Home
>
Land Rover
>
Automobile
>
Land Rover Range Rover Workshop Pre Delivery Inspection Pdi Lm 3rd Edition Rover Manual
Land Rover Range Rover Workshop Pre Delivery Inspection Pdi Lm 3rd Edition Rover Manual
Here you can view all the pages of manual Land Rover Range Rover Workshop Pre Delivery Inspection Pdi Lm 3rd Edition Rover Manual. The Land Rover manuals for Automobile are available online for free. You can easily download all the documents as PDF.
Page 2
WORKSHOP MANUAL - PRE-DELIVERY INSPECTION (PDI) LRL0516ENG 3rd Edition © 2002 Land Rover All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form, electronic, mechanical, recording or other means without written prior permission from Land Rover.
Page 4
CONTENTS CONTENTS 1 PRE-DELIVERY INSPECTION ................................................................. 01-1 PROCEDURES Pre-delivery inspection (PDI) .......................................................................................................... 01-1
Page 6
PRE-DELIVERY INSPECTION PROCEDURES 01-1 PRE-DELIVERY INSPE CTION PROCEDURES Pre-delivery inspection (PDI) $% 10.10.01 Preliminary 1.After parking vehicle in work bay, remove keys from ignition switch. 2.Check the integrity of factory fitted door and tailgate closure seals. Should a seal be broken or missing, ensure the tool kit and spare wheel are present. Also check that no internal damage to trim has occurred. 3.Remove door and tailgate closure seals. 4.Open bonnet for access.5.Loosen nut and...
Page 7
PRE-DELIVERY INSPECTION 01-2 PROCEDURES 8.Check security of battery carrier clamps and positive battery terminal. Using a volt meter, ensure battery voltage exceeds 12.65 volts before connecting Testbook/T4. If voltage is below this figure recharge battery. NOTE: The voltage check must be carried out before connecting Testbook/T4. Failure to do this may result in vehicle configuration failure. 9.If BBUS multiplug is disconnected, remove nut securing sounder to support bracket. 10.Connect...
Page 8
PRE-DELIVERY INSPECTION PROCEDURES 01-3 14.Connect earth lead to negative battery terminal and tighten bolt to 10 Nm (7 lbf.ft). 15.Start engine, turn the steering fully from lock to lock and back to the straight ahead position. This action is required to extinguish the Steering Angle Sensor (SAS) and Dynamic Stability Control (DSC) warning lamps. Stop the engine.16.Release cover from drivers side vehicle diagnostic socket and connect the Testbook/T4 lead (DTC 0065A). Connect lead to Testbook/ T4...
Page 9
PRE-DELIVERY INSPECTION 01-4 PROCEDURES 19. Telephone handset registration: The following describes the process for registering a new phone to a vehicle. Again, it should be remembered that only one phone can be registered to a vehicle and that any other phone should be de-registered prior to trying to register a new phone. 20.Replacement handsets will be supplied from the manufacturer in German. Language changes can only be made once the phone is registered to the vehicle, therefore the...
Page 10
PRE-DELIVERY INSPECTION PROCEDURES 01-5 Vehicle Interior 1. Models fitted with Hi Line Multi Function Display (MFD) only: Set time, date and radio audio settings, including presets. 2.Turn key in ignition switch to position 1. 3.Switch on the MFD. 4.Depress the menu button, using the right rotary control select clock and set time by depressing the right rotary control, follow the on screen icons. Enter correct time in either 12 or 24 hour mode. Press menu to exit clock mode.5.Set 6 FM and 6 AM...