Panasonic Cs A9dka Cu A9dka Cs A12dka Cu A12dka Repair Manual
Here you can view all the pages of manual Panasonic Cs A9dka Cu A9dka Cs A12dka Cu A12dka Repair Manual. The Panasonic manuals for Air Conditioner are available online for free. You can easily download all the documents as PDF.
Page 51
DISPOSAL OFOUTDOOR UNITDRAIN WATER • If the drain elbow is used, the unit should be placed on a stand which is taller than 3cm. • If the unit is used in an area where temperature falls below 0° C for 2 or 3 days in succession, it is recommended not to use a drain elbow, for the drain water freezes and the fan will not rotate. CHECK THEDRAINAGE • Open front panel and remove air filters. (Drainage checking can be carriedout without removing the front grille.) • Pour a glass of water into the drain...
Page 52
CHECK ITEMS Is there any gas leakage at flare nut connections? Has the heat insulation been carried out at flare nut connection? Is the connecting cable being fixed to terminal board firmly? Is the connecting cable being clamped firmly? Is the drainage OK? (Refer to “Check the drainage” section) Is the earth wire connection properly done? Is the indoor unit properly hooked to the installation plate? Is the power supplyvoltage complied with rated value? Is there any abnormal sound? Is the cooling...
Page 53
11 2-way, 3-way Valve 2-way Valve (Liquid Side)3-way Valve (Gas Side) WorksShaft PositionShaft PositionService Port ShippingCloseCloseClose (With valve cap)(With valve cap)(With cap) EvacuationCloseCloseOpen (Installation and(Counter-Clockwise)(Clockwise)(Push-pin) Re-installation) OperationOpenOpenClose (With valve cap)(With valve cap)(With cap) Pumping downCloseOpenOpen (Transferring)(Clockwise)(Counter-Clockwise)(Connected manifo ld gauge) EvacuationOpenOpenOpen (Servicing)With vacuumpump Gas...
Page 54
Required tools: hexagonal wrench, adjustable wrench, torque wrenches, wrench to hold the joints and gas leak detector. The additional gas for air purging has been charged in the outdoor unit. However, if the flare connections have not been done correctly and there gas leaks, a gas cylinder and the charge set will be needed. 1. Recheck the piping connections. 2. Open thevalve stemof the2-wayvalvecounter- clockwise approximately 90°, wait 10 seconds, and then set it to closed position. • Be sure to use...
Page 55
1. Confirm that both the 2-way and 3-wayvalves are set to the opened position. • Remove the valve stem caps and confirm that the valve stems are in the opened position. • Be sure to use a hexagonal wrench to operate the valve stems. 2. Operate the unit for 10 to 15 minutes. 3. Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-wayvalve. • Connect the charge hose with the push pin to the Gas service port. 4. Air purging of the charge hose. • Open the...
Page 56
11.1.3. Re-air purging (Re-installation) 1. Confirm that both the 2-way and 3-wayvalves are set to the closed position. 2. Connect the charge set and a charging cylinder to the service port of the 3-wayvalve. • Leave the valve on the charging cylinder closed. 3. Air purging. • Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on the 2-wayvalve approximately 45° for3 seconds then closing it for 1 minute; repeat 3 times. • After purging the air, use...
Page 57
(Gas leakage) 1. Confirm that both the 2-way and 3-wayvalves are set to the open position. 2. Connect the charge set tothe 3-way valve’s service port. • Leave the valve on the charge set closed. • Connect the charge hose with the push pin to the service port. 3. Open the valves(Low side) on the charge set and discharge the refrigerant until the gauge indicates 0.5 to 1 kg/cm 2G (0.05 to 0.1 MPa). • If there is no air in the refrigeration cycle [ the pressure when the air conditioner is not running...
Page 58
(No refrigerant in the refrigeration cycle) 1. Connect the vacuum pump to the charge set’s centre hose. 2. Evacuation for approximately one hour. • Confirm that the gauge needle has moved toward -0.1 MPa (-76 cmHg) [vacuum of 4 mmHg or less.] 3. Closethe valve(Low side) on thecharge set, turn off the vacuum pump, and confirm that the gauge needle does not move (approximately 5 minutes after turning off the vacuum pump). 4. Disconnect the charge hose from the vacuum pump. • Vacuum pump oil If the...
Page 59
11.1.6. Gas charging (After Evacuation) 1. Connect the charge hose to the charging cylinder. • Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of the cylinder. 2. Purge the air from the charge hose. • Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the air (be careful of the liquid refrigerant). 3. Open the valve(Low side) on thecharge set and charge the system with liquid refrigerant. • If the system...
Page 60
• Electronic controller and Display Complete unit can be seen by following the below removal procedures. Fig. 1 − Remove the 2 caps and 2 screws at the bottom of the Front Grille. (Fig. 1) Fig. 2 − Remove the Front Grille Complete. (Fig. 2) Fig. 3 − Release the taps on top and on the right side of metal plate cover. (Fig. 3) − Then remove the metal plate cover. (Fig. 3) − Remove the indicator complete screw, and then remove the indicator complete. (Fig. 3) 12 Servicing Information 12.1. Distinction...