Epson Mt532 Manual
Have a look at the manual Epson Mt532 Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 1734 Epson manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
6-8 Assembly and Disassembly Rev. A Confidential Pre-assembly D Reassembly stepPart name Assembly procedure 4 Cutter, motor assembly C.B.(M2.3 ´ ´ ´ ´ 3)´ 1 Screw, switcho Install the cutter, motor assembly to the cutter cover sub-assembly, and secure it with the C.B.(M2.3 ´ ´ ´ ´ 3). o Install the microswitch to the cutter cover sub-assembly, and secure it with the screw, switch. H o Tightening torque: 245 to 294 mN·m {2.5 to 3.0 kg·cm} ( C.B.(M2.3 ´ ´ ´ ´ 3)) o Tightening torque: 108 to 147 mN·cm {1.1 to 1.5 kg·cm} ( screw, switch) o Make sure to install the cutter, motor with the labeled side down. o Make sure that the cutter, motor is installed securely. o Make sure that the dowel on the microswitch fits securely in the mounting hole on the cutter cover sub-assembly. 5 Cutter drive gear sub-assembly Plain washer (3 ´ ´ ´ ´ 0.5 ´ ´ ´ ´ 7) ´ 1 R.E. (2.5) ´ 1o After lubricating the shaft on the cutter cover sub-assembly with G-36, install the cutter drive gear sub-assembly and the plain washer on the shaft; then secure them with an R.E. screw, switch C.B.(M2.3 ´ 3) microswitch cutter motor assembly cutter cover sub-assembly mounting hole R.E.(2.5)plain washer cutter drive gear sub-assembly cutter motor microswitch actuator G-36
Rev. A Assembly and Disassembly 6-9 EU-T532/T542 Technical Manual Confidential Pre-assembly D Reassembly stepPart name Assembly procedure H o Make sure not to apply excessive pressure to the microswitch actuator when installing the cutter drive gear sub-assembly. o Make sure not to damage the cutter drive gear sub-assembly when securing it with the R.E. Åo Lubricate the specified areas with G-36. G-36 G-36G-36
6-10 Assembly and Disassembly Rev. A Confidential Pre-assembly E Cutter unit Reassembly stepPart name Assembly procedure 1 Cutter cover sub-unit 2 Cutter frame assembly C.B.S-tite (M3 ´ ´ ´ ´ 5)´ 1o Pass the lead wire, paper cutter through the hole on the cutter frame assembly and secure the cutter cover sub-unit and the cutter frame assembly with a screw. o When putting the cutter cover sub-unit and the cutter frame assembly together, insert the shaft, movable cutter blade drive into the oval hole on the movable cutter blade. H o Tightening torque: 686 to 882 mN·m {7 to 9 kg·cm} o Make sure that the shaft, movable cutter blade drive fits securely into the oval hole on the movable cutter blade. o Make sure that the edges of the cutter cover sub-unit fit into the hooks on the cutter frame assembly. C.B.S-tite (M3 ´ 5) oval hole lead wire, paper cutter cutter cover, sub-unit cutter frame assembly shaft, movable cutter blade drive hook hook cutter frame assembly shaft, movable cutter blade drive oval hole cutter cover, sub-unit cutter cover, sub-unit
Rev. A Assembly and Disassembly 6-11 EU-T532/T542 Technical Manual Confidential Pre-assembly E Reassembly stepPart name Assembly procedure 3 Emergency cutter, full, B C.B.(M2 ´ ´ ´ ´ 2.5)´ 2o Install the emergency cutter, full to the cutter cover sub-unit with screws. H o Tightening torque: 147 to 196 mN·m {1.5 to 2 kg·cm} 4 Plate, A/Co Loosen the C.B.S-tite (M3 ´ ´´ ´ 5) to attach the plate A/C to the cutter cover sub-unit; tighten it again. C.B.(M2 ´ 2.5) plate, A/C C.B.S-tite (M3 ´ 5) cutter cover sub unit
6-12 Assembly and Disassembly Rev. A Confidential Pre-assembly F Installation of Black mark detector sub-assembly (optional) Reassembly stepPart name Assembly procedure 1 Black mark (B.M.) sub- assembly 2 Paper guide C.P-tite F screw (M2 ´ ´ ´ ´ 3) ´ 1o Install the B.M. detector sub-assembly in one of the two detector mounting holes on the paper guide, and secure it with a screw. Both the straight path and the curved path types can be installed this way. H o Tightening torque: 118 to 216 mN·m {1.2 to 2.2 kg·cm} o Make sure that the detector fits securely into the detector mounting hole on the paper guide. C.P-tite. F screw (M2 ´ 3) B.M. detector sub-assembly paper guide mounting hole
