Home > Haier > Controller > Haier Yl H24 Manual

Haier Yl H24 Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Haier Yl H24 Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 68 Haier manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							
    Appearance, Dimension and Interface                                       
    1------------ Reset Port 
    2------------  Signal Ground Wire of Unit B 
    3------------  Signal Line of Unit B 
    4------------  Signal Ground Wire of Unit A 
    5------------  Signal Line of Unit A 
    6------------  Central Control Interface — B 
    7------------  Central Control Interface — A 
    8------------  Communication Line for RS-232 Linking Control Computer or Communication Line of MODEM (We only offer agreement of deteetor for programming control software ) 
    9------------  Power Cord. If damaged, to avoid dangers, the power cord must be replaced by  manufacturer or its maintenance department or similar professional staff. 
    Performance Parameters and Accessories                                  
    Power Supply  1PH, 220~230VAC, 50Hz 
    Consumed Power  3W
    The Maximum Dimension  139 × 142 × 55 mm 
    Weight   0.53 kg 
    Accessories 2 pieces of communication line to air conditioner   
    (UL2547, AWG24 2C) (Core: red/white) 
    \b	
     \b \f
    \b\b\f
    -
    51 - 
    						
    							
    Installation and Debugging                                               
    Installation Methods Fix detector by means of two screw s hanging methods, and distance 
    between screws see (right figure).
    1. Realization, installatio n, wiring and power distribution of a system only 
    using two-unit swit chover function are much  more easier, after finishing 
    installation of two units,  connect detector to the remote control interface 
    of the air conditioner computer board,  set detector as two-unit switchover 
    working mode and set two-unit switchover time as required. 
    2.  It must form a complete set of documents (project la yout for group control network, installation and 
    construction records for group control  network, debugging records for group control net, maintenance 
    and repair records for group control network) for  group control network of Haier commercial air 
    conditioner long distan ce system (hereinafter for short as: group c ontrol network) from layout design, 
    installation, debugging to after service, and file all for future refere\
    nce. 
    3.  Layout design of group  control net woek shall be finished in advance, including: (1) compositions of 
    group control network system and qu antities controlled; (2) selection type of air conditioner, 
    installation place, power distribution and wiring manner and  connection to detector; (3) installation 
    place of detector, allocation of unit address  code, power distribution and wiring manner and 
    connection to group control bus; (4) in stallation and wiring of group control bus, length limitation of 
    bus, resistance matching of two en ds of bus, and single point earth of bus shielding layer; (5) 
    installation place of central  controller, allocation of unit address  code, power distribution and wiring 
    manner. 
    4.  Principles of layout design of group control net : (1) detector is essential part, to keep proper 
    responding speed and co mmunication reliability, d etector quantities carried by  one central controller 
    shall not more than 64; (2) air conditioner must  be a net air conditioner, installation must strictly 
    follow the installation and operat ion instructions shipped with the unit, and confirm that power 
    blackout compensation fun ction of local air conditioner has bee n cancelled when debugging; (3) 
    suggest that do not use two-unit switchover function of detector in the case of high load, i.e. suggest 
    that do not use one detector to load two air  conditioners when detector forming group control net, 
    otherwise temperature difference control may be affected. If it is necessary to install two-unit 
    switchover function for group cont rol net, air conditioners with same type and half installation 
    distance of that of normal installation are required; (4) installation place of detector shall not too far 
    away from air conditioner, not ex ceed the wiring length; (5) unit address code of detector shall be 
    strictly allocated in a seq uence from small one to big one,  and set continuous unit number; (6) for 
    power distribution of detector, the power distributi on line and communication line shall not be too 
    close from each other or in the same wiring chan nel, and no other special requirements; (7) for 
    connection between detector and  group control bus, not allowed to connect branch line from the 
    group control bus; (8) shie lding line of communication line betwee n detector and air conditioner and 
    the shielding line of commu nication bus between detector and central controller shall be shorted; (9) 
    wiring and power distribution line of the group control bus  shall not be too close from each other or 
    in the same wiring channel, and others may refer  to wiring requirements of building autocontrol 
    system;    (10) limit the total leng th of group control bus to 1000 meters; (11) at both ends between 
    Bus A and Bus B connect a metallic membrane precision  resistance of 100 or 120 ohm respectively; if 
    needed (12) single point earth for bus shielding l ine, suggest to be arranged in the middle of 
    communication bus, close to central controller;   
    \b	
     \b \f
    \b\b\f
    - 52 - 
    						
