Page 21
1. Installing the Cabinet 1-19 SYSTEM CONFIGURATION - U SLOT U Slot Default Settings If you have a U Slot system (software version 02.**.**), fol- lowing are the default configurations. If you have a fixed slot system (software 01.**.**), turn to page 1-20. 4 Slot Cabinet with CPU P/N 80025 Default configuration: 16 trunks x 32 extensionsSlot CN1 = 16 DSTU PCB (Extensions 300-315) Slot CN2 = 16 DSTU PCB (Extensions 316-331) Slot CN3 = 8 ATRU PCB (Trunks 1-8) Slot CN4 = 8 ATRU PCB (Trunks 9-16) 4 Slot...
Page 22
1-20 SYSTEM CONFIGURATION - FIXED SLOT Fixed Slot Configuration Guidelines Fixed Slot systems use software version 01.**.**. The maxi- mum configuration of your fixed slot system is 16 trunks and 32 extensions. Also see Where to Install the PCBs in your Fixed Slot Systemon page 2-5. Load factor in your fixed slot system is an issue only if you have DSS Consoles and 2-OPX Modules installed (see the System Load Factor Calculationschart on page 1-18). Exceeding the load factor will cause your system’s power...
Page 23
2. PCB Installation 2-1 Section 2, PCB INSTALLATION AND STARTUP In this section . . . Page Installing PCBs (cont’d) Analog Trunk (8ATRU and 4ATRU) PCB . . 2-11 8 Circuit Caller ID Daughter Board . . . . . . . 2-12 4 Circuit Caller ID Daughter Board . . . . . . . 2-14 Connecting Blocks . . . . . . . . . . . . . . . . . .2-16 Working with 8-Pin Jacks . . . . . . . . . . . . . . . 2-16 Punching Down the Cables . . . . . . . . . . . . . . 2-16 Making your own Cables . . . . . . . . . . . . . . . 2-16 In...
Page 24
PCB LOCATION - U SLOT 2-2 Where to Install the PCBs in your U Slot System (Figures 2-1 and 2-2) Review System Configuration - U Sloton page 1-17 before installing any PCBs. When installing PCBs in a U Slot 4 slot system, follow Figure 2-1. You mustinstall a 16DSTU in slot CN1. When Installing PCBs in a U Slot 8 slot system, follow Figure 2-2. You mustinstall a 16DSTU in slot CN1. Item Description Location Max.CPU Central Processing Unit CN0 1 16DSTU 16 Digital Stations CN1 1All other PCBs CN2-CN8 7...
Page 25
2. PCB Installation 2-3 PCB LOCATION - U SLOT Figure 2-1 4 SLOT PCB LOCATION Power Supply CPU 16DSTU (300-315) 16DSTU (316-331) 16DSTU (332-347) 16DSTU (348-363) 80000 - 58 P/N 80005/A P/N 80025A P/N 80021/A Power Supply CPU 16DSTU (300-315) 16DSTU (316-331) 8ATRU (1-8) 8ATRU (9-16) 80000 - 58 P/N 80005/A P/N 80025 P/N 80021/A P/N 80021/A P/N 80011/A Ext. 401-408 P/N 80011/A Ext. 409-416 Default U Slot setup with CPU P/N 80025 Delete this slot! Delete this slot! Delete this slot! Default U Slot setup...
Page 26
PCB LOCATION - U SLOT 2-4 Power Supply Power Supply (if required) Power Supply (if required) CPU 16DSTU PCB (300-315) 16DSTU PCB (316-331) 16DSTU PCB (332-347) 16DSTU PCB (348-363) 16DSTU PCB (364-379)8ATRU PCB (1-8) 8ATRU PCB (9-16)8ATRU PCB (17-24) 80000 - 59 P/N 80005A P/N 80005A P/N 80005A P/N 80025A P/N 80021A P/N 80021AP/N 80021A P/N 80021A P/N 80021AP/N 80011AExt. 401-408 Ext. 409-416Ext. 415-424 P/N 80011A P/N 80011A !! Important !! When plugging in PCBs:Use the default assignments shown in the...
Page 27
2. PCB Installation 2-5 PCB LOCATION - FIXED SLOT Where to Install the PCBs in your Fixed Slot System (Figure 2-3) Maximum Configuration: 16 Trunks 32 Extensions Follow the chart below and Figure 2-3 when installing PCBs. Item Description Location Max.CPU Central Processing Unit CN0 1 16DSTU 16 Digital Stations CN1 and CN2 2ASTU 4 or 8 Analog Stations CN2 1 8ATRU 8 Analog Trunks CN3 and CN4 2 Figure 2-3 FIXED SLOT PCB LOCATION Power Supply CPU 16DSTU (300-315) 16DSTU (316-331) 4ASTU (316-319) 8ASTU...
Page 29
2. PCB Installation 2-7 INSTALLING PCBs Central Processing Unit (CPU) PCB(Figure 2-4) The CPU provides:The system’s central processing, stored program and memory for the customer’s site-specific data.PC Card interface.Conference circuits, DTMF receivers and DTMF generators.External music input and on-board synthesized music source.External paging output and associated relay.Real Time Clock Battery for short term (14 day) backup of the customer’s site-specific data. Figure 2-4 CPU PCB d on ul-
Page 30
INSTALLING PCBs 2-8 Installing the CPU(Figures 2-5 and 2-6) CPU PCB installs in the CN0 slot in the Main Equipment Cabinet. To install the CPU PCB: 1. Slide the Mode Switch to the RUN position (see Figure 2-5). 2. Insert the battery into the battery clips. 3. Plug the CPU into slot CN0 (see Figure 2-6). Refer to Part 4, Installing Optional Equipmentfor instructions on connecting the music source, External Paging and the auxiliary relay. Figure 2-5 Setting up the CPU Figure 2-6 INSTALLING THE CPU 80000...