Epson 4880 C Service Manual
Here you can view all the pages of manual Epson 4880 C Service Manual. The Epson manuals for Printer are available online for free. You can easily download all the documents as PDF.
Page 311
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 311 13. Peel off the acetate tape binding the FFC to release the FFC. (Refer to Figure 4-146.) 14. Release the four Harness, CSICs and the I/H Lever Sensor (Left) harness from the two clamps and the acetate tape. (Refer to Figure 4-147.) Figure 4-146. Releasing Harnesses_5 Figure 4-147. Releasing Harnesses_6 Step 13 Acetate Tape Clamps Step 14 Acetate Tape
Page 312
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 312 15. Move Carriage Unit to center of printer. (Refer to 4.2.4.3 C593_SUB Board (p234).) 16. Remove the two screws securing rear side of I/H Right Unit. (Refer to Figure 4-148.) „C.B.S. 3x6: 2 pcs. 17. Remove the two screws securing the front side of I/H Right Unit. (Refer to Figure 4-149.) „C.B.S. 3x12: 2pcs. Figure 4-148. Screws Securing Rear Side of I/H Right Unit Figure 4-149. Screws Securing Front...
Page 313
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 313 18. Pull the I/H Right Unit forward from the printer following the order below while pulling the Harness, CSIC and I/H Lever Sensor (Right) harness from the hole in the frame. (Refer to Figure 4-150.) 18-1. To avoid interference of the printer frame hole and I/H Right Unit shaft, shift the I/H Right Unit to the left. 18-2. With the right side of the Paper Eject Unit lifted up, pull the I/H Right Unit...
Page 314
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 314 21. Remove the two screws securing Cover, Holder, IC, Right and remove Cover, Holder, IC, Right. (Refer to Figure 4-152.) „C.B.S. 3x6: 2 pcs. Figure 4-152. Cover, Holder, IC, Right Removal „When the Ink Lever is installed against the angle set location as shown in the illustration, confirm that the two holes of Fan Gear, 34 form a line parallel to the bottom of Frame, Holder, IC. „Align the two...
Page 315
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 315 22. Loosen the four Coupling Screw, M7 securing the four Tube, Supply, Inks and then disconnect Tube, Supply, Ink from I/H Right Unit. Figure 4-153. I/H Right Unit Removal When performing the following steps, be careful of the points below. „Ink may leak or splatter, so have cleaning rags ready and prevent ink from getting on the surrounding work area. „Prevent dust and dirt from getting inside...
Page 316
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 3164.2.8.6 Box Assy., Flushing / Pump Unit1.Remove Cover, Side, Right (p217). 2.Remove Motor Assy., PG (p274). 3. Move the Carriage Unit to center of printer. (Refer to 4.2.4.3 C593_SUB Board (p234).) 4. Remove the screw securing the Box Assy., Flushing. (Refer to Figure 4-154.) „C.B.S. 3x8: 1 pcs. 5. Slide the Box Assy., Flushing to the right and release the rib as shown in Figure 4-154 ( ), lift the...
Page 317
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 317 6. Remove the two screws securing the Shaft, Transmission, PG Unit and then remove the Shaft, Transmission, PG Unit by pulling it out of the hole in the frame. (Refer to Figure 4-155.) „C.B.S. 3x6: 2 pcs. Figure 4-155. Shaft, Transmission, PG Unit Removal Be careful not to scratch the Shaft, Transmission, PG Unit gear by bumping it against the frame.„Align Shaft, Transmission, PG Unit...
Page 318
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 318 7. While keeping the sheet turned aside, remove Extension Spring, 0.262 from the tabs of Mount Assy., Plate, Motor, ASF, SP and Lever, Lock, DE. (Refer to Figure 4-156.) 8. Pull the Lever, Lock, Planetary toward the outside of the printer, release the hook on top and then pull out of the Lever, Lock, DE. (Refer to Figure 4-157.)Figure 4-156. Extension Spring, 0.262 Removal Figure 4-157. Lever, Lock,...
Page 319
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 319 9. Remove the Lever, Lock, DE by following the steps below. (Refer to Figure 4-158.) 9-1. Slide it to the right. 9-2. Bend it toward the center. 9-3. Remove the left end from the installation hole. 9-4. Remove Lever, Lock, DE while extracting the flag at the right end from the hole in the frame. Figure 4-158. Lever, Lock, DE Removal Installation Hole Step 9-1 Step 9-3 Step 9-2 Flag Step 9-4
Page 320
EPSON Stylus Pro 4400/4450/4800/4880/4880CRevision CDisassembly & Assembly Disassembly Procedures 320 10. Disconnect the connector from the Pump Phase Sensor from behind the printer. (Refer to Figure 4-159.) 11. Free all the harnesses from the U-shaped notch of the Frame, Base, Side, Right. (Refer to Figure 4-159.) 12. Remove the four screws securing the Pump Unit. (Refer to Figure 4-160.) „C.B.S. 3x6: 3 pcs. „C.B.S. 3x8: 1 pc. 13. Shift the Pump Unit to the right side and disconnect the linkage with...