Home > Dillon Precision > Firearms > Dillon Precision SQUARE DEAL B Instruction Manual

Dillon Precision SQUARE DEAL B Instruction Manual

Here you can view all the pages of manual Dillon Precision SQUARE DEAL B Instruction Manual. The Dillon Precision manuals for Firearms are available online for free. You can easily download all the documents as PDF.

Page 1

illon
recision
Products, Inc.
Manufacturers of 
The Worlds Finest
Loading Equipment
SQUARE DEAL ‘B’
Instruction Manual
Version 4.5 

Page 2

2
Stock # Description
11628 Bullet Seater Insert
11734 Crimp Insert
*12124 Seating Stem
12864 Carbide Sizer Insert
13028 Square Deal B Manual
13328 Shellplate Bolt
13355 Return Bracket
*13427 Powder Funnel
13429 Decap Pin Nut
13433 Ejector Wire
13437 Shaft
13444 Overtravel Block Bolt
13445 Square Deal Frame
13461 Index Bolt
13479 Spent Primer Track Cover
*13504 Shellplate
13594 Spent Primer Chute
13597 Over Travel Block
13621 Primer Cup – Large
13622 Crank Pin
13624 Indexer Spring (RL1000)
13644 Smaller...

Page 3

3
Square Deal B Schematic
22200
13908
13815
13712
13721 13815
16523 (4)12124
13764 14040*13879
*20059
*13999
*1400314037 (2)
See page 5 for
more detail.
18077
13989
14037 13896
1382813822
See page 4 for
more detail.
See
page 4
for more
detail. Pre 1998 #13800 (old)
7/98 - Current #18077
13328
13504
13860
14019
13739
*14060*14060 13690
13850
20114
13847
13597
13444
13718
14013
136511359413622
14014 1379713944 13776 13705 13624 134791365913756
1397613976
1344513461
13433
13789
13355
14041
13714
13945...

Page 4

Automatic Primer System
13707
13957
13673
13864
AAA
battery
13857
20900
13964
14051
13979
13961b
13798
13621
13982
13809
13689
13754
13823
13790
13722
13967
13726
13961a
4SDB Automatic Primer System
20253 Large – 20012 Small
13621 Primer Cup – Large
13657 Primer Cup – Small
13673 Primer Magazine – Large
13689 Primer Slide Roller
13722 Primer Slide Bearing
13726 Return Spring Roll Pin
13754 Primer Slide
13757 Primer Punch – Small
13790 Primer Slide Return Pin
13798 Return Spring
13809 Roller Bolt
13823...

Page 5

5
20001 SDB Automatic Powder System
13644 Powder Measure Spacer
13691 Powder Measure Tube
*13782 Powder Funnel – Pistol
13793 Powder Measure Roller
13799 Stripper Wing Nut
13801 Tinnerman Insert
13818 Powder Bar Insert – Small
13845 Collar Sleeve
13848 Bellcrank Bushing
13853 Powder Bar Insert – Large
13865 Powder Die
13871 Bellcrank Cube
13882 Powder Measure Lid
13893 Powder Bar Post – Large
13895 Collar Clamp Screw
13904 10-32x1 1/4 SHCS Bellcrank Bolt
13921 Powder Measure Spacer Plug
13943 Powder Bar...

Page 6

Okay, It’s Here; Now What?
First of all, the Square Deal “B” is a remarkably simple
machine and a little care and thought now while you’re
setting it up will save you time and give you thousands of
trouble free rounds.
Mandatory Safety Measures
Reloading ammunition involves the use of highly
explosive primers and powder. Handling these materials is
inherently dangerous. You should recognize this danger
and take certain minimum precautions to lessen your
exposure to injury.
Never operate the machine...

Page 7

Fig. 2 – Using the machine itself as a template,
mark the three mounting holes. Allow about one
foot on both sides of your Square Deal “B” for
working room. Make sure your bench is sturdy and
does not shake, as this may disturb your powder
charge and primer system.
Fig. 3 – Drill the mounting holes and secure the
Square Deal “B” to your bench, using 1/4" bolts
(not supplied). Fig. 4 – Install the return bracket (#13355)
between the bottom of the shaft (#13437) and the
spent primer chute (#13594). The...

Page 8

Fig. 7 – Remove the cap from the top of the
powder die (#13865). The cap retains the
expander/powder funnel during shipping. 
Fig. 8 – Make sure the expander/powder funnel
is free to move in the powder die and reinsert it as
shown.Fig. 9 – With the cap removed and the
expander/powder funnel in position, you are now
ready to install the powder measure. Place the
powder measure on top of the powder die. 
Fig. 10 – The powder measure is held in place by
the powder die clamp (#13986). Tighten in place, but...

Page 9

Fig. 11 & 12 – Installation of the Powder Measure
Failsafe System.To install the failsafe rod (#16814) remove the
blue stripper wingnut (#13799), rod spring
(#14033) and washer (#18086). (Note the order of
parts.) See Fig. 11
Insert the bottom end of the rod between the
bench and the Square Deal “B” through the hole in
the return bracket (#13355). Then, using your thumb
and index finger of your right hand, move the lock-
link (#17838) down to align the hole with the slot on
the Powder Measure bellcrank...

Page 10

Now that you’ve seen the Square Deal “B”
function, read the following description of what is
happening at each station.
Understanding the Machine
Station 1:When a cartridge is fired, it expands.
The carbide resizer returns it to factory dimensions.
The primer decap pin knocks out the old primer and
deposits it into the spent primer cup. 
No adjustments are ever necessary at this station.
Station 2:As you recall, when you press forward
on the handle you will seat the primer, but that’s not
all that’s...
Start reading Dillon Precision SQUARE DEAL B Instruction Manual

Related Manuals for Dillon Precision SQUARE DEAL B Instruction Manual

All Dillon Precision manuals