    Have a look at the manual Land Rover Lt230t Transfer Box Overhaul 3rd Edition Rover Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 364 Land Rover manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							TRANSFER BOX
    26
    OVERHAUL 15.If load to turn figure is below that specified,
    proceed as follows.
    16.Remove front output shaft together with brake
    drum.
    17.Remove 8 bolts securing front half differential
    carrier.
    18.Remove front half differential carrier.
    19.Remove front half carrier sun gear and thrust
    washer.
    20.Select a thicker thrust washer from the range
    available.
    NOTE: 5 thicknesses of thrust washers are
    available rising in increments of 0.10 mm
    (0.004 in) from 1.05 to 1.45 mm (0.04 to
    0.06 in).
    21.Position selected thrust washer and sun gear
    in front half carrier.
    22.Fit front half carrier to rear ensuring that
    alignment marks are together.
    23.Fit bolts and tighten by diagonal selection to 60
    Nm (44 lbf.ft).
    24.Fit front output shaft and brake drum and
    repeat load to turn check.
    25.Repeat above procedures as necessary until
    load to turn figure is as specified; record final
    figure obtained.
    26.Remove brake drum from front output shaft,
    remove output shaft.
    27.Remove bolts securing front half carrier.
    28.Remove front half carrier, remove sun gear
    and thrust washer.
    CAUTION: Keep selected thrust washer
    with sun gear.
    29.Remove retaining ring.
    30.Remove planet gears and cross shafts.
    31.Fit a 1.05 mm (0.04 in) thick thrust washer to
    rear half carrier sun gear, position gear in rear
    half carrier.
    32.Fit planet gears, cross shafts and dished thrust
    washers in rear half carrier.
    CAUTION: Ensure that planet gears are
    fitted to their respective cross-shafts and
    cross-shafts are fitted in their correct
    location in half carrier.
    33.Fit retaining ring.
    34.Fit front half carrier to rear ensuring that
    alignment marks are together.
    CAUTION: Do not fit sun gear and thrust
    washer into front half carrier.
    35.Fit bolts and tighten by diagonal selection to 60
    Nm (44 lbf.ft). 
    						
    							TRANSFER BOX
    OVERHAUL27
    36.Invert assembly in vice and then insert rear
    output shaft into rear half carrier, check that
    gears rotate freely.
    37.Fit output flange on to splines of output shaft,
    do not fit flange nut at this stage.
    38.Fit transmission brake drum to output flange,
    secure with 2 nuts.
    39.Carry out load to turn check using same
    method as for front half carrier.
    40.When load to turn figure is correct, record final
    figure.
    41.Upon completion, fit sun gear and selected
    thrust washer to front half carrier.
    42.Fit front half carrier ensuring that alignment
    marks are together.
    43.Fit bolts and tighten by diagonal selection to 60
    Nm (44 lbf.ft).
    44.With differential assembled, fit rear output shaft
    and brake drum and check overall load to turn.
    This should be approximately equal to total
    load to turn figure of both front and rear half
    carriers added together:
    Used gears = 0.90 kg (2.0 lb)
    New gears = 3.44 kg (7.6 lb)
    45.Secure rear half carrier in a soft-jawed vice.
    46.Fit a new front bearing using toolLRT-41-008. 
    						
    							TRANSFER BOX
    28
    OVERHAUL
    47.Support front half carrier in a soft-jawed vice.
    48.Fit low range gear ensuring that dog teeth on
    gear are towards threaded end of shaft.
    NOTE: Use a suitable hollow mandrel to fit
    gear if it is tight on splines.
    49.Fit high/low hub ensuring that alignment mark
    made during dismantling is towards threaded
    end of shaft.
    50.Fit high/low selector sleeve ensuring that
    alignment marks on hub and sleeve are
    together.
    51.Fit bush to high range gear ensuring that collar
    on bush is on opposite side of gear to the dog
    teeth.
    52.Fit high range gear and bush ensuring that
    collar on bush is towards threaded end of
    shaft.
    53.Fit a new rear bearing using toolLRT-41-008.
    54.Fit a new bearing retainer nut, tighten to 72 Nm
    (53 lbf.ft) using toolLRT-41-007.
    CAUTION: Do not stake nut at this stage. 
    						
    							TRANSFER BOX
    OVERHAUL29
    55.Slide high/low selector sleeve and hub away
    from low range gear.
    56.Using feeler gauges, determine clearance
    between low range gear and high/low hub:
    Clearance = 0.05 to 0.15 mm (0.002 to 0.006
    in)
    57.If clearance is not as specified, fit a new low
    range gear and high/low hub and re-check.58.Slide high/low selector sleeve and hub away
    from high range gear.
    59.Using feeler gauges, determine clearance
    between high range gear and high/low hub:
    Clearance = 0.05 to 0.15 mm (0.002 to 0.006
    in)
    60.If clearance is not as specified, fit new high
    range gear and high/low hub and re-check.
    61.Using a round nosed punch, stake collar of nut
    into recess in differential shaft. 
    						
