Home
>
AirComm Corporation
>
Air Conditioner
>
AirComm Corporation Bell Air Conditioner206AB Installation Instructions TORQLOK PLUMBING
AirComm Corporation Bell Air Conditioner206AB Installation Instructions TORQLOK PLUMBING
Have a look at the manual AirComm Corporation Bell Air Conditioner206AB Installation Instructions TORQLOK PLUMBING online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 74 AirComm Corporation manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
![](/img/blank.gif)
AIR COMM CORPORATION Boulder Municipal Airport 3330 Airport Road Boulder, CO. 80301 [email protected] Report 206EC-250M BELL 206A/B CABIN AIR CONDITIONING SYSTEMS INSTALLATION INSTRUCTIONS (TORQ-LOK PLUMBING) This Document contains: Flight Manual Supplement STC Certificate Service Instructions REV E 8 September 2011
![](/img/blank.gif)
Page i 206EC-250M Rev E Revisions Rev Date Description Appl A 03/07/05 Page II-1- Added data for evap blower motor change and correct dual fwd evap arm. ES61142-1 motor weighs .75 lbs more than ES61060-2 motor. Pg. 5- added Fasco motor to list. Revised Pgs 17 and 18 to include both the ES61060-2 (Panasonic motor) and the ES61142-1 motor (Fasco ) B 09/22/05 Part number ES61060-2 blower motor replaced With part number ES61064-1. Page 5 of 20. C 12/27/2007 Part number ES57008-2 Replaced by part number ES57178-1. Pages 4 of 20, 5 of 20, 17 of 20 and 18 RM of 20 D 10/7/08 Part number ES26112-4 Replaced by part number ES26194-4. Pages I, 1 of 20, 5 of 20, and 19 of 20. RM E 9/8/11 Changed Overhaul / Replacement schedule criteria. Page 14 of 21. RL
![](/img/blank.gif)
Page ii 206EC-250M Rev E Table of Contents Item Page Revisions i Introduction 1 References 1 Installation Instructions I – 1 Weight & Balance Data II – 1 Post Installation Check List III – 1 Customer Feedback IV – 1 STC Certificate V – 1 Flight Manual Supplement VI – 1 Appendix A VII – 1 Maintenance Instructions- Bell 206 A/B Air Conditioning System. Appendix B Warranty & Parts Return Procedure VIII – 1
![](/img/blank.gif)
Page 1 206EC-250M Rev E Introduction This document provides maintenance and service information for the ACC 206EC-201 Cabin Air Conditioning system installation in the Bell 206 A/B helicopter. The drawings listed below are considered to be a part of this document. Reference Documents 1. Dwg 206EC-201 General Arrangement – 206 A/B Air Conditioner system (Torq-Lok). 2. Dwg 206EC-304 Compressor Installation. 3. Dwg 206EC-548 Plumbing Installation. 4. Dwg 206EC-646 Single Forward Evaporator Installation. (L/H Primary) 5. Dwg 206EC-648 Dual Forward Evaporator Installation. 6. Dwg 206EC-628 Aft Evaporator Installation. 7. Dwg 206EC-682 Air Distribution System. 8. Dwg 206EC-728 Condenser Installation. 9. Dwg 206EC-854 Electrical Installation.
![](/img/blank.gif)
Page I – 1 206EC-250M Rev E INSTALLATION INSTRUCTIONS
![](/img/blank.gif)
Page I – 2 206EC-250M Rev E Installation Instructions General Arrangement 1. Disconnect battery, open engine cowling, remove the two (2) access panels on each side of the instrument console. 2. Remove the upper and aft baggage compartment panels. 3. Remove “hat rack” and aft cabin headliners. 4. Care should be taken to prevent contamination of the Air Conditioner system. All end plugs on all plumbing assemblies and system components should not be removed until the components are connected. If the system becomes contaminated, it must be flushed according to the procedures presented in Appendix A. Compressor Installation Install in accordance with the installation instructions, drawing notes and information on the face of the drawing. Plumbing Installation 1. Thoroughly review drawing and drawing notes. 2. Install system according to drawing requirements. 3. Check off all items on the drawing to insure that the installation is complete. Forward Evaporator Installation Install in accordance with the installation instructions, drawing notes and information on the face of the drawing. Installation instructions continued on next page.
