DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Site Requirements 
31 Floor-Plan Guidelines 
Floor-Plan Guidelines
DEFINITY ECS floor plans vary with the size and shape of the equipment room and the 
extent of future growth. Future growth includes a new or upgraded system, adjuncts and 
peripherals, and the cross-connect field. See ‘‘Cross-Connect Field’’ on page 41.
For floor standing cabinets, reserve the area behind a cabinet for the...

Page 42

Site Requirements 
32 Floor-Plan Guidelines 
DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Figure 10. Typical Compact Modular Cabinet Floor Plan
NOTE:
To provide power for testing equipment and peripherals, locate electrical 
outlets at intervals that are in accordance with local codes. Also, ensure 
that you locate the main shutoff switch near the door in accordance with 
local codes.
Cross-connect field
Electrical
outlets
Ta b l e...

Page 43

DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Site Requirements 
33 Floor-Plan Guidelines 
Single-Carrier Cabinet Configuration Guidelines
The cross-connect field can be directly behind the cable slack manager. To allow service 
access, the table for the management terminal and optional printer is away from the 
equipment area. See Figure 11 and ‘‘Table Area’’ on page 40 for requirements.
The following steps are pre-installation guidelines:
1....

Page 44

Site Requirements 
34 Floor-Plan Guidelines 
DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Figure 11. Typical Single-Carrier Cabinet Floor Plan
NOTE:
To provide power for testing equipment and peripherals, locate electrical 
outlets at intervals that are in accordance with local codes. Also, ensure 
that you locate the main shutoff switch near the door in accordance with 
local codes.
LAN
connectionCross-connect field
Cable
slack...

Page 45

DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Site Requirements 
35 Floor-Plan Guidelines 
Multi-Carrier Cabinet Configuration 
Guidelines
The cross-connect field is directly behind the cable slack manager. To allow service 
access, the table for the management terminal and optional printer is away from the 
equipment area. See Figure 12 and ‘‘Table Area’’ on page 40 for requirements. The 
following steps are pre-installation guidelines:
1....

Page 46

Site Requirements 
36 Floor-Plan Guidelines 
DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Figure 12. Typical Multi-Carrier Cabinet Floorplan
NOTE:
To provide power for testing equipment and peripherals, locate electrical 
outlets at intervals that are in accordance with local codes. Also, ensure 
that you locate the main shutoff switch near the door in accordance with 
local codes.
Cross-connect field
Cable
slack
manager
(optional) Cable
slack...

Page 47

DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Site Requirements 
37 Floor-Plan Guidelines 
Additional Floor Plans
The following floor plans illustrate recommendations for other possible installations. See 
Figure 13, Figure 14, Figure 15, and Figure 16.
Figure 13. Typical Floor Plan with EPN and Auxiliary Cabinet
NOTE:
To provide power for testing equipment and peripherals, locate electrical 
outlets at intervals that are in accordance with...

Page 48

Site Requirements 
38 Floor-Plan Guidelines 
DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Figure 14. Typical Floor Plan with an additional EPN and Auxiliary Cabinets
NOTE:
To provide power for testing equipment and peripherals, locate electrical 
outlets at intervals that are in accordance with local codes. Also, ensure 
that you locate the main shutoff switch near the door in accordance with 
local codes.
LAN connectionCross-connect field
Ta b...

Page 49

DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Site Requirements 
39 Floor-Plan Guidelines 
Figure 15. Typical Floor Plan with Battery Cabinets
NOTE:
To provide power for testing equipment and peripherals, locate electrical 
outlets at intervals that are in accordance with local codes. Also, ensure 
that you locate the main shutoff switch near the door in accordance with 
local codes.
LAN connectionCross-connect field
Cable
slack
manager...

Page 50

Site Requirements 
40 Floor-Plan Guidelines 
DEFINITY Enterprise Communications Server Release 8.2
System Description  555-233-200  Issue 1
April 2000
Figure 16. Typical Floor Plan with ATM Switch (Category A only)
NOTE:
To provide power for testing equipment and peripherals, locate electrical 
outlets at intervals that are in accordance with local codes. Also, ensure 
that you locate the main shutoff switch near the door in accordance with 
local codes.
Ta b l e  A r e a
Reserve the table area in the...
Start reading Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Manual

Related Manuals for Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 System Description Manual

All Lucent Technologies manuals