Yamaha EF1000 Service Manual
Have a look at the manual Yamaha EF1000 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 255 Yamaha manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
•llllull PISTON, CAMSHAFT, CRANKCASE, CRANKSHAFT ENG 8 a A B c 3-14 2. Inspect: •Camshaft CD •Decompressor ell •Valve lifter@ Damage/Wear---+Replace. 3. Measure: •Camshaft diameter Out of specification--+Replace. Camshaft diameter: Standard: 12.0 mm (0.472 in) Limit: 11.9 mm (0.468 in) CRANKCASE INSPECTION 1. Inspect: •Cylinder walls Vertical scratches---+Rebore or replace cylinder. 2. Measure: •Cylinder inside diameter D NOTE: --------------------------- Obtain measurements at three depths by placing measuring instrument parallel to and at right angles to crankshaft. Out of specification---+Rebore cylinder, and replace piston and piston rings. ~ Standard Wear limit Cylinder inside 50.0 mm 50.15 mm diameter , Dl (1.969 in) (1.974 in) Cylinder Omm 0.5mm taper {0 in) (0.02 in) TI D=Maximum A,B,C T =Maximum A-Minimum C
.11111111 PISTON, CAMSHAFT, CRANKCASE, CRANKSHAFT ENG B 3-15 3. Inspect: •Crankcase Damage--+Replace. •Bearing Roughness--+Replace bearing. PISTON, PISTON PIN AND PISTON RING INSPECTION 1. Measure: •Piston skirt diameter P @=10 mm (0.4 in) from the piston bottom edge. Piston size P: Standard: 50.0 mm (1.969 in) Limit: 49.93 mm (1.966 in) 2. Measure: •Piston clearance Piston clearance= Cylinder inside diameter D Piston skirt diameter P Out of specification--+Rebore cylinder and replace piston and piston rings. Piston clearance: 0.020-0.035 mm (0.0008-0.0014 in) 3. Measure: •Piston pin diameter® Use a micrometer. Out of specification--+Replace. Standard piston pin diameter: 12.0 mm (0.47 in) Piston pin wear limit: 11.9 mm (0.468 in) (
PISTON, CAMSHAFT, CRANKCASE, CRANKSHAFT ENG B 3-16 4. Measure: •Piston ring end gap Use a Thickness gauge. Out of specification-+Replace. NOTE: ________________________ __ You cannot measure end gap on expander spacer of oil control ring. If control ring rails show excessive gap, replace all three rings. Piston ring end gap: 0.1-0.25 mm (0.004-0.01 in) Piston ring end gap limit: 0.9 mm (0.0354 in) 5. Measure: •Piston ring side clearance Use a Thickness gauge. Out of specification-+Replace. NOTE: ________________________ ___ Clean carbon from piston ring grooves and rings before measuring side clearance. Piston ring side clearance Top ring: 0.06 mm (0.0024 in) 2nd ring and oil ring: 0.04 mm (0.0016 in) Piston ring side clearance limit: 0.15 mm (0.006 in) CRANKSHAFT INSPECTION 1. Measure: •Crankshaft runout Use a Dial gauge. Out of specification-+Replace. Crankshaft runout limit: 0.02 mm (0.0008 in)
•llllull PISTON, CAMSHAFT, CRANKCASE, CRANKSHAFT ENG B 3~ 3-17 2. Measure: •Crankpin outside diameter Use a micrometer. Out of specification-+Replace. Crankpin outside diameter: 22.0 mm (0.87 in) Crankpin outside diameter limit: 21.9 mm (0.86 in) 3. Measure: •Oil clearance Use a plastigauge ®. Out of specification-+Replace connec ting rod. Oil clearance: 0.016-0.034 mm (0.0006-0.0013 in) Oil clearance limit: 0.1 mm (0.004 in) Oil clearance measuring steps: 1. Clean all parts thoroughly. 2. Place plastigauge® onto crankpin. 3. Install the connecting rod and cap onto crankcase. 4. Torque both cap bolts evenly. ~ Connecting rod cap bolt: ~ 9 Nm (0.9 m•kg, 6.5 ft•lb) 5. Remove the connecting rod and mea- sure the plastigauge® width. FLYWEIGHT SHAFT (GOVERNOR) GEAR INSPECTION 1. Inspect: •Collar CD •Washer@ •Flyweight gear@ Damage/Wear-+ Replace.
•llllnll PISTON, CAMSHAFT, CRANKCASE, CRANKSHAFT ENG 8 3-18 CRANKCASE COVER INSPECTION 1. Inspect: •Crankcase cover •Bearing Damage/Roughness---+Replace. PISTON RING AND PISTON INSTALLATION 1. Install: •Piston rings CAUTION: • Be sure to install rings so that manufactur ers marks
.11111111 PISTON, CAMSHAFT, CRANKCASE, CRANKSHAFT ENG B 3-19 Be sure the II V II mark on the piston head faces to push rod side. CONNECTING ROD INSTALLATION 1. Install: •Connecting rod cap CAVrtoN: --------------------Be sure the connecting rod mark
RECOIL STARTER ENG RECOIL STARTER I 40 Nm (4.0 m•kg, 29 ft•lb) I 13 JOB INSTRUCTION CHART Order Job name/Parts name Qty Remarks Removal of recoil starter Remove the parts in order. Body cover/Fuel tank Refer to the BODY COVER and FUEL TANK section in CHAPTER 2. 1 Bolt 4 2 Recoil starter 1 3 Starter handle 1 4 Bolt 1 5 Drive plate 1 6 Drive spring 1 7 Drive pawl 1 8 Spring 1 9 Drum sheave 1 10 Starter spring 1 11 Spacer 1 12 Starter rope 1 13 Nut 1 14 Washer 1 15 Starter pulley 1 Reverse the removal procedure for installation. 3-20
- RECOIL STARTER ENG RECOIL STARTER REMOVAL CAUTION: Release the spring pre-load before removing the sheave drum bolt. Hook the rope into the sheave drum slot G) and turn the sheave drum assembly clockwise. 1. Untie: •Knot
3-22 •nnull RECOIL STARTER ENG B RECOIL STARTER INSTALLATION 1. Install: •Starter spring CD •Sheave drum~ CAUTION: Engage the spring hook @ with the drum slit, then wind the spring counterclockwise into the drum from larger to smaller diame ter. 2. Install: •Starter rope CAUTION: Engage the spring hook
FLYWHEEL ENG FLYWHEEL 3 7 6~ I 4 Nm {0.4 m•kg, 3 ft•lb) JOB INSTRUCTION CHART Order Job name/Parts name Qty Remarks Removal of Flywheel Remove the parts in order. Recoil starter Refer to the RECOIL STARTER section. 1 Nut 1 2 Washer 1 3 Starter 1 4 Flywheel 1 5 Key 1 6 Screw 1 7 Coil assembly 1 Reverse the removal procedure for installation. 3-23