Home > Land Rover > Automobile > Land Rover Lt230t Transfer Box Overhaul 2nd Edition Rover Manual

Land Rover Lt230t Transfer Box Overhaul 2nd Edition Rover Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Land Rover Lt230t Transfer Box Overhaul 2nd Edition Rover Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 364 Land Rover manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							TRANSFERBOX
    34 OVERHAUL
    Rear
    output housing
    1. Heat rearoutput housing to100 °C (210 °F).
    2. Fitnew output shaftbearing usingtool
    LRT-41-011.
    3. Allow housing toair cool.
    4. Fitnew bearing retaining circlipensuring itis
    seated ingroove. 5.
    Lubricate anew output shaftoilseal with
    recommended oil.
    6.Fitoilseal using toolLRT-41-012.
    NOTE: Useendoftool marked REARto
    fit oil seal.
    7.Check thatoilseal isjust contacting circlip.
    8.Slide speedometer drivegearandspacer onto
    output shaft.    
    						
    							TRANSFERBOX
    OVERHAUL 35
    9.Position rearoutput housing onbed ofhand
    press.
    10. Locate threaded endofoutput shaftinbearing.
    11. Position thrustbutton LRT-37-11/2 between
    end ofoutput shaftandpress mandrel.
    12. Press output shaftintobearing.
    13. Fitmud shield withopen faceofshield towards
    oil seal.
    CAUTION: Donot fitoutput shaftflange at
    this stage.    
    						
    							TRANSFERBOX
    36 OVERHAUL
    14.Fitspeedometer drivengearintorear output
    housing ensuring thatgear teeth areengaged
    with drive gear.
    15. Lubricate anew Oring with recommended oil
    and fitto driven gearhousing.
    16. Fitdriven gearhousing.
    17. Lubricate anew oilseal withrecommended oil,
    fit seal withliptowards drivengearhousing. Front
    output housing
    CAUTION: Donot carry outassembly
    operations untildifferential bearing
    pre-load hasbeen established
    -See
    Differential bearingpre-load.
    1.Heat frontoutput housing to100 °C (210 °F).
    2. Fitnew output shaftbearing usingtool
    LRT-41-011.
    3. Allow housing toair cool.
    4. Fitnew bearing retaining circlipensuring itis
    fully seated ingroove.   
    						
    							TRANSFERBOX
    OVERHAUL 37
    5.
    Lubricate anew output shaftoilseal with
    recommended oil.
    6.Fitoilseal using toolLRT-41-012.
    NOTE: Useendoftool marked FRONT to
    fit oil seal.
    7.Check thatoilseal isjust contacting circlip.
    8. Position selected shiminfront output housing.
    9.Fitdifferential frontbearing trackusing tool
    LRT-54-003.
    10. Fitbearing spacertooutput shaftensuring that
    chamfer onspacer istowards threaded endof
    shaft.
    11. Fitdog clutch ensuring thatflange onclutch is
    towards splinedendofshaft.
    12. Using amallet, driveoutput shaftintobearing.     
    						
    							TRANSFERBOX
    38 OVERHAUL
    High/low
    crossshafthousing
    1. Lubricate crossshaftandnew Oring with
    recommended oil.
    2.Insert crossshaftintohousing, position
    high/low selectorfingeronshaft.
    3. FitO ring toshaft, locate endofshaft in
    hollow plug.
    4. Slide Oring toend ofshaft.
    5. Align holeinhigh/low selectorfingerwith
    recess incross shaft.
    6. Apply Loctite 290tothreads ofsetscrew, fit
    and tighten screw.
    7. Apply Hylomar PL32sealant tothreads of
    neutral warning lampswitch -Range Rover
    Classic only-if fitted. Fitswitch, donot tighten
    locknut untilswitch hasbeen adjusted.
    NOTE: Switch mustbeadjusted after
    transfer boxisinstalled invehicle.
    Differential lockselector
    1.Lubricate newOrings withrecommended oil,
    fit to selector fingershaftandhousing.
    2. Insert selector fingershaftintohousing.
    3. Fitselector leverensuring thatrelative
    positions oflever andfinger areasshown.
    4. Fitwasher andnew self-locking nut,tighten nut
    to 15 Nm (11lbf.ft).   
    						
    							TRANSFERBOX
    OVERHAUL 39
    TRANSFER
    BOXASSEMBLING
    1. Lubricate allcomponents withrecommended
    oil.
    CAUTION: Whereuseofgaskets is
    specified, gasketsmustbefitted; donot
    use sealant.
    Mainshaft inputgearbearing pre-load
    1.Position mainshaft inputgearassembly inmain
    casing.
    2.
    Up toserial no.288709E:Fitanew mainshaft
    input gearbearing housing gasket,dryonmain
    casing.
    3.
    All transfer boxes:Fitmainshaft inputgear
    bearing housing ensuring reference marksare
    aligned.
    4. Fit2M10 x25 m m bolts andtighten to25 Nm
    (18 lbf.ft).
    5. Position suitableDTIwith stylus ofgauge
    contacting endofmainshaft, pushmainshaft
    rearwards andzero gauge.
    6. Push mainshaft forwardsandnote gauge
    reading. 7.
    Calculate thickness ofshim required usingthe
    formula A+B +C =D where:
    A =Thickness ofinstalled shim-3.15 mm
    (0.12 in)
    B =Recorded end-float
    C =Required pre-load-0.05 mm(0.002 in)
    D =Thickness ofshim required
    8. Ifan alternative shimisrequired toestablish
    correct end-float, proceedasfollows:
    NOTE: Donot remove mainshaft input
    gear bearing housing ifbearing pre-load is
    correct.
    9. Remove 2bolts, remove mainshaft inputgear
    bearing housing.
    NOTE:Uptoserial no.288709E, retain
    gasket onmain casing.
    10.Using asoft metal drift,carefully driveinput
    gear bearing trackoutofbearing housing,
    remove shim.
    CAUTION: Ifbearing trackisdamaged
    during thisoperation, anew track mustbe
    fitted.
    11. Select required shimfromtherange available.
    NOTE: Shimsareavailable from3.15to
    4.00 mm(0.12 to0.16 in)thickness rising
    in increments of0.05 mm(0.002 in).
    12.Fitselected shimandusing asuitable mandrel,
    fit input gearbearing track.
    13. Fitmainshaft inputgearbearing housing and
    temporarily secureusing2M10 x25 m m bolts
    tightened to25 Nm (18lbf.ft).   
    						
