Home
>
Panasonic
>
Air Conditioner
>
Panasonic MVA Series Air Handling Unit Mva18 24 30 36 42 48 60 Fbas6hbcp Installation Operation And Maintenance Manual
Panasonic MVA Series Air Handling Unit Mva18 24 30 36 42 48 60 Fbas6hbcp Installation Operation And Maintenance Manual
Here you can view all the pages of manual Panasonic MVA Series Air Handling Unit Mva18 24 30 36 42 48 60 Fbas6hbcp Installation Operation And Maintenance Manual . The Panasonic manuals for Air Conditioner are available online for free. You can easily download all the documents as PDF.
Page 1
035-000039-001 Page 1 of 32 MVA IOM 1.3 9-10-2014 MVA Series units are direct drive vertical and multi-position Air Handlers delivering nomi- nal cooling capacities of 1.5 to 5 tons.Units may be specified with hot water or electric heat- ing coils to meet space cooling loads or heating loads or both. Two styles of unit orientation are available for maximum flexibility. How to Use this Manual: This manual gives instructions regarding in- stallation, operation and maintenance for the MVA Series air...
Page 3
035-000039-001 Page 3 of 32 MVA IOM 1.3 9-10-2014 /ŶƐƚĂůůĂƟŽŶ͕^ƚĂƌƚ-Up and Service /ŶƐƚƌƵĐƟŽŶƐ MVA Series Air Handling Unit Installation, Operation and Maintenance Manual Topic Page SAFETY CONSIDERATIONS1, 5 PRODUCT NOMENCLATURE6-7 UNPACKING8 INSTALLATION8 Pre -installa tion8 Rigging8 Unpa cka ging8 Service Clea ra nce s8,11 Return Air & Unit Orie nta tion9 Vertica l to Horizonta l Conve rsion (EEV)10 Unit Suspe nsion or Floor Mount8,12,13 Conde nsa te Dra in12 Ductw ork12 Refrige ra nt Piping14 Ele...
Page 5
035-000039-001 Page 5 of 32 MVA IOM 1.3 9-10-2014 WARNING CHECK the assembly and component weights to be sure that the rigging equipment can handle them safely. Note also, the centers of gravity and any specific rigging instructions. CHECK for adequate ventilation so that fumes will not migrate through ductwork to occupied spaces when welding or cutting inside air-handling unit cabinet or plenum. WHEN STEAM CLEANING COILS be sure that the area is clear of personnel. DO NOT attempt to handle access covers...
Page 6
035-000039-001 Page 6 of 32 MVA IOM 1.3 9-10-2014 PRODUCT NOMENCLATURE Unit Type/Size Code Selection 01, 02 MV Generation/Series Code Selection 03 A Unit Type/Size Code Selection NOM Capacity 18 24 3030,000 Btu/hr 36 42 48 60 Primary Coil Type Code Selection 06F4 ROW DX with electronic expans ion valve, R-410a Heating Coil Code Selection B Future Use Description Code Selection 08A Unit Grade Description Code Selection 09S Future Us e Standard 04, 05 18,000 Btu/hr 24,000 Btu/hr 36,000 Btu/hr 60,000...
Page 7
035-000039-001 Page 7 of 32 MVA IOM 1.3 9-10-2014 Unit Voltage CodeSelection 106 Controls CodeSelection 11 H Return Air Cabinet Options Ordering Number CodeSelectionReturn Location BBottom Return Drain Pan CodeSelection C Tracking Description CodeSelection 14P Unit Orientation Internal Us e 12 Description drain pan and cabinet insulation type 13Fiberglas s , Univers al Drainpan - Galvanized Vert ic al (F ro nt RH Co ndD rain C nx) o r Ho rizo nt alR ight Description 208/230/1/60 ECM-VE(customer change...
Page 8
035-000039-001 Page 8 of 32 MVA IOM 1.3 9-10-2014 Pre-installation 1. Check items received against packing list. 2. Do not stack unit components or accesso- ries during storage. Stacking can cause damage or deformation. 3. If unit is to be stored for more than 2 weeks prior to installation, observe the following precautions: a. Choose a dry storage site that is rea- sonably level and sturdy to prevent un- due stress or permanent damage to the unit structure or components. Do not store unit on vibrating...
Page 9
035-000039-001 Page 9 of 32 MVA IOM 1.3 9-10-2014 INSTALLATION Figure 1 Return Configurations and Unit Orientations NOTE: Electronic Expansion Valve (EEV) must be oriented vertically, and is shipped for vertical cabinet orienta- tion. For horizontal cabinet orientation, follow procedure to rotate the EEV assembly.Refer to Figure 2. WARNING FOR HORIZONTAL CABINET ORIEN- TATION, EEV MUST BE ROTATED TO VERTICAL POSITION! Failure to reori- ent the EEV can result in improper unit operation or equipment...
Page 10
035-000039-001 Page 10 of 32 MVA IOM 1.3 9-10-2014 INSTALLATION—VERTICAL TO HORIZON- TAL CONVERSION—EEV ROTATION WARNING FOR HORIZONTAL CABINET ORIENTATION, EEV MUST BE ROTATED TO VERTICAL POSITION! Failure to reori- ent the EEV in VERTICAL position can result in improp- er unit operation or equip- ment damage or dangerous condition. CONVERSION PROCEDURE: 1. UNIT IS SHIPPED WITH NITROGEN CHARGE. IF UNIT HAS ALREADY BEEN CHARGED WITH REFRIGERANT, REMOVE RE- FRIGERANT CHARGE PER LOCAL CODES BE- FORE...