Cisco 6509 E Installation Manual
Here you can view all the pages of manual Cisco 6509 E Installation Manual. The Cisco manuals for Ethernet Switch are available online for free. You can easily download all the documents as PDF.
Page 191
2-121 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 2 Ethernet Switching Modules 40-Gigabit Ethernet Modules Module front panel LEDsSTATUS Indicates the status of the module. Green—All diagnostics pass; the module is operational. Orange—The module is booting or running diagnostics; an overtemperature condition has occurred. Red—A fault has been detected in the module. Off—The module is not powered up. ID Blinking blue—The module is being identified for attention. The...
Page 192
2-122 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 2 Ethernet Switching Modules 40-Gigabit Ethernet Modules For more information about the WS-X6904-40G Ethernet module, see these publications: 40 Gigabit Ethernet on Cisco Catalyst 6500 Series Switches: How It Works NoteSome features described in the whitepaper will be supported in future releases. Cisco Catalyst 6900 Series 40 Gigabit Ethernet Interface Module for Cisco Catalyst 6500 Series Switches Data Sheet Power...
Page 193
CH A P T E R 3-1 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 3 Installing Ethernet Switching Modules Revised: April 2012 This chapter describes how to safely install, remove, and verify the operation of the Ethernet switching modules in the Catalyst 6500 series switches, and it contains these sections: Safety, page 3-1 Installing an Ethernet Switching Module, page 3-2 Removing an Ethernet Switching Module, page 3-10 Installing Pluggable Transceivers, page 3-11 Attaching the...
Page 194
3-2 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 3 Installing Ethernet Switching Modules Installing an Ethernet Switching Module WarningDuring this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly touch the backplane with your hand or any metal tool, or you could shock yourself. Statement 93 WarningInvisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams or view directly with...
Page 195
3-3 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 3 Installing Ethernet Switching Modules Installing an Ethernet Switching Module Installing an Ethernet Switching Module CautionTo prevent ESD damage, handle modules by the carrier edges only. To install an Ethernet switching module in the chassis, follow these steps: Step 1Attach an ESD grounding strap to your wrist and to ground. NoteIf you are unsure about the correct way to attach an ESD grounding strap, see the...
Page 196
3-4 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 3 Installing Ethernet Switching Modules Installing an Ethernet Switching Module Step 10Depending on the orientation of the slots in the chassis (horizontal or vertical), perform one of the following two sets of steps: Chassis with horizontal slots a.Position the new module in the slot. (See Figure 3-1.) Make sure that you align the sides of the module carrier with the slot guides on each side of the chassis slot....
Page 197
3-5 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 3 Installing Ethernet Switching Modules Installing an Ethernet Switching Module c.Using the thumb and forefinger of each hand, grasp the two ejector levers and gently press down to create a small 0.040 inch (1 mm) gap between the module’s EMI gasket and the module or cover plate above it. (See Figure 3-2.) NoteDo not press down too forcefully on the levers because they will bend and get damaged. Figure 3-2 Clearing...
Page 198
3-6 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 3 Installing Ethernet Switching Modules Installing an Ethernet Switching Module f.Verify that the module STATUS LED is lit. g.Periodically check the STATUS LED: If the STATUS LED changes from orange to green, the module has successfully completed the boot process and is now online. If the STATUS LED remains orange or turns red, the module has not successfully completed the boot process and may have encountered an...
Page 199
3-7 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 3 Installing Ethernet Switching Modules Installing an Ethernet Switching Module Figure 3-4 Positioning the Module in a Vertical Slot Chassis INPUT OKFA N OKOUTPUT FAILo INPUT OKFA N OKOUTPUT FAILo FA N STATUS Ejector lever fully extended SUPERVISOR2 WS-X6K-SUP2-2GES T A T U SS Y S T E MC O N S O L EP W R M G M TR E S E TC O N S O L EC O N S O L E P O R T M O D E P C M C I AE J E C T P O R T 1 P O R T 2 S w i t...
Page 200
3-8 Catalyst 6500 Series Ethernet Modules Installation Guide OL-6265-04 Chapter 3 Installing Ethernet Switching Modules Installing an Ethernet Switching Module Figure 3-5 Clearing the EMI Gasket in a Vertical Slot Chassis c. Using the thumb and forefinger of each hand, grasp the two ejector levers and exert a slight pressure to the left, deflecting the module approximately 0.040 inches (1 mm) creating a small gap between the module’s EMI gasket and the module or cover plate adjacent to it. (See...