    							
    Installation and Debugging                                                 
    (13) in principle, installation place of central controller shall be  arranged in the middle of 
    communication bus, close to shielding earth  line of communication bus; (14) unit address codes of 
    central controller adopt the defaul t settings; (15) central controller has its own power distribution line, 
    the power distribution line and communicati on line shall not be too close from each other or in the 
    same wiring channel, and no other special requirements. 
    5.  Installation and construction of  wiring of group control network shall be processed together with 
    installation and debugging of net air conditioner, pay attention to commissioning before installation. 
    6.  Connection between detector  and air conditioner: detector working  mode and unit address code shall 
    be strictly set according to planned layout; detector  makes wire communication with at most two air 
    conditioners (A, B) through 4-poles screw-fixing terminal at air conditioner interface (A
    +,A-, B+, B-);
    connection between detect or and air conditioner use un iform wiring; use uniform wiring for 
    connection between detector and air conditioner,  one plug in type terminal of wiring connected to 
    Remote control interface on the  computer board of air conditioner, and cores of another terminal 
    respectively connected to A
    + and A- (B+ and B-); connection has polarity, and generally white wire 
    connected to A
    +/B+ and black/red wire connected to A-/B-; if detector cannot  work normally when 
    debugging, then can check and remove malfunctio n by changing positive and negative polarity. 
    During debugging also can judge wheth er communication interface to air conditioner is normal 
    according to the running status indicated by operation indicator (green\
     LED). 
    7.  Connect detector and communication bus after  finish the wiring of communication bus: connect 
    several detectors to communicati on bus in parallel, all terminal port A (including central controller) 
    on one bus, and all terminal port B (including centra l controller) on another bus, at both ends of the 
    communication bus - A terminal port line and B terminal port line shall paralleling connect a metal 
    membrane precision resistance of 100 or 120 ohm  respectively if needed. Earth one point of the 
    shielding line of communication bus, which is at th e middle position of the communication bus, and 
    the total length of communication bus shall be limited within 1000m. 
    8.  Connect central controller and communication bu s after finish installation and connection of detector: 
    central controller is connected  to communication bus through the  2-post screw-fixing terminal (A and 
    B) of interface RS-485, locating  in the middle of the communication bus, with position close to the 
    earth point of the shielding line of communication bus. 
    9.  Power on and debugging : after power on, central controller periodically monitors the detector and air 
    conditioner groups on the communication bus, a nd after inquiring for a period of time the unit 
    number shall display as expected, check and debug if having any difference. 
    10.  Set the dialing switch of detec tor: (1) there is a 8-bit (18) dialing switch inside the detector, OFF 
    means 0 and ON means 1; (2) the eighth bit used for s etting single unit working mode or two-unit 
    switchover working mode, OFF m eans single unit and ON means two-un it; (3) the lower seven bits 
    (from the seventh to the first bit) have up to 128 selections when forming group control net, which are 
    used for setting unit address code,  see the table below for detail setting check list; (4) the lower seven 
    bits have up to 128 selections when forming group  control net and using two-unit switchover function, 
    which are used for setting unit address code, see the ta ble below for detail setting check list, and the 
    default two-unit switchover time is 24 hrs; (5) the lower seven bits have up to 128 selections when not 
    forming group control net, wh ich are used for setting two-unit sw itchover time, see the table below 
    for detail setting check list. 
    \b	
     \b \f
    \b\b\f
    - 53 - 
    						