    							TRANSFERBOX
    40 OVERHAUL
    Rear
    output housing
    1.
    Up toserial no.288709E:Position anew
    gasket, dryonmain casing.
    2.
    From serial no.288709E:Apply Hylosil RTV
    102 sealant tomating flangeofrear output
    housing.
    3. Fitrear output housing tomain casing.
    NOTE: Dowellocated.
    4.Apply Loctite 290tothreads ofbolts and
    shoulder bolt.
    5. Fitwashers to2bolts.
    6. Fitbolts andtighten bydiagonal selection to25
    Nm (18lbf.ft).
    7. Fitoutput flange, newfeltand steel washers to
    output shaft.
    8. Fitanew self-locking nut.
    9.Position propeller shaftflange holding tool
    LRT-51-003 tooutput flange.
    10. Restrain flange,tightennutto162 Nm(120
    lbf.ft).
    11. Lubricate anew Oring with recommended oil
    and fitto vehicle speedsensor -if fitted.
    12. Fitvehicle speedsensor -if fitted.
    13. Fitand tighten Allenscrew.    
    						
    							TRANSFERBOX
    OVERHAUL 41
    Differential
    bearingpre-load
    1.Position high/low selectorshaftandforkto
    differential ensuringthatfingers ofselector fork
    are located inhigh/low selectorsleeve.
    2. Position high/low selectorshaftanddifferential
    in main casing ensuring thatsplines ofrear
    output shaftareengaged indifferential.
    3. Position newdifferential frontbearing outer
    track onbearing ensuring thattrack isseated
    squarely.
    4. Position settingblock,toolLRT-41-014/3 on
    main casing.
    5. Screw pillarLRT-41-014/4 intotapped holein
    main casing.
    6. Assemble DTILRT-99-006 topillar.
    7. Position stylusofDTI tosetting block,zero
    gauge.
    8. Position stylusofgauge onfront bearing outer
    track, record reading obtained.
    9. Position stylusofgauge onopposite sideof
    bearing track,record reading obtained.
    CAUTION: Ensurethatbearing outertrack
    is not disturbed whencarrying outabove
    operations.
    10. Establish averageofthe 2readings, record
    figure obtained.     
    						
    							TRANSFERBOX
    42 OVERHAUL
    11.Position frontoutput housing asshown.
    12.
    Up toserial no.288709E:Position anew
    gasket, dry,onfront output housing.
    13. Position depthblock, toolLRT-41-014/2 and
    cross-bar, toolLRT-41-014/1 onfront output
    housing.
    14. Position DTILRT-99-006 oncross-bar
    LRT-41-014/1 .
    15. Zero DTIondepth blockLRT-41-014/2.
    16. Position DTItocross-bar LRT-41-014/1, record
    reading obtained.
    17. Remove tools.
    18.
    Up toserial no.288709E:Remove andretain
    gasket.
    19. Using theformula:
    3.05 mm(0.120 in)+B -A =D where:
    B =Height difference recordedbetweendepth
    block andcross bar
    A =Average ofreadings todifferential front
    bearing outertrack
    D =Thickness ofshim required togive
    differential bearingpre-load of0.05 mm(0.002
    in)
    20. From resultant figureobtained, select
    appropriate thicknessshimfromtherange
    available.
    NOTE: Shimsareavailable from2.00to
    3.25 mm(0.08 to0.13 in)thickness rising
    in increments of0.05 mm(0.002 in).
    21.Retain selected shimanddifferential front
    bearing outertrackwithfront output housing.
    22.
    Up toserial no.288709E:Retain gasket with
    front output housing.
    23. Carry outassembly offront output housing
    -
    See Component assembling.  
    						
    							TRANSFERBOX
    OVERHAUL 43
    Front
    output housing
    1.Uptoserial no.288709E:Fitgasket used
    when determining differentialbearingpre-load,
    dry, tomain casing.
    2.
    From serial no.288709E:Apply Hylomar RTV
    102 sealant tomating flangeoffront output
    housing.
    All transfer boxes
    3.Fitfront output housing ensuring thatsplines of
    output shaftareengaged indifferential andthat
    internal splinesofdog clutch areengaged with
    teeth ofoutput shaft.
    4. Apply Loctite 290tothreads ofbolts, fitbolts
    noting thatlongest boltisinserted through
    high/low selectorfingerhousing.
    5. Tighten boltsbydiagonal selection to25 Nm
    (18 lbf.ft).
    6. Fitoutput flange, newfeltand steel washers.
    7. Fitanew self-locking nut.
    8.Position propeller shaftflange holding tool
    LRT-51-003 tooutput flange.
    9. Restrain flange,tightennutto162 Nm(120
    lbf.ft).    
    						
    All Land Rover manuals Comments (0)

    Related Manuals for Land Rover Lt230t Transfer Box Overhaul 2nd Edition Rover Manual