Home
>
Lucent Technologies
>
Communications System
>
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual
Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual
Here you can view all the pages of manual Lucent Technologies DEFINITY Enterprise Communications Server Release 8.2 Administration For Network Connectivity Manual. The Lucent Technologies manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 211
Configuration 5B:R8csi R8r (2 C-LANs) R8si 191 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 2 Task — Assign Link via ppp Data Module to Switch 1 This task administers a ppp data module on Switch 2 for the ppp connection to Switch 1. The data module associates a link number with a port address, extension number, and node name for the C-LAN port used for this connection. Begin Steps > Open Data Module form — enter ad da 3020 >...
Page 212
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 192 > Submit the screen End COS: The values for these fields will be specified by the system administrator. COR: TN: Node Name: The node name for the interface defined by this data module. This must be a name entered on the Node Names screen. Subnet Mask: Establish Connection?n means that the switch at the remote end of this connection (Switch 1...
Page 213
Configuration 5B:R8csi R8r (2 C-LANs) R8si 193 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 2 Task — Assign Processor Channels This task associates data links (hardware) with processor channels (software) on Switch 1. Begin Steps > Open the Processor Channel Assignment form — enter ch com p > Enter values change communications-interface processor-channels Page 1...
Page 214
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 194 > Submit the screen End Session - Local The Local and Remote Session numbers can be any value between 1 and 256 (si model) or 384 (r model), but they must be consistent between endpoints. For each connection, the Local Session number on this switch must equal the Remote Session number on the remote switch and vice versa. It is allowed, and...
Page 215
Configuration 5B:R8csi R8r (2 C-LANs) R8si 195 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 2 Task — Assign IP Route to node-3 This task specifies a route for packets handled by node-2 that are destined for node-3. An IP route is required for this route because there are intermediate nodes between node-2 and node-3. Begin Steps > Enable the ppp link on the node-2 data module screen: ch da 3020, set Enable Link? to y. > Open the...
Page 216
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 196 Switch 3 Task — Assign Node Names This task assigns node names and IP addresses to each node in the network. This screen is administered on Switch 3. A Node Names screen must be administered on each switch in the network. The node names and IP addresses in any network should be assigned in a logical and consistent manner from the point of view...
Page 217
Configuration 5B:R8csi R8r (2 C-LANs) R8si 197 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 3 Task — Assign IP Interfaces The IP interface for each C-LAN board on the switch must be defined on the IP Interfaces form. Each DEFINITY switch in an IP network has one IP Interfaces form. Begin Steps > Open IP Interfaces form — enter ch ip-i > Enter values change ip-interfaces Page 1 of 2 IP Interfaces Inter-region IP...
Page 218
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 198 Subnet Mask Enter the subnet mask associated with the IP address for this IP interface. (The IP address is associated with the node name on the Node Names screen). In this example, leave the default subnet mask, 255.255.255.0, which indicates no subnetting for a Class C IP address. See the discussion of subnetting, Subnetting (page 16), in...
Page 219
Configuration 5B:R8csi R8r (2 C-LANs) R8si 199 Administration for Network Connectivity 555-233-504— Issue 1 — April 2000 CID: 77730 3 C-LAN Administration Switch 3 Task — Assign Link via ethernet Data Module to the LAN This task administers an ethernet data module on Switch 3 for the ethernet connection to Switch 1. The data module associates a link number with a port address, extension number, and node name for the C-LAN port used for this connection. Begin Steps > Open Data Module form — enter...
Page 220
Configuration 5B:R8csi R8r (2 C-LANs) R8si 3 C-LAN Administration Administration for Network Connectivity CID: 77730 555-233-504 — Issue 1 — April 2000 200 Switch 3 Task — Assign Processor Channels This task associates data links (hardware) with processor channels (software) on Switch 3. Begin Steps > Open the Processor Channel Assignment form — enter ch com p > Enter values change communications-interface processor-channels Page 1...