    							
    Installation and Debugging                                                                
    Tw o  
    Unit Dialing setting 
    Ä 1 means dialing to ON È0 means dialing to OFF Å
    NO.8 NO.7 NO.6 NO.5  NO.4 NO.3 NO.2 NO.1 Low
    7-bit
    value Air
    conditioner  installation sequence Unit
    number
    of central 
    controller Two-unit 
    switchover  time 
    * 0 0 0 0 0 0 0 0  1  1-1 No limit * 0 0 0 0 0 0 1 1  2  1-2  1hr * 0 0 0 0 0 1 0 2  3  1-3  2hrs * 0 0 0 0 0 1 1 3  4  1-4  3hrs * 0 0 0 0 1 0 0 4  5  1-5  4hrs 
    * 0 0 0 0 1 0 1 5  6  1-6  5hrs 
    * 0 0 0 0 1 1 0 6  7  1-7  6hrs * 0 0 0 0 1 1 1 7  8  1-8  7hrs * 0 0 0 1 0 0 0 8  9  1-9  8hrs * 0 0 0 1 0 0 1 9  10  1-10  9hrs * 0 0 0 1 0 1 0 10  11  1-11  10hrs * 0 0 0 1 0 1 1 11  12  1-12  11hrs * 0 0 0 1 1 0 0 12  13  1-13  12hrs * 0 0 0 1 1 0 1 13  14  1-14  13hrs * 0 0 0 1 1 1 0 14  15  1-15  14hrs * 0 0 0 1 1 1 1 15  16  1-16  15hrs * 0 0 1 0 0 0 0 16  17  2-1  16hrs * 0 0 1 0 0 0 1 17  18  2-2  17hrs * 0 0 1 0 0 1 0 18  19  2-3  18hrs * 0 0 1 0 0 1 1 19  20  2-4  19hrs * 0 0 1 0 1 0 0 20  21  2-5  20hrs * 0 0 1 0 1 0 1 21  22  2-6  21hrs * 0 0 1 0 1 1 0 22  23  2-7  22hrs * 0 0 1 0 1 1 1 23  24  2-8  23hrs * 0 0 1 1 0 0 0 24  25  2-9  24hrs * 0 0 1 1 0 0 1 25  26  2-10  25hrs * 0 0 1 1 0 1 0 26  27  2-11  26hrs * 0 0 1 1 0 1 1 27  28  2-12  27hrs * 0 0 1 1 1 0 0 28  29  2-13  28hrs * 0 0 1 1 1 0 1 29  30  2-14  29hrs * 0 0 1 1 1 1 0 30  31  2-15  30hrs * 0 0 1 1 1 1 1 31  32  2-16  31hrs * 0 1 0 0 0 0 0 32  33  3-1  32hrs * 0 1 0 0 0 0 1 33  34  3-2  33hrs * 0 1 0 0 0 1 0 34  35  3-3  34hrs * 0 1 0 0 0 1 1 35  36  3-4  35hrs * 0 1 0 0 1 0 0 36  37  3-5  36hrs * 0 1 0 0 1 0 1 37  38  3-6  37hrs 
    * 0 1 0 0 1 1 0 38  39  3-7  38hrs 
    * 0 1 0 0 1 1 1 39  40  3-8  39hrs 
    * 0 1 0 1 0 0 0 40  41  3-9  40hrs 
    * 0 1 0 1 0 0 1 41  42  3-10  41hrs 
    * 0 1 0 1 0 1 0 42  43  3-11  42hrs 
    * 0 1 0 1 0 1 1 43  44  3-12  43hrs 
    * 0 1 0 1 1 0 0 44  45  3-13  44hrs 
    * 0 1 0 1 1 0 1 45  46  3-14  45hrs 
    * 0 1 0 1 1 1 0 46  47  3-15  46hrs 
    * 0 1 0 1 1 1 1 47  48  3-16  47hrs 
    * 0 1 1 0 0 0 0 48  49  4-1  48hrs 
    * 0 1 1 0 0 0 1 49  50  4-2  49hrs 
    * 0 1 1 0 0 1 0 50  51  4-3  50hrs 
    * 0 1 1 0 0 1 1 51  52  4-4  51hrs 
    * 0 1 1 0 1 0 0 52  53  4-5  52hrs 
    * 0 1 1 0 1 0 1 53  54  4-6  53hrs 
    * 0 1 1 0 1 1 0 54  55  4-7  54hrs 
    * 0 1 1 0 1 1 1 55  56  4-8  55hrs 
    * 0 1 1 1 0 0 0 56  57  4-9  56hrs 
    * 0 1 1 1 0 0 1 57  58  4-10  57hrs 
    * 0 1 1 1 0 1 0 58  59  4-11  58hrs 
    * 0 1 1 1 0 1 1 59  60  4-12  59hrs 
    \b	
     \b \f
    \b\b\f
    -54 - 
    						
