Home > Daewoo > Fridge freezer > Daewoo Frs U20 Service Manual

Daewoo Frs U20 Service Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Daewoo Frs U20 Service Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 51 Daewoo manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							70
    Remarks
    ●Refrigerant is erupting rapidly from the compressor to circulate pipes, so pipe shaking noise
    can make to some degree.
    ●In case compressor vibration is sent to a pipe directly, apply vibration absorber rubbers to welding
    points of the pipe and comp. or to a much bent point on the pipe.
    Start
    Separate the touching
    pipes, if any. NY
    Apply cushion material between
    Comp. base and Tray drip. YN
    Move or change the points of
    vibration absorber rubbers on
    the pipes to reduce the shaking. YN
    Attach a absorber
    on the comp. head. NY
    Explanation to the users. 9-4-4. Pipe Noise
    Pipes are touching
    in the machine compartment ?
    Tray drip makes
    noise by Condenser shaking ?
    Pipe itself is
    shaking much ?
    Compressor itself
    is shaking much ?
     
    						
    							71
    Door switch is soaked with
    water or there is water in
    the switch ?
    PCB input is OK ?
    Start
    Change the door switch.
    NY
    Repair any disconnection
    of wires and defective
    Door switch. Y
    Connector insertion to
    Main PCB is OK ?N
    Repair the defective
    connection.
    Y
    Door switch itself is 
    OK ?N
    Change the switch.
    NY
    Check it up.
    Door switch is pushed 
    well ?
    Y
    Attach a thin pad on the
    door liner or change the
    door assembly.
    Check if interior light is ON.
    N
    9-5. Door 
    9-5-1. Door Opening Alarm Continues though the door is closed.
    Check #5,6 of CN8 (F-Door) 
    and  #4,6 of CN7 (F-Door).
    →Open : 5V, Close : 0V
     
    						
    							72
    10-1. Summary of Heavy Repair
    * Installation should be conducted in accordance with
    the standard installation procedure. (Leave space of
    more than 5 cm from the wall for compressor
    compartment cooling fan mounted model.) Transportation
    and
    installation* Copper brush, Rag, Tool box * Remove flux from the silver weld joints with soft 
    brusher wet rag. (Flux may be the cause of corrosion
    and leaks.)
    *Clean tools and store them in a clean tool box
    or in their place. Compressor
    compartment
    and tools
    arrangement* Electronic Leak Detector,
    Driver. *  Check leak at weld joints.
    Note :Do not use soapy water for check.
    * Check cooling capacity
    →Check condenser manually to see if warm.
    →Check hot pipe manually to see if warm.
    →Check frost formation on the whole surface of the
    evaporator. Check
    refrigerant leak
    and cooling
    capacity* Bombe (mass cylinder),
    refrigerant manifold gauge,
    electronic scales, punching
    off flier, gas welding machine * Weigh and control the bombe in a vacuum conditions
    with electronic scales and charge through compressor
    inlet (Process tube).
    * Charge while refrigerator operates).
    * Weld carefully after inlet pinching. Refrigerant
    charging and
    charging
    inlet welding* Vacuum pump 
    , Manifold gauge. * Evacuate for more than forty minutes after connecting
    manifold gauge hose and vacuum pump to high (drier)
    and low (compressor) pressure sides. Vacuum* Pipe Cutter, Gas welder,
    N2 gas * Confirm refrigerant (R-134a or R-600a) and oil for 
    compressor and drier.
    * Confirm N2 sealing and packing conditions before use.
    Use good one for welding and assembly.
    * Weld under nitrogen gas atmosphere.
    * Repair in a clean and dry place. Parts
    replacement
    and welding* Nipper, side cutters * Cut charging pipe ends (Comp. & Dryer) and
    discharge refrigerant from drier and compressor. Remove 
    refrigerant
    ResidualsTools Contents Process
    10. COOLING CYCLE HEAVY REPAIR
     
    						
    							73
    1) Nitrogen only should be used when cleaning inside of cycle pipes
    inside and sealing.
    2) Check leakage with an electronic leakage tester.
    3) Be sure to use a pipe cutter when cutting pipes.
    4) Be careful not the water let intrude into the inside of the cycle. Others.1) Weld under nitrogen atmosphere in order to prevent oxidation
    inside a pipe. (Nitrogen pressure : 0.1~0.2 kg/cm2.) Nitrogen blowing
    welding.1) Be sure to replace drier when repairing pipes
    and injecting refrigerant. Replacement of drier.1) Remove retained refrigerant more than 5 minutes after turning off 
    a refrigerator. (If not, oil will leak inside.)
    2) Remove retained refrigerant by cutting first high pressure side
    (drier part) with a nipper and then cut low pressure side.
    (If the order is not observed, oil leak will happen.) Removal of retained
    refrigerant.1) Use special parts and tools for R-134a or R-600a Use of tools.Precautions Items
    10-2. Precautions During Heavy Repair
    Process tubeCompressorEvaporator
    Dryer
    High Pressure side
    Low pressure
    side 
    Suction tube
    Discharge tubeCondenserHot Pipe
     
