Page 21
997-492-000-6, Issue 6 July 201114 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 5 Panel Electronics The Fire Control Panel is supplied with the following factory-fitted electronic equipment: •Main PCB •PSU PCB These PCBs do not need to be removed to install the back box. 5.1 Main PCB The Main PCB is pre-fitted in the panel and does not require removal for panel installation. Multi-mode pushbuttons and status indicators on the Main PCB are used for all panel...
Page 22
997-492-000-6, Issue 6July 2011 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 15 Refitting the Main PCB The procedure for refitting the Main PCB is the reverse of the removal procedure but note the following points: When offering the Main PCB to the three locating tabs (C) make sure that: i Make the ribbon cable connection at socket connectorSK4 (D) and re-connect the earth lead to the blade connector (A). ii The ribbon cable is correctly located within the...
Page 23
997-492-000-6, Issue 6 July 201116 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 6 Commissioning 6.1 Introduction It is recommended that the control panel is powered up and tested before connecting the field devices. 6.2 Preliminary Checks Before connecting the mains power to the panel, check: 1 The earth lead from the safety earth post is connected to the earth tag on the Main PCB. 2 That the EOL devices are correctly terminated in the zone input and sounder...
Page 24
997-492-000-6, Issue 6July 2011 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 17 6.4 Powering the Panel Before applying mains power to the control panel make sure that you carry out the following checks and procedures: 1 Check that you carried out all the instructions described in Section 6.2 Preliminary Checks . 2 Prepare the mains supply wiring for connection as follows: i Remove the outer cable sheath to provide sufficient slack, approximately 100mm, in the...
Page 25
997-492-000-6, Issue 6 July 201118 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 2Connect the batteries using the provided items: a. Red battery lead (1 off) b. Black battery lead (1 off) c. Short battery interlink lead (1 off). One end of each battery lead is fitted with a connector. The other end of the red and black battery leads should be connected to the battery charger termination block (TB8) located in the bottom, right- hand corner of the Main PCB. Note:...
Page 26
997-492-000-6, Issue 6July 2011 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 19 Recommended Battery Size The recommended battery sizes are given in the table below. The table is in two parts: the top part recommends battery sizes when 0.47μF capacitor EOL devices are used with 2, 4 or 8 zone panels and with 24hr or 72hr battery backup. The second part recommends battery sizes when 4k7 resistor EOL devices are used with 2, 4 or 8 zone panels and with 24hr or 72hr...
Page 27
997-492-000-6, Issue 6 July 201120 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 6.5 Configuration and Handover After all external wiring has been connected to the panel and with no faults existing, the panel can be configured for the particular system requirements. After configuration has been completed and after any faults revealed have been rectified, the system will be ready for commissioning tests. The configuration process is only possible with the panel at...
Page 28
997-492-000-6, Issue 6July 2011 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 21 470R (nominal)470R (nominal)470R (nominal)470R (nominal) ++ - - MCP MCP Main PCB Zone Input TerminationsMainPCBZone Input TerminationsRefer to Section 6.4.1 for details on standby battery sizes and maximum number of zones. Note: This method is not recommended for new installations.RefertoSection6.4.1fordetailsonstandbybatterysizes andmaximumnumberofzones. Capacitor: Use...
Page 29
997-492-000-6, Issue 6 July 201122 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 6.8 Sounder Circuits Two sounder output circuits are provided. The termination block, TB1, for the sounder circuits is located at the top left-hand corner of the PSU PCB. DO NOT CONNECT UNTIL ALL ZONES HAVE BEEN CONFIGURED AND TESTED. Before the sounder circuits are connected it is recommended that all detection circuits are checked to prevent the possibility of spurious alarm...
Page 30
997-492-000-6, Issue 6July 2011 EN 54 & ISO 7240 2-8 Zone Conventional Fire Panel - Installation & Configuration Manual 23 6.9 Digital Inputs Two digital input circuits are provided. Terminal block, TB5, is provided on the Main PCB for these input circuits. Each circuit is configurable, at access Level 3, as a dedicated input function - refer to Section 7.7 Digital Inputs for details.