    							TRANSFER BOX
    30
    OVERHAUL Main casing
    1.Fit a new differential rear bearing track using
    toolLRT-51-009.
    2.Using a straight edge and feeler gauges, check
    that bearing track is recessed 1.0 mm (0.04 in)
    below outer face of main casing.
    3.Using a suitable mandrel, fit a new mainshaft
    input gear bearing track.
    CAUTION: Ensure bearing tracks are
    seated squarely in recesses.4.Lubricate a new mainshaft oil seal with
    recommended oil.
    5.Invert main casing and fit oil seal, lip side
    facing inwards, using toolLRT-37-014. 
    						
    							TRANSFER BOX
    OVERHAUL31
    Mainshaft input gear bearing housing
    1.Ensure bearing track recess in housing is
    clean.
    2.Position a 3.15 mm (0.12 in) thick shim in
    bearing housing.
    NOTE: This is the the thinnest of the
    shims available.
    3.Using a suitable mandrel, fit new mainshaft
    input gear bearing track.
    CAUTION: Ensure bearing track is seated
    squarely in recess.Mainshaft input gear assembly
    1.Lubricate new bearings with recommended oil.
    2.Secure hand pressLRT-99-002in a vice.
    3.Position collarsLRT-41-003in hand press.
    4.Position new bearing on collars.
    NOTE: Smallest diameter of bearing must
    be towards collars.
    5.Locate end of mainshaft in bearing, press
    mainshaft through bearing.
    6.Repeat above procedure for remaining
    bearing. 
    						
    							TRANSFER BOX
    32
    OVERHAUL Intermediate gears.
    1.Lubricate new bearings and bearing tracks with
    recommended oil.
    2.Fit new circlips into intermediate gears.
    CAUTION: Ensure that circlips are
    correctly seated.
    3.Fit new bearing outer tracks using tools
    LRT-41-006andLRT-99-003.
    CAUTION: Ensure bearing tracks are fully
    seated against circlips.
    4.Retain bearings with intermediate gears.Rear output housing
    1.Heat rear output housing to 100°C (210°F).
    2.Fit new output shaft bearing using tool
    LRT-41-011.
    3.Allow housing to air cool.
    4.Fit new bearing retaining circlip ensuring it is
    seated in groove. 
    						
    							TRANSFER BOX
    OVERHAUL33
    5.Lubricate a new output shaft oil seal with
    recommended oil.
    6.Fit oil seal using toolLRT-41-012.
    NOTE: Use end of tool marked’REAR’to
    fit oil seal.
    7.Check that oil seal is just contacting circlip.
    8.Slide speedometer drive gear and spacer on to
    output shaft.
    9.Position rear output housing on bed of hand
    press.
    10.Locate threaded end of output shaft in bearing.
    11.Position thrust buttonLRT-37-11/2between
    end of output shaft and press mandrel.
    12.Press output shaft into bearing.
    13.Fit mud shield with open face of shield towards
    oil seal.
    CAUTION: Do not fit output shaft flange at
    this stage. 
    						
    							TRANSFER BOX
    34
    OVERHAUL
    14.Fit speedometer driven gear into rear output
    housing ensuring that gear teeth are engaged
    with drive gear.
    15.Lubricate a new’O’ring with recommended oil
    and fit to driven gear housing.
    16.Fit driven gear housing.
    17.Lubricate a new oil seal with recommended oil,
    fit seal with lip towards driven gear housing.Front output housing
    CAUTION: Do not carry out assembly
    operations until differential bearing
    pre-load has been established- See
    Differential bearing pre-load.
    1.Heat front output housing to 100°C (210°F).
    2.Fit new output shaft bearing using tool
    LRT-41-011.
    3.Allow housing to air cool.
    4.Fit new bearing retaining circlip ensuring it is
    fully seated in groove. 
    						
    							TRANSFER BOX
    OVERHAUL35
    5.Lubricate a new output shaft oil seal with
    recommended oil.
    6.Fit oil seal using toolLRT-41-012.
    NOTE: Use end of tool marked’FRONT’to
    fit oil seal.
    7.Check that oil seal is just contacting circlip.
    8.Position selected shim in front output housing.
    9.Fit differential front bearing track using tool
    LRT-54-003.
    10.Fit bearing spacer to output shaft ensuring that
    chamfer on spacer is towards threaded end of
    shaft.
    11.Fit dog clutch ensuring that flange on clutch is
    towards splined end of shaft.
    12.Using a mallet, drive output shaft into bearing. 
    						