Home > Land Rover > Automobile > Land Rover Lt230q Overhaul Rover Manual

Land Rover Lt230q Overhaul Rover Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Land Rover Lt230q Overhaul Rover Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 364 Land Rover manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							TRANSFERBOX
    24 OVERHAUL
    Differential
    1. Check sunand planet gearsforwear, cracks
    and chipping ofteeth.
    2. Check crossshafts andrecesses inboth
    halves ofdifferential carrierfordamage and
    wear.
    CAUTION: Ensureplanetgearsare
    retained withtheir respective shafts.
    3.Check retaining ringfordistortion.
    4. Check splines ofdifferential forwear and
    damage.
    5. Check teethofhigh/low hubforcracks,
    chipping anduneven wear.
    6.Check selector forkgroove widthinhigh/low
    hub: Groove width=7.5 to7.6 mm (0.295 to0.3 in)
    7. Check splines andteeth ofhigh/low selector
    sleeve foruneven wear,cracks, damage and
    chipping.
    8. Check teethofhigh andlowrange gearsfor
    cracks, chipping anduneven wear.
    9. Check highrange gearbush forwear and
    damage.  
    						
    							TRANSFERBOX
    OVERHAUL 25
    COMPONENT
    ASSEMBLING
    1. Lubricate allcomponents withrecommended
    oil.
    Differential 1. Lightly oilthreads ofdifferential bolts.
    2.Secure rearhalfofdifferential carrierina
    soft-jawed vice.
    3. Fiteach planet geartoits respective
    cross-shaft, fitnew dished thrustwasher to
    each gear.
    4. Fitcross-shafts, planetgearsanddished thrust
    washers inrear halfcarrier.
    CAUTION: Ensurethatcross-shafts arein
    their correct fittedposition inrear half
    carrier. Donot fitsun gear intorear half
    carrier atthis stage.
    5.Fitretaining ring.
    6. Fita1.05 mm(0.04 in)thick thrust washer to
    front halfcarrier sungear, position gearinfront
    half carrier.
    NOTE: Thisisthe thinnest ofthe thrust
    washers available.
    7.Fitfront halfcarrier torear ensuring that
    alignment marksaretogether.
    8. Fitbolts andtighten bydiagonal selection to60
    Nm (44lbf.ft).
    9.Insert frontoutput shaftintofront halfcarrier,
    check thatgears rotate freely.
    10. Fitoutput flangeontosplines ofoutput shaft,
    do not fitflange nutatthis stage.
    11. Fittransmission brakedrumtooutput flange,
    secure drumusing 2nuts.
    12. Secure alength ofcord around brakedrum,
    attach oneendofcord toaspring balance.
    13. Tension cordandnote loadtoturn figure
    recorded onspring balance whenbrake drum
    rotates.
    NOTE: Usedgears should rotatesmoothly
    whilst newgears willhave anotchy feel
    as they rotate.    
    						
    							TRANSFERBOX
    26 OVERHAUL
    14.
    Check figureobtained againstspecified loadto
    turn figure:
    Used gears =0.45 kg(1.0 lb)
    New gears =1.72 kg(3.8 lb)
    15. Ifload toturn figure isbelow thatspecified,
    proceed asfollows.
    16. Remove frontoutput shafttogether withbrake
    drum.
    17. Remove 8bolts securing fronthalfdifferential
    carrier.
    18. Remove fronthalfdifferential carrier.
    19. Remove fronthalfcarrier sungear andthrust
    washer.
    20. Select athicker thrustwasher fromtherange
    available.
    NOTE: 5thicknesses ofthrust washers are
    available risinginincrements of0.10 mm
    (0.004 in)from 1.05to1.45 mm(0.04 to
    0.06 in).
    21.Position selected thrustwasher andsungear
    in front halfcarrier.
    22. Fitfront halfcarrier torear ensuring that
    alignment marksaretogether.
    23. Fitbolts andtighten bydiagonal selection to60
    Nm (44lbf.ft).
    24. Fitfront output shaftandbrake drumand
    repeat loadtoturn check.
    25. Repeat aboveprocedures asnecessary until
    load toturn figure isas specified; recordfinal
    figure obtained.
    26. Remove brakedrumfromfrontoutput shaft,
    remove outputshaft.
    27. Remove boltssecuring fronthalfcarrier.
    28. Remove fronthalfcarrier, remove sungear
    and thrust washer.
    CAUTION: Keepselected thrustwasher
    with sungear.
    29.Remove retaining ring.
    30. Remove planetgearsandcross shafts.
    31.Fita1.05 mm(0.04 in)thick thrust washer to
    rear halfcarrier sungear, position gearinrear
    half carrier.
    32. Fitplanet gears, crossshafts anddished thrust
    washers inrear halfcarrier.
    CAUTION: Ensurethatplanet gearsare
    fitted totheir respective cross-shafts and
    cross-shafts arefitted intheir correct
    location inhalf carrier.
    33.Fitretaining ring.
    34. Fitfront halfcarrier torear ensuring that
    alignment marksaretogether.
    CAUTION: Donot fitsun gear andthrust
    washer intofront halfcarrier.
    35.Fitbolts andtighten bydiagonal selection to60
    Nm (44lbf.ft).  
    						