Rev. A Assembly and Disassembly 6-13 EU-T532/T542 Technical Manual Confidential Main Assembly A Installation of the Motor, paper feed, receipt, B and the Platen detector Reassembly stepPart name Assembly procedure 1 Frame assembly 2 Motor, paper feed, receipt, B C.B.S-tite (3 ´ ´ ´ ´ 5)´ 2o Align the motor, paper feed, receipt, B with the mounting position on the frame assembly and secure it with scerws. H o Tightening torque: 686 to 882 mN·m {7 to 9 kg·cm} o Make sure that the motor, paper feed, receipt, B is oriented properly . 3 Platen detector assembly C.P. (1.6 ´ ´ ´ ´ 5)´ 1o Align the platen detector assembly to the mounting position on the frame assembly, and secure it with a screw. motor, paper feed, receipt, B C.B.S-tite (3 ´ 5) frame assembly frame assembly platen detector assembly C.P. (1.6 ´ 5)
6-14 Assembly and Disassembly Rev. A Confidential Main Assembly A Reassembly stepPart name Assembly procedure H o Tightening torque: 98 to 147 mN·m o After installing the platen detector assembly, arrange the lead wires. lead wires
Rev. A Assembly and Disassembly 6-15 EU-T532/T542 Technical Manual Confidential Main Assembly B Installation of the Paper guide, straight, front and the Paper guide, straight, back unit Reassembly stepPart name Assembly procedure 1 Paper guide, straight, front (for the EU-T532) *For the EU-T542, use the Paper guide, straight, front, B. 2 Pin, guide, straight ´ 2o Insert the pin, guide, straight into the holes on the paper guide, straight, front*. 3 Paper guide, straight, back unit (for the EU-T532) C.B. (2.5 ´ 4 ´ 4 ´ 4 ´ 4 )´ 2 *For theEU-T542, use the Paper guide, straight, back, B unit.o After putting the paper guide, straight, front and the paper guide, straight, back unit* together, install them to the mounting holes on the frame assembly and secure them with screws. paper guide, straight, front pin, guide, straight C.B. (M2.5 ´ 4) frame, assembly paper guide, straight,back unit mounting holes paper guide, straight, front
6-16 Assembly and Disassembly Rev. A Confidential Main Assembly B Reassembly stepPart name Assembly procedure H o Tightening torque: 588 to 637 mN·m {6 to 6.5 kg·cm} o The dowels on the paper guide, straight, back unit fit securely into the holes on the frame assembly. o Make sure that the lead wires of the paper detector assembly are not caught between the frame assembly and the paper guide, straight, back unit. o Make sure that the wires of the paper detector assembly are passed under the hook on the paper guide, straight, back unit. hook paper guide, straight, back unit
Rev. A Assembly and Disassembly 6-17 EU-T532/T542 Technical Manual Confidential Main Assembly C Installation of the Frame, platen, straight unit Reassembly stepPart name Assembly procedure Ào Lubricate the dowel on the frame assembly with G-36. Áo Lubricate the point where the frame assembly contacts with the lock lever assembly with G-15. 3 Frame, platen, straight unito Install the frame, platen, straight unit to the frame assembly. 4 Shaft, frame, platen R.E. (1.5)´ 1o Align the holes on the frame assembly and the frame, platen, straight unit, and insert the shaft, frame, platen into these holes; then, secure it with an R.E.. 5 6Lever, platen Spring, lever, plateno Install the spring, lever, platen on the lever, platen, as shown below. frame, platen, straight unit dowel frame assembly G-36point where the frame assembly contacts with the lock lever assembly G-15 G-15 R.E (1.5) shaft, frame, platen longer edge shorter edge spring, lever, platenlever, platen