Vodavi Triad 1/2/3 Installation Manual
Here you can view all the pages of manual Vodavi Triad 1/2/3 Installation Manual. The Vodavi manuals for Communications System are available online for free. You can easily download all the documents as PDF.
Page 101
2-80 Caller ID Interface Unit Installation Figure 2-35: SMDR Printout The SMDR f eature provide s de taile d records of al l outgoing a nd/or incoming, long dis tance only or a ll calls . The SMDR Quali fica tion Tim er de termi nes the leng th of time that is nee ded to dete rmine a va lid SMDR cal l for rep orti ng p urp os e s. By def ault, this time r is s et to 3 0 s econds and is varia ble f rom 0 0 to 6 0 se conds in 1 se c. increm ents . This fe ature is ena bled or dis able d in sy ste m program...
Page 102
Ca ll er ID In ter fac e Uni t In sta ll at i on 2 - 81 ICLI D 30 character forma t selected: 123 123456789012345678901234567890 ST A CO T OTA L ST AR T DA TE 1000 001 00:00:19 09:32 08/28/00(CR)(LF) O 480-443-6000(CR)(LF) 123456789012 **(CR)(LF) ICLI D 80 character forma t selected: 1 234 56 78 12345678901234567890123456789012345678901234567890123456789012345678901234567890 ST A CO T OTA L ST ART DA TE DIA LED ACCO UNT CODE COS T 1000 001 00:00:36 04:37 08/28/00 I1-480-443-6000 **(CR)(LF) **VODA VI (...
Page 104
3 Triad 3System Installation This chapter contains the basic system installation and wiring instructions for theTriad 3System, as well as how to install the op t i o na l c ar d s a n d u ni t s .
Page 106
Introduction3-3 Introduction As with any sophisticated communications device, installation of the STARPLUSTri ad 3S yst em, r equi r es the c a re and for et hought of a competent technician. To assure easy servicing and reliable operation, se veral fa ctors must be cons ide re d w hen pla nnin g the syste m installation. The installation proceeds in these major steps: †Si te Pre par at ion †KSU and Power S upply ( PS ) Installa tion †PCB Installation †Sys te m Wi r ing †Keys et & Ter mi nal I nst al lat...
Page 107
3-4 Site Preparation †The l ocati on must have a cce ss to a d edi cat ed 11 0 Volt A C ( ±1 0% ), 60 Hz , si ngl e-p hase c ir c uit wi th a c ir c uit br eak er or f use r at ed a t 1 5 amps . A 3- wire (paralle l blade grounde d outle t should b e within app roximately 6 feet of the lower lef t rear of the BKSU mounting. †The l ocati on must have a cce ss to a g ood e ar t h gr ound, s uch as a metallic cold water pipe with no non-metallic joints. The ground source should be located as close as...
Page 108
Site Preparation 3-5 Ver if y O n- Site Equ ipmen t Once the e quipme nt ins ta llation s ite has bee n identifie d a nd a dedicated AC outlet, earth ground, and lighting and ventilation are available, verify that all equipment required is on-site and has not been damaged during shipme nt. Unpa ck th e KS Us a nd the PS Us a nd as sure the re is no s hip ping dama ge. A mounting template is packed with each KSU, and this template is required later in the installation. Check that the type and quantity of...
Page 109
3-6 Site Preparation Figure 3-1 : Basic Ca bine t (BK SU) w /Expa ns ion KS U (EKS U1 /E KSU2) In ce rtai n con figura tion s, i t is p ossi ble to not h ave all ca rd slots uti lize d due to powe r capa citi es. Use th e Co nfigu rator Pr ogram to c alcu late the c orre ct con figur ation .
Page 110
KS U & Power Supp ly (PSU) In sta llat ion 3-7 KSU & Power Supply (PSU) Installation The system consists of a maximum of two cabinets that can be stacked tog ether. The firs t ca binet, or Ba sic KSU (BKSU), houses the commo n equi pme nt boa rds and pe ri phe ra l equi pme nt boar ds . T he Expa nsi on cabinet (EKSU2) mounts to the right of the BKSU. The c ar d s lot s in Expa nsi on c ab ine t house s only pe ri phe ral b oar ds. Any ar ra ngeme nt of CO Li nes , S tat i ons, et c . i s per mi tt e d....