    							TRANSFERBOX
    OVERHAUL 27
    36.Invert assembly invice andthen insert rear
    output shaftintorear halfcarrier, checkthat
    gears rotate freely.
    37. Fitoutput flangeontosplines ofoutput shaft,
    do not fitflange nutatthis stage.
    38. Fittransmission brakedrumtooutput flange,
    secure with2nuts.
    39. Carry outload toturn check usingsame
    method asfor front halfcarrier.
    40. When loadtoturn figure iscorrect, recordfinal
    figure.
    41. Upon completion, fitsun gear andselected
    thrust washer tofront halfcarrier.
    42. Fitfront halfcarrier ensuring thatalignment
    marks aretogether.
    43. Fitbolts andtighten bydiagonal selection to60
    Nm (44lbf.ft).
    44. With differential assembled, fitrear output shaft
    and brake drumandcheck overall loadtoturn.
    This should beapproximately equaltototal
    load toturn figure ofboth front andrear half
    carriers addedtogether:
    Used gears =0.90 kg(2.0 lb)
    New gears =3.44 kg(7.6 lb)
    45.Secure rearhalfcarrier inasoft-jawed vice.
    46. Fitanew front bearing usingtoolLRT-41-008.    
    						
    							TRANSFERBOX
    28 OVERHAUL
    47.Support fronthalfcarrier inasoft-jawed vice.
    48. Fitlow range gearensuring thatdog teeth on
    gear aretowards threaded endofshaft.
    NOTE: Useasuitable hollowmandrel tofit
    gear ifitis tight onsplines.
    49. Fithigh/low hubensuring thatalignment mark
    made during dismantling istowards threaded
    end ofshaft.
    50. Fithigh/low selectorsleeveensuring that
    alignment marksonhub andsleeve are
    together.
    51. Fitbush tohigh range gearensuring thatcollar
    on bush ison opposite sideofgear tothe dog
    teeth.
    52. Fithigh range gearandbush ensuring that
    collar onbush istowards threaded endof
    shaft.
    53. Fitanew rearbearing usingtoolLRT-41-008.
    54. Fitanew bearing retainer nut,tighten to72 Nm
    (53 lbf.ft) using toolLRT-41-007.
    CAUTION: Donot stake nutatthis stage.    
    						
    							TRANSFERBOX
    OVERHAUL 29
    55.Slide high/low selectorsleeveandhubaway
    from lowrange gear.
    56. Using feelergauges, determine clearance
    between lowrange gearandhigh/low hub:
    Clearance =0.05 to0.15 mm(0.002 to0.006
    in)
    57. Ifclearance isnot asspecified, fitanew low
    range gearandhigh/low hubandre-check.58. Slide high/low selectorsleeveandhubaway
    from highrange gear.
    59. Using feelergauges, determine clearance
    between highrange gearandhigh/low hub:
    Clearance =0.05 to0.15 mm(0.002 to0.006
    in)
    60. Ifclearance isnot asspecified, fitnew high
    range gearandhigh/low hubandre-check.    
    						
    							TRANSFERBOX
    30 OVERHAUL
    61.Using around nosed punch, stakecollarofnut
    into recess indifferential shaft. Main
    casing
    1.Fitanew differential rearbearing trackusing
    tool LRT-51-009.
    2. Using astraight edgeandfeeler gauges, check
    that bearing trackisrecessed 1.0mm (0.04 in)
    below outerfaceofmain casing.
    3.Using asuitable mandrel, fitanew mainshaft
    input gearbearing track.
    CAUTION: Ensurebearing tracksare
    seated squarely inrecesses.    
    						
    							TRANSFERBOX
    OVERHAUL 31
    4.
    Lubricate anew mainshaft oilseal with
    recommended oil.
    5.Invert maincasing andfitoil seal, lipside
    facing inwards, usingtoolLRT-37-014. Mainshaft
    inputgearbearing housing
    1. Ensure bearing trackrecess inhousing is
    clean.
    2. Position a3.15 mm(0.12 in)thick shim in
    bearing housing.
    NOTE:Thisisthe thinnest ofthe shims
    available.
    3. Using asuitable mandrel, fitnew mainshaft
    input gearbearing track.
    CAUTION: Ensurebearing trackisseated
    squarely inrecess.    
    						
    							TRANSFERBOX
    32 OVERHAUL
    Mainshaft
    inputgearassembly
    1. Lubricate newbearings withrecommended oil.
    2.Secure handpress LRT-99-002 inavice.
    3. Position collarsLRT-41-003 inhand press.
    4. Position newbearing oncollars.
    NOTE: Smallest diameter ofbearing must
    be towards collars.
    5.Locate endofmainshaft inbearing, press
    mainshaft throughbearing.
    6. Repeat aboveprocedure forremaining
    bearing. Intermediate
    gears.
    1. Lubricate newbearings andbearing trackswith
    recommended oil.
    2.Fitnew circlips intointermediate gears.
    CAUTION:Ensurethatcirclips are
    correctly seated.
    3.Fitnew bearing tracksusingtoolsLRT-41-006
    and LRT-99-003.
    CAUTION: Ensurebearing tracksarefully
    seated against circlips.
    4.Retain bearings withintermediate gears.   
    						
    							TRANSFERBOX
    OVERHAUL 33
    Rear
    output housing
    1. Heat rearoutput housing to100 °C (210 °F).
    2. Fitnew output shaftbearing usingtool
    LRT-41-011.
    3. Allow housing toair cool.
    4. Fitnew bearing retaining circlipensuring itis
    seated ingroove. 5.
    Lubricate anew output shaftoilseal with
    recommended oil.
    6.Fitoilseal using toolLRT-41-012.
    NOTE: Useendoftool marked REARto
    fit oil seal.
    7.Check thatoilseal isjust contacting circlip.    
    						
    All Land Rover manuals Comments (0)

    Related Manuals for Land Rover Lt230q Overhaul Rover Manual