Haier Yl H24 Manual
Here you can view all the pages of manual Haier Yl H24 Manual. The Haier manuals for Controller are available online for free. You can easily download all the documents as PDF.
Page 51
Appearance, Dimension and Interface 1------------ Reset Port 2------------ Signal Ground Wire of Unit B 3------------ Signal Line of Unit B 4------------ Signal Ground Wire of Unit A 5------------ Signal Line of Unit A 6------------ Central Control Interface — B 7------------ Central Control Interface — A 8------------ Communication Line for RS-232 Linking Control Computer or Communication Line of MODEM (We only offer agreement of deteetor for...
Page 52
Installation and Debugging Installation Methods Fix detector by means of two screw s hanging methods, and distance between screws see (right figure). 1. Realization, installatio n, wiring and power distribution of a system only using two-unit swit chover function are much more easier, after finishing installation of two units, connect detector to the remote control interface of the air conditioner computer board, set detector as two-unit switchover...
Page 53
Installation and Debugging (13) in principle, installation place of central controller shall be arranged in the middle of communication bus, close to shielding earth line of communication bus; (14) unit address codes of central controller adopt the defaul t settings; (15) central controller has its own power distribution line, the power distribution line and communicati on line shall not be too close from each other or in the same wiring channel,...
Page 54
Installation and Debugging Tw o Unit Dialing setting Ä 1 means dialing to ON È0 means dialing to OFF Å NO.8 NO.7 NO.6 NO.5 NO.4 NO.3 NO.2 NO.1 Low 7-bit value Air conditioner installation sequence Unit number of central controller Two-unit switchover time * 0 0 0 0 0 0 0 0 1 1-1 No limit * 0 0 0 0 0 0 1 1 2 1-2 1hr * 0 0 0 0 0 1 0 2 3 1-3 2hrs * 0 0 0 0 0 1 1 3 4 1-4 3hrs * 0 0 0 0 1 0 0 4 5 1-5 4hrs * 0 0 0 0 1 0...
Page 55
Installation and Debugging Tw o Unit Dialing setting Ä 1 means dialing to ON È0 means dialing to OFF Å NO.8 NO.7 NO.6 NO.5 NO.4 NO.3 NO.2 NO.1 Low 7-bit value Air conditioner installation sequence Unit number of central controller Two-unit switchover time * 0 1 1 1 1 0 0 60 61 4-13 60hrs * 0 1 1 1 1 0 1 61 62 4-14 61hrs * 0 1 1 1 1 1 0 62 63 4-15 62hrs * 0 1 1 1 1 1 1 63 64 4-16 63hrs * 1 0 0 0 0 0 0 64 65 5-1 64hrs *...
Page 56
Installation and Debugging Tw o Unit Dialing setting Ä 1 means dialing to ON È0 means dialing to OFF Å NO.8 NO.7 NO.8 NO.7 NO.8 NO.7 NO.8 NO.7 Low 7-bit value Air conditioner installation sequence Unit number of central controller Two-unit switchover time * 1 1 0 1 0 0 0 104 105 7-9 104hrs * 1 1 0 1 0 0 1 105 106 7-10 105hrs * 1 1 0 1 0 1 0 106 107 7-11 106hrs * 1 1 0 1 0 1 1 107 108 7-12 107hrs * 1 1 0 1 1 0 0 108 109 7-13...
Page 57
12 Connecting board IGU04 0010451976 IGU04 detector is used with ICR01 central controller, IGU04 appearanc e and dimension is same with detector YCJ-A001 12.1 Appearance Caution: One central cont roller can control Up to 5 units of IGU04 CN1 J4 From central controller To indoor units S1 LED2 LED3 LED1 B-A QP B-BFrom central controller To outdoor unitsIGU04 To 220V,50Hz 12.2 PCB photo and drawing 2. Dip switch setting of connecting board ICR01 The dip switch is as below figure (ON:1, OFF: 0): O N...
Page 58
Commercial Air Conditioner S1(3-8) is used to set IGU04 address, in one central control system, the address of IGU04 must be different. 12.3.Summarization For installation information ,please refer central controller ICR01 manual , one ICR01 can control up to 5 sets of IGU04. - 58 -
All Haier manuals