-wing bolts () when securing the elite Panaboard to the stand. *2 The included wrench is necessary for tightening and loosening the screw ( ), so keep it in a safe location. 36Operating Instructions (For Basic Operations)Installation Manual
CAUTIONBefore assembly, be sure to lock the casters. Assembly Instructions 1.Assemble the fall-prevention extension legs. Operating Instructions (For Basic Operations)37 1 Installation ManualLocking the casters (Push this side)
2.Assemble the stand. Notice •Do not over-tighten the screw ( ). (Doing so can warp the support beams.) • Assemble the stand so that the locking casters are on the rear side. 38Operating Instructions (For Basic Operations)Installation ManualREAR FRONT Assemble with the holes toward the front. Locking caster side (rear) Locking caster side (rear)
3.Pull the fall-prevention extension legs down.Note •When folding back the fall-prevention extension legs, release the lock as follows ( , ). 4.Mount the elite Panaboard. See "Assembling the elite Panaboard" (For Mounting on a Stand (Sold Separately) ® page 46). Operating Instructions (For Basic Operations)39 1 Installation Manual2 1 1 2 1 1 2
Assembly Instructions Preparing for Removing the elite Panaboard from Its Packaging Open the box, remove the accessory box & packing foam and open the plastic sheet of the elite Panaboard. Notice•When handling the screen board, hold it by the edge frame and not the screen board itself. (Holding the screen board can result in damage.) • The packing materials in the shipping box are necessary for repackaging, so keep them in a safe place. Note •The warranty may not be included depending on country/area. 40Operating Instructions (For Basic Operations)Installation ManualShipping Box Shipping Box Electronic Board [Accessory Box Contents] • USB Cable 1 CD-ROM 1 Wall Mounting Plate (Right, Left) 1 (Each) Battery 1 Electronic Pen 1 Penpoint 2 Operating Instructions 1 Warranty 1....... ................... ........... ................ ............................... ................ .....