    							
    Installation and Debugging                                                  
    Tw o  
    Unit Dialing setting 
    Ä 1 means dialing to ON È0 means dialing to OFF Å
    NO.8 NO.7 NO.6 NO.5  NO.4 NO.3 NO.2 NO.1 Low
    7-bit
    value Air
    conditioner  installation sequence Unit
    number
    of central 
    controller Two-unit 
    switchover  time 
    * 0 1 1 1 1 0 0  60  61  4-13  60hrs 
    * 0 1 1 1 1 0 1  61  62  4-14  61hrs 
    * 0 1 1 1 1 1 0  62  63  4-15  62hrs 
    * 0 1 1 1 1 1 1  63  64  4-16  63hrs 
    * 1 0 0 0 0 0 0  64  65  5-1  64hrs 
    * 1 0 0 0 0 0 1  65  66  5-2  65hrs 
    * 1 0 0 0 0 1 0  66  67  5-3  66hrs 
    * 1 0 0 0 0 1 1  67  68  5-4  67hrs 
    * 1 0 0 0 1 0 0  68  69  5-5  68hrs 
    * 1 0 0 0 1 0 1  69  70  5-6  69hrs 
    * 1 0 0 0 1 1 0  70  71  5-7  70hrs 
    * 1 0 0 0 1 1 1  71  72  5-8  71hrs 
    * 1 0 0 1 0 0 0  72  73  5-9  72hrs 
    * 1 0 0 1 0 0 1  73  74  5-10  73hrs 
    * 1 0 0 1 0 1 0  74  75  5-11  74hrs 
    * 1 0 0 1 0 1 1  75  76  5-12  75hrs 
    * 1 0 0 1 1 0 0  76  77  5-13  76hrs 
    * 1 0 0 1 1 0 1  77  78  5-14  77hrs 
    * 1 0 0 1 1 1 0  78  79  5-15  78hrs 
    * 1 0 0 1 1 1 1  79  80  5-16  79hrs 
    * 1 0 1 0 0 0 0  80  81  6-1  80hrs 
    * 1 0 1 0 0 0 1  81  82  6-2  81hrs 
    * 1 0 1 0 0 1 0 82 83 6-3  82hrs
    * 1 0 1 0 0 1 1  83  84  6-4  83hrs 
    * 1 0 1 0 1 0 0  84  85  6-5  84hrs 
    * 1 0 1 0 1 0 1  85  86  6-6  85hrs 
    * 1 0 1 0 1 1 0  86  87  6-7  86hrs 
    * 1 0 1 0 1 1 1  87  88  6-8  87hrs 
    * 1 0 1 1 0 0 0  88  89  6-9  88hrs 
    * 1 0 1 1 0 0 1  89  90  6-10  89hrs 
    * 1 0 1 1 0 1 0  90  91  6-11  90hrs 
    * 1 0 1 1 0 1 1  91  92  6-12  91hrs 
    * 1 0 1 1 1 0 0  92  93  6-13  92hrs 
    * 1 0 1 1 1 0 1  93  94  6-14  93hrs 
    * 1 0 1 1 1 1 0  94  95  6-15  94hrs 
    * 1 0 1 1 1 1 1  95  96  6-16  95hrs 
    * 1 1 0 0 0 0 0  96  97  7-1  96hrs 
    * 1 1 0 0 0 0 1  97  98  7-2  97hrs 
    * 1 1 0 0 0 1 0  98  99  7-3  98hrs 
    * 1 1 0 0 0 1 1  99  100  7-4  99hrs 
    * 1 1 0 0 1 0 0 100  101  7-5  100hrs 
    * 1 1 0 0 1 0 1 101  102  7-6  101hrs 
    * 1 1 0 0 1 1 0 102  103  7-7  102hrs 
    * 1 1 0 0 1 1 1 103  104  7-8  103hrs 
    \b	
     \b \f
    \b\b\f\b	
     \b \f
    \b\b\f
    -55 - 
    						
