Home > Honeywell > Controller > Honeywell 3 Way Valve Manual

Honeywell 3 Way Valve Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Honeywell 3 Way Valve Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 178 Honeywell manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							INSTALLATION
    INSTRUCTIONS
    V4073A Motorised Mid-Position Valve
    Application
    The V4073A valve has been designed to control the flow of
    water in a small bore domestic central heating system where
    both radiator and hot water cylinder circulation are pumped.
    It is typically suited for systems up to 90,000 Btu/h (26 KW).
    Specifications
    Voltage: 230-240V ~ 50Hz
    Power consumption: 6W
    Lead supplied: 1 metre, 5 core
    Operating temperature range: +5 to +88
    ˚C(Special models available for chilled water applications)
    Maximum ambient temperature: + 52˚C
    Pipe fitting sizes:
    22mm & 28mm compression fitting, 
    3/4” & 1” BSP
    Dimensions and KV values: See diagrams
    Spares available
    Powerhead Part No. 40003916-003
    Motor Part No. 40002737-003
    Ball & ‘O’ Ring Kit Part No. 272742A CARD
    Installation
    V4073A incorporates a manual
    lever, the lever should normally
    be in ‘AUTO’ position, but can
    be moved to ‘MAN OPEN ’
    position for system draindown
    and filling purposes only.
    Before fitting the valve, read
    through the plumbing and
    wiring instructions.
    This product MUST be
    installed by a competent
    person. The installation MUST
    conform to I.E.E. Regulations
    and with The Electricity at Work Regulations.
    A Class ‘A’ switch (having contact separation of at least
    3mm in all poles) must be incorporated in the fixed wiring
    as a means of disconnecting the supply. The system must
    be appropriately fused.
    Plumbing
    The valve MUST NOT be fitted on the return pipework
    under any circumtances. Flow from the boiler must be
    connected to port AB, the radiator circuit to port A and the
    hot water cylinder circuit to port B.
    The valve may be plumbed in at any angle but must not be
    mounted so that the valve head is below the horizontal
    level of the pipework. In the unlikely event of a leak a
    safety hazard could result.
    Do not grip the valve head while making and tightening up
    plumbing connections. Attach a spanner (32mm or 1
    1/4” AF)
    onto the valve body at each port, whilst tightening up the nuts.
    Tighten compression nuts enough to make a watertight seal.
    TAKE CARE NOT TO OVERTIGHTEN.
    CLEARANCE
    FOR COVER REMOVAL
    PRESSURE DROP
    (   p in mwc)
    INSTALLATION
    INSTRUCTIONS 
    						
    							Wiring
    The wiring diagram above shows relevant connections to a Honeywell junction box (Part No. 42002116-001). Ensure
    that each numbered, lettered or coloured wire is connected to the correct terminal in the junction box. Make sure all
    connections are good and all terminal screws are firmly tightened.
    Valve wiring configuration is: White = Heating on Blue = Neutral
    Grey = Hot water off Green/Yellow = Earth
    Orange = Boiler and pump live
    Notes:
    aWiring diagram shows connections to a programmer with separate control of heating and hot water.
    bIf single channel time clock is used, connect switched live from time clock to terminal 4 or 6 at junction box, then link
    terminal 4 to terminal 6 with a link wire.
    cIf the programmer or time clock have no ‘Hot water OFF’ terminal then the time clock will need to be replaced.
    dIf replacing a 6 wire relay model valve with a non relay 5 wire valve, contact Honeywell for advice.
    Checkout procedure
    To ensure the valve is plumbed and wired correctly, carry
    out the following checks after filling the system and
    switching on the power.
    1aCheck manual lever is in ‘AUTO’ position.
    bCheck programmer has power
    cCheck boiler is switched on and its thermostat
    set to maximum.
    2Confirm correct hot water functions as follows:
    aTurn room thermostat to minimum setting or switch off
    at programmer.
    bSet cylinder thermostat to maximum and programmer to
    ‘HOT WATER ON’.
    cBoiler should fire and pump should run. Feel pipe
    approximately 12” from valve port B, it should get hot.3Confirm correct heating functions as follows:
    aTurn cylinder thermostat to minimum or switch off
    at programmer.
    bSet room thermostat to maximum and programmer to
    ‘CENTRAL HEATING ON’
    cBoiler should fire and pump should run. Feel pipe
    approximately 12” from port A, it should get hot.
    4Confirm valve is functioning at mid position by switching
    ‘HEATING ON’ and ‘HOT WATER ON’ at the programmer.
    Set both thermostat to maximum, feel pipes approximately
    12” from both ports A and B. Both pipes should get hot.
    Completion
    Reset both thermostats to temperature required, normally
    60
    ˚C for cylinder thermostat and 20˚C for room thermostat.
    Return programmer to ‘Auto’ or mode selected by
    householder. Full installation, wiring and operating instructions
    for SUNDIAL products are included in every product pack. For
    special wiring diagrams or applications, contact Honeywell.
    Whilst Honeywell takes all practicable steps to design and manufacture its products to comply with the requirements of the Health and Safety at Work Act 1974, all
    products must be properly used and Purchasers are reminded that their obligations under the Act are to ensure that the installation and operation of such products at a
    place of work should be safe and without risk to them.
    Honeywell reserve the right at any time and without notice to change any product or information contained in this publication.
    The wiring diagrams and installation instructions in this publication are provided for guidance purposes when installing recognised standard systems only. Any application
    of this product not shown here, or any deviation from these instructions, is neither recommended nor advised. Any such application or deviation should be referred to
    Honeywell for technical assistance.
    Arlington Business Park
    Bracknell
    Berkshire RG12 1EB
    Telephone: 01344 656000Form No. 95C-10820
    Rev. 11/99
    Printed in Canada 
    						
    All Honeywell manuals Comments (0)

    Related Manuals for Honeywell 3 Way Valve Manual