Aarrow Fires Arrow Ecoburn operating and Installation Manual
Here you can view all the pages of manual Aarrow Fires Arrow Ecoburn operating and Installation Manual. The Aarrow Fires manuals for Stove are available online for free. You can easily download all the documents as PDF.
Page 11
Aarrow Ecoburn Stoves 11 INSTALLATION Due to the gradual introduction of Europe Chimney Standards chimneys will be specified according to their performance designation as defined in BS EN 1443 that covers the General Requirements for chimneys. The minimum performance designation required for use with solid fuel burning stoves is T450 N2 S D3. The flue and chimney installation must be carefully checked by a competent person before fitting the stove to ensure it is suitable and will work...
Page 12
Aarrow Ecoburn Stoves 12 INSTALLATION NOTE - Under no circumstances should this appliance be connected to a shared flue system, that serves any other heating appliance. TYPICAL REAR FLUE OUTLET (as per BS 8303-1) Maximum 150mm (6”) Horizontal Flue Section Minimum 150mm (6”) Diameter Flue Soot Door Fire Retardant Rope Packing Maximum 100mm (4”) Brick Up Aperture Fill Void
Page 13
INSTALLATION Aarrow Ecoburn Stoves 13 PLAN VIEW OF REGISTER PLATE AND CLEARANCES FOR NON INSULATED FLUES (Plan View Of Steel Register Plate, 1.5mm Thick Minimum ) Non Combustible Register Plate. Minimum 1.5mm Thick Steel. TYPICAL TOP FLUE OUTLET (as per BS 8303-1) Typical Metal Insulated Chimney System Installed To The Chimney Manufactures Instructions In Compliance With Building Regulations And BS 7566 Part 1 to 4
Page 14
ADJUSTING THE SELF LEVELLING FEET The Aarrow Ecoburn stoves are equipped with adjustable rear levelling feet, these are ideal for use where the hearth surface is not flat or level. Adjustment is as follows : Position the stove on the hearth into its final resting place, ensuring room for the flue connections etc. On the rear leg of the stove, loosen the pozi screw, and rotate the inner „cam‟ shaped levelling foot until this touches the hearth. (see fig. 2.) ...
Page 15
15 Aarrow Ecoburn Stoves INSTALLATION FINAL CHECK LIST Before handing over the installation to the customer it is a requirement under Document J that the appliance is lit and the functioning of the chimney system is checked for satisfactory operation. Be sure that the chimney is operating and ALL smoke and fumes are vented to the atmosphere through the chimney terminal. Check all joints and seals. Clean the outside of the appliance to prevent any...
Page 16
BUILDING CONTROL CONSENT CHECKLIST Hearths, Fireplaces, Flues and chimneys This checklist is to ensure heaths, fireplaces, flues and chimneys are satisfactory, and show what you have done to comply wi th the requirements of the Building Regulations 2000 approved Document J 2002 1. Building address where work has been carried out …………………………………………………………………………….... …………………………………………………………………………………………………………………………. 2. Identification of hearth, fireplace chimney or flue 3. Firing...
Page 17
ANNUAL MAINTENANCE It is important that your appliance is regularly serviced in accordance with these instructions. This should be carried out at least annually by a qualified person and should consist of the following : CLEANING Important; Under some circumstances soot can quickly build up on the throat plate and adjacent areas. The throat plate should be removed and checked monthly, and any debris stripped off. Similarly, clean the upper surface of the firebox. Remove the...
Page 18
Aarrow Ecoburn Stoves 18 SERVICE & MAINTENANCE SUMMER STORAGE / NON USAGE Please ensure that your stove is left clean and moving components are well lubricated for the summer months (during periods of prolonged non use). If possible store the throat plate outside of the stove, check all moveable components, at regular intervals, to ensure they are moving freely. Allow air movement through the stove, by opening the air wash and primary air inlet (s) controls to about half way open or...
Page 19
SERVICE & MAINTENANCE 19 Aarrow Ecoburn Stoves FIRE DOOR ROPE REPLACEMENT Periodically, visually check over the fire door rope seal for any damage, cuts or tears and any detached sections. The rope gasket can be replaced, using the universal rope kit (see spare parts guide Page 32), please follow the instructions below : Ensure the appliance is cold. Lift the door off the appliance and lay onto a flat surface with the rear face upwards. Carefully remove the old...
Page 20
Aarrow Ecoburn Stoves 20 SERVICE & MAINTENANCE Please Note —This should be carried out when the fire is cold and unlit. FIRE DOOR PRIMARY AIR INLET Once a year inspect the primary air inlet assembly located at the base of the fire door. Lift the door assembly from the stove body and place on a level, work bench, with the rear face upper most. Remove the 2x no. fixings. Working from the front, withdraw the oval assembly from the door casting. Clean the...