Land Rover Lt230t Transfer Box Overhaul 3rd Edition Rover Manual
Here you can view all the pages of manual Land Rover Lt230t Transfer Box Overhaul 3rd Edition Rover Manual. The Land Rover manuals for Automobile are available online for free. You can easily download all the documents as PDF.
Page 21
TRANSFER BOX 12 DESCRIPTION AND OPERATION DESCRIPTION Introduction The LT230T transfer box is mounted at the rear of the main gearbox and transmits drive to the front and rear axles via the propeller shafts. Construction The transfer box comprises three main assemblies, the main casing, front output housing and rear output housing. The main casing carries the mainshaft input gear, the intermediate gears and the differential together with the high/low range gears, selector shaft and fork. The front output...
Page 22
TRANSFER BOX DESCRIPTION AND OPERATION13 Front output housing assembly The front output shaft is supported in the front output housing by a single bearing and is splined into the differential front shaft. The high/low cross shaft is located in a housing bolted to the top of the output housing and is connected to the high/low selector finger which locates in a slot in the selector shaft. The differential lock selector housing is also bolted to the top of the front output housing, the selector finger...
Page 26
TRANSFER BOX OVERHAUL1 TRANSFER BOX DISMANTLING 1.Clean exterior of transfer box. 2.Drain and discard the oil, refit drain plug. 3.Loosen bolt to release transmission brake adjustment. 4.Remove countersunk screw securing transmission brake drum, remove drum. NOTE: 2 screws may be fitted. 5.Make suitable alignment marks between transmission brake backplate and rear output housing. 6.Remove 4 bolts securing transmission brake backplate, remove backplate. 7.Remove Allen screw securing vehicle speed sensor -...
Page 27
TRANSFER BOX 2 OVERHAUL 11.Release staking from intermediate shaft nut, remove and discard nut. 12.Remove bolt securing anti-rotation plate, remove plate. 13.Using a soft metal drift on threaded end of intermediate shaft, drive shaft out of main casing. 14.Remove and discard’O’ring from intermediate shaft. 15.Remove and discard’O’ring from main casing. 16.Wrap a suitable length of wire around intermediate gears and using assistance, lift gears out of main casing. NOTE: Collapsible spacer illustrated....
Page 28
TRANSFER BOX OVERHAUL3 NOTE: Discovery cover plate illustrated. 19.Make suitable alignment marks between cover plate/power take-off cover, mainshaft input gear bearing housing and main casing. 20.Noting fitted position of stud nut and harness/speedometer cable clip, remove 5 bolts and stud nut securing cover plate/ power take-off cover, recover clip. 21.Remove cover plate/power take-off cover. 22.Up to serial no. 288709E:Remove and discard gasket. 23.Remove oil feed plate - if fitted, remove and...
Page 29
TRANSFER BOX 4 OVERHAUL 27.Remove mainshaft input gear together with taper roller bearings. NOTE: Input gear fitted to Defender transfer boxes has an additional dog tooth gear - see inset on illustration. 28.Remove and discard mainshaft oil seal from main casing. CAUTION: Do not remove mainshaft input gear bearing track at this stage. NOTE: Low detect switch fitted to early boxes illustrated. 29.Remove 6 bolts securing high/low cross shaft housing. 30.Remove cross shaft housing. 31.Up to serial no....
Page 30
TRANSFER BOX OVERHAUL5 32.Loosen locknut and remove differential lock warning lamp switch from front output housing. NOTE: On later boxes, locknut is replaced by a spacer. 33.Noting fitted position of longest bolt, remove 8 bolts securing front output housing to main casing. 34.Remove front output housing. NOTE: Dowel located.35.Up to serial no. 288709E:Remove and discard gasket. CAUTION: Do not carry out further dismantling of front output housing at this stage. 36.Noting their fitted position, remove...