Home
>
Anetsberger Brothers
>
Fryer
>
Anetsberger Brothers 14Inch Gas Fryer SLG40 14 SilverLine User Manual
Anetsberger Brothers 14Inch Gas Fryer SLG40 14 SilverLine User Manual
Here you can view all the pages of manual Anetsberger Brothers 14Inch Gas Fryer SLG40 14 SilverLine User Manual. The Anetsberger Brothers manuals for Fryer are available online for free. You can easily download all the documents as PDF.
Page 1
1 L20-349 R3 Anets Inc. Mailing Address: P.O. Box 501, Concord,NH 03302-0501 USA Telephone: 603-225-6684 Shipping Address: 10 Ferry Street, Concord, NH 03301 USA www.anets.com FRYER Model SLG40 Installation, User Operation, & Maintenance Manual SLG40 shown on standard 6” legs ! Improper installation, adjustment, alteration, service, or maintenance can cause property damage, injury or death. Read the installation,...
Page 2
2 L20-349 R3 CONTENTS Shipping Container Inspection ....................................................... 3 Fryer Gas Supply Specifications .................................................... 3 Fryer Electrical Specifications ....................................................... 3 Figure 1 - Fryer Wiring Diagram ............................................ 3 Code Requirements ...................................................................... 4...
Page 3
3 L20-349 R3 SHIPPING CONTAINER INSPECTION 1.Carefully examine the shipping carton for external damage. When damage is noted, notify the delivery carrier immediately. Save all packing materials for damage claim examination. 2. If no external damage is noted, remove the shipping carton from the fryer and examine the fryer carefully for damage. Place the fryer in a safe location, if damage is noted, so that the freight damage claims adjuster can examine the fryer. 3....
Page 4
4 L20-349 R3 CODE REQUIREMENTS IMPORTANT: Read the Code Requirements and ALL installation instructions carefully, before starting the installation. Contact the fac- tory (1-603-225-6684) if any problems or questions arise. The fryer installation must conform with local codes, or in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1 (latest edition); the Natural Gas Installation Code, CAN/CGA-B149.1 (latest edition); or the Propane Gas...
Page 5
5 L20-349 R3 INSTALLATION Install the fryer in accordance with the preceding Code Requirements, as well as the following Installation Requirements. 1. DO NOT install this fryer in a mobile home, trailer, or recreational vehicle. 2. Install this fryer in a location that allows it to be moved away from other adjacent appliances for cleaning and maintenance. NOTE: If the fryer is installed among a row of appliances (“banked”), with its only convenient movement...
Page 6
6 L20-349 R3 LEG INSTALLATION INSTRUCTIONS 1. Position the fryer on its side on a clean surface. 2. Attach each leg with four bolts, washers and nuts (provided). 3. Tighten securely LEG LEVELING INSTRUCTIONS 1. Move the fryer to its desired location. 2. Turn the screw-type leg adjustment ends as necessary to level the fryer, until NO tipping, rocking, or wobbling is evident. 3. P e r f o r m t h e “Fryer Restraining Device Installation Instructions.”...
Page 7
7 L20-349 R3 GAS CONNECTION INSTRUCTIONS Installing your ANETS Fryer requires the fol- lowing procedure, after its legs or casters are pro- perly attached and it is in its desired location. 1. Ensure that the gas safety valve control knob in the fryer has its OFF position next to the valvemark. 2. Ensure that the gas supply inlet line valve is closed (crosswise to the line direction). 3. Ensure that the fryer’s thermostat is set to OFF. 4. Connect the ½” gas...
Page 8
8 L20-349 R3 FRYER OPERATING INSTRUCTIONS Normal operation of an ANETS Fryer requires that the kettle is filled with liquid shortening to above the lower indent level marked on the rear of the kettle, before lighting the fryer’s main burners. CAUTION: Shortening MUST be in liquid form to avoid scorching or discoloration and possible damage to the kettle. Damage caused by melting solid shortening will NOT be covered by the warranty. FRYER PREPARATION FOR USE “BOIL OUT”...
Page 9
9 L20-349 R3 FRYER OPERATING LIGHTING PROCEDURE N OTE: The gas line of a new fryer installation may contain a considerable amount of air which will hinder immediate lighting. You may have to press in the control knob as long as several minutes before the pilot flame burns steadily. 1. Open the front door and ensure that the fryer’s thermostat knob is set to OFF. 2. Open the gas supply line inlet valve to the fryer by aligning the gas valve handle with the gas...
Page 10
10 L20-349 R3 FRYER OPERATING INSTRUCTIONS (Continued) DAILY CLEANING PROCEDURE NOTE: Cleaning is recommended at the end of a workday to prepare the fryer for proper operation the next time it is to be used. 1. Open the front door of the fryer. Attach the drain extension to the drain ball valve. 2. Perform the Shutdown Procedure. Ensure that the gas supply line inlet valve is closed (handle cross-wise to pipe line) and the pilot flame is...