![](/img/blank.gif)
Page I – 3 206EC-250M Rev E Installation instructions continued: Aft Evaporator Installation Install in accordance with the installation instructions, drawing notes and information on the face of the drawing. Air Distribution Installation Install in accordance with the installation instructions, drawing notes and information on the face of the drawing. Condenser Installation Install in accordance with the installation instructions, drawing notes and information on the face of the drawing. Electrical Installation 1. Thoroughly review drawing and all drawing notes. 2. Install system according to drawing requirements. 3. Check off all items on the drawing to insure that installation is complete.
![](/img/blank.gif)
Page II – 1 206EC-250M Rev E WEIGHT AND BALANCE DATA Correct aircraft empty weight and center of gravity as indicated below: ITEM Wt. Arm Mom. (lbs) (in.) (in-lbs) 206 A/B Installation * 206EC-201-1 Air Conditioner 82.57 128.9 10644 (Standard – one L/H Fwd. & one Aft. Evap) S-6078EC-1 Aft Evap Blower- Panasonic 206EC-201-1 Air Conditioner 83.4 129.11 10762 (Standard – one L/H Fwd. & one Aft. Evap) S-6102EC-1 Aft Evap Blower- Fasco 206EC-201-2 Air Conditioner 82.57 128.9 10644 (One R/H Fwd. & one Aft. Evap) S-6078EC-1 Aft Evap Blower- Panasonic 206EC-201-2 Air Conditioner (One R/H Fwd. & one Aft. Evap) 83.4 129.11 10762 S-6102EC-1 Aft Evap Blower- Fasco 206EC-201-3 Air Conditioner 94.00 117.5 11049 (Dual Fwd. & one Aft. Evap) S-6078EC-1 Aft Evap Blower- Panasonic 206EC-201-3 Air Conditioner 94.75 118.1 11194 (Dual Fwd. & one Aft. Evap) S-6102EC-1 Aft Evap Blower- Fasco *S-6102EC-1 Aft evap. Blower with Fasco motor replaces S-6078EC-1 with Panasonic motor
![](/img/blank.gif)
Page III – 1 206EC-250M Rev E POST INSTALLATION CHECK LIST
![](/img/blank.gif)
POST AIR CONDITIONING SYSTEM INSTALLATION CHECKLIST Confirmation of proper direction of rotation of Evaporator Blower Wheels. (See Electrical System Dwg.) Note: Blower will work with blower wheel rotating in incorrect direction, But airflow will be significantly decreased, degrading system performance. _ Refrigerant Plumbing system oil charged. (See Plumbing Inst! Dwg.) _ Check Compressor hose routing and clamping to avoid hose kinking in the bend radius _ Check Condenser Blower to insure that fan bladelhousing clearing exist. Look for wear marks on inside of fan shourd. If rubbing exist contact Air Comm Corporation _ Prior to charging the system, we recommend leak checking with dry nitrogen at (150 psi) using soap and water solution to bubble check connections. _ Charge system according to instructions. If system is undercharged or overcharged the AIC will not work provide maximum cooling. For R-134a system, overcharging system will degrade performance more than slightly undercharging. _ Leak check all joints after system charging, using an electronic leak detector*. This is critical to insure continued optimum AlC performance. Use torque seal after torquing of joints and leak checkhas satisfactorily been performed. *Note: Using other than an electronic detector for final leak detection is unreliable and may allow some slow leaks to go undetected _ Check Evaporator air ducting to insure that: _ Ducts are securely clamped to duct connections _ Duct liner wire is in place to preclude collapse. _ Insure louvers are properly installed per drawing. _The Condenser Heat Exchanger rubber seal strip is properly positioned to insure a complete seal exist between the condenser heat exchanger and lower aft fuselage f airing. Inspect condenser inlet screen for proper security. _ The three lightening holes located at the lower aft edge of baggage floor are properly sealed. (See Condenser lnst Dwg). _ Insure proper alignment of compressor and tail rotor drive pulley. Check for proper belt tension per drawing, Inspect for correct mounting of compressor per drawing. PLEASE RETURN CHECKLIST AND CUSTOMER FEED BACK FORMS TO HELP ACC MAINTAIN CUSTOMER SATISFACTION