    							
    Installation and Debugging                                                   
    Tw o  
    Unit Dialing setting 
    Ä 1 means dialing to ON È0 means dialing to OFF Å
    NO.8 NO.7 NO.8 NO.7  NO.8 NO.7 NO.8 NO.7 Low
    7-bit
    value Air
    conditioner  installation sequence Unit
    number
    of central 
    controller Two-unit 
    switchover  time 
    * 1 1 0 1 0 0 0 104  105  7-9  104hrs 
    * 1 1 0 1 0 0 1 105  106  7-10  105hrs 
    * 1 1 0 1 0 1 0 106  107  7-11  106hrs 
    * 1 1 0 1 0 1 1 107  108  7-12  107hrs 
    * 1 1 0 1 1 0 0 108  109  7-13  108hrs 
    * 1 1 0 1 1 0 1 109  110  7-14  109hrs 
    * 1 1 0 1 1 1 0 110  111  7-15  110hrs 
    * 1 1 0 1 1 1 1 111  112  7-16  111hrs 
    * 1 1 1 0 0 0 0 112  113  8-1  112hrs 
    * 1 1 1 0 0 0 1 113  114  8-2  113hrs 
    * 1 1 1 0 0 1 0 114  115  8-3  114hrs 
    * 1 1 1 0 0 1 1 115  116  8-4  115hrs 
    * 1 1 1 0 1 0 0 116  117  8-5  116hrs 
    * 1 1 1 0 1 0 1 117  118  8-6  117hrs 
    * 1 1 1 0 1 1 0 118  119  8-7  118hrs 
    * 1 1 1 0 1 1 1 119  120  8-8  119hrs 
    * 1 1 1 1 0 0 0 120  121  8-9  120hrs 
    * 1 1 1 1 0 0 1 121  122  8-10  121hrs 
    * 1 1 1 1 0 1 0 122  123  8-11  122hrs 
    * 1 1 1 1 0 1 1 123  124  8-12  123hrs 
    * 1 1 1 1 1 0 0 124  125  8-13  124hrs 
    * 1 1 1 1 1 0 1 125  126  8-14  125hrs 
    * 1 1 1 1 1 1 0 126  127  8-15  126hrs 
    * 1 1 1 1 1 1 1 127  128  8-16  127hrs 
    \b	
     \b \f
    \b\b\f
    -56 - 
    						
    							
    12 Connecting board IGU04 0010451976
    IGU04 detector is used with ICR01 central controller, IGU04 appearanc e and dimension is same with
    detector YCJ-A001
    12.1 Appearance
    Caution: One central cont roller can control Up to 5 units of IGU04
    CN1
    J4
    From central
    controller
    To indoor
    units
    S1
    LED2
    LED3 LED1
    B-A
    QP
    B-BFrom central
    controller
    To outdoor
    unitsIGU04
    To 220V,50Hz
    12.2  PCB photo and drawing
    2. Dip switch setting of connecting board ICR01
    The dip switch is as below  figure  (ON:1, OFF: 0):
    O N
    12345 678
    S1
    LED4
    \b	
     \b \f
    \b\b\f
    -57 -
    S\b	
    
    \f
     
     
     
     
     
     
    TT 
    	
    
    \b
     	SSS \f
    TT \f
    	
    
    \b
     	SSS 
    
    TT \f\f\f\f
    	
    
    \b
     	SSS 
    TT \f\f\f\f\f
    	
    
    \b
     	SSS 
    T 
    
    \b  
    S
    T \f
    
    \b  
    S
    \f
    
     \b  SS
    
    	\b	
     
    						
    							
    Commercial Air Conditioner
    S1(3-8) is used to set IGU04 address, in one central control system, the address of IGU04
    must be different.
    12.3.Summarization
    For installation information ,please refer central controller ICR01 manual , one ICR01 can
    control up to 5 sets of IGU04.
    - 58 - 
    						
    All Haier manuals Comments (0)