    						
    							74
    1) Remove residual refrigerant more than 5 minutes later after
    turning off the refrigerator. ( If not, compressor oil may leak inside.)
    2) Remove retained refrigerant slowly by cutting first high pressure
    side (drier part) with a nipper and then cut low pressure side. 1. Removal of residual
    refrigerant.Precautions Items
    10-3. Practical Work for Heavy Repair
    * When replacing a drier:
    Weld ①and②parts by blowing nitrogen (0.1~0.2kg/cm2) to high
    pressure side after assembling a drier.
    * When replacing a compressor:
    Weld ③and④parts by blowing nitrogen to the low pressure side.
    Note) For other parts, nitrogen blowing is not necessary because it
    does not produce oxidized scales inside pipe because of its short
    welding time. 2. Nitrogen blowing
    welding.
    ※KEYPOINTING
    Welding without nitrogen blowing produces oxidized scales inside
    a pipe, Which affect on performance and reliability of a product.
    Process tubeCompressorEvaporator
    Dryer
    High Pressure side
    Low pressure
    side 
    Suction tube
    Discharge tubeCondenserHot Pipe
    Process tubeCompressorEvaporator
    Dryer
    High Pressure side
    Low pressure
    side ①
    Condenser②
    ③ ④
    Hot Pipe
     
    						
    							75
    * Pipe Connection
    Connect a red hose to the high pressure side and a blue hose
    to the low pressure side.
    * Vacuum Sequence
    Open ①,②valves and evacuate for 40 minutes.
    Close valve ①. 3.Vacuum degassing.Precautions Items
    * Charging sequence
    1) Check the amount of refrigerant supplied to each model after
    completing vacuum degassing.
    2) Evacuate bombe with a vacuum pump.
    3) Measure the amount of refrigerant charged.
    - Measure the weight of an evacuated bombe with an electronic scale.
    - Charge refrigerant into a bombe and measure the weight. Calculate
    the weight of refrigerant charged into the bombe by subtracting the
    weight of an evacuated bombe. 4.Refrigerant charging.
    CompressorEvaporator
    Dryer Condenser
    Vaccum
    PumpHot Pipe
    Blue
    Yellow
    Red High
    Pressure Low
    Pressure
    ①
    ②
    ※KEYPOINTING
    1) If power is applied during vacuum degassing, vacuum degassing
    shall be more effective.
    2) Operate compressor while charging refrigerant. (It is easier and
    more certain to do like this.)
    the amount of refrigerant charged
    = a weight after charging 
    - a weight before charging
    (a weight of an evacuated cylinder)
    Calculation of amount of refrigerant charged ※KEYPOINTING
    1) Be sure to charge
    the refrigerant at
    around 25°C.
    2) Be sure to keep
    -5g in the winter
    and +5g in summer.
    Indicate the weight of
    an evacuated bombe
     
    						
    							76
    Precautions Items
    4) Refrigerant Charging
    Charge refrigerant while operating a compressor as shown above.
    5) Pinch a charging pipe with a pinch-off plier after completion of charging.
    6) Braze the end of a pinched charging pipe with copper brazer and take
    a gas leakage test on the welded parts. 4.Refrigerant charging.
    BombeCompressorEvaporator
    CondenserDryer Hot Pipe
    * Take a leakage test on the welded or suspicious area with an
    electronic leakage tester. 5. Gas-leakage test
    * Check each pipe is placed in its original place before closing
    a cover back-M/C after completion of work. 6. Pipe arrangement
    in each cycle
    10-4. Standard Regulations for Heavy Repair
    1) Observe the safety precautions for gas handling.
    2) Use JIG (or wet towel) in order to prevent electric wires from burning during welding.
    (In order to prevent insulation break and accident.)
    3) The inner case shall be melted and insulation material (polyurethane) shall be burnt 
    if not cared during welding inner case parts.
    4) The copper pipe shall be oxidized by overheating if not cared during welding.
    5) Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)
    6) Make sure that the inner diameter should not be distorted while cutting a capillary tube.
    7) Be sure that a suction pipe and a filling tube should not be substituted each other during welding.
    ( High efficiency pump.)
     
    						
    							77
    10-5. Brazing Reference Drawings.
    ▶Welding Point
    ●
    ■Copper Welding (Ag 5%)7 Points
    3 Points Silver Welding (Ag 35%)
    Hot Pipe
    F
    REvaporator
    CondenserI-Pipe
    Accumulator
    Suction Pipe
    Dryer
    Capi-Tube
    Pipe Suc Conn
    Pipe Conn B
    Compressor
    ▶Flow of Refrigeration Cycle
    Compressor
    Pipe Conn. BWire-Con. Pipe
    Hot PipeDryer
    Capillary Tube
    EvaporatorAccumulator
    Pipe Suction Conn
    Suction Pipe
    HighLow
     
    						
    							78
    11-1. Installation Preparation
    11. INSTALLATION GUIDE
    Check if the refrigerator can pass
    a doorway or enter a door first. 
    Dimensions( including Door Handles)
    (Width*Depth*Height)     
    903mm X 734.5mm X 1790mm
    Find a suitable place to install
    Sufficient space from refrigerator back to the
    ※wall for free air ventilation※Avoid direct sunlight.
    Once the installation place is ready follow the installation instructions.
    If surround temperature of refrigerator is low (below 10℃)), 
    foods can be frozen or the refrigerator can work in abnormal way.
     
    						
    							79
    11-2. If the refrigerator can not enter the door
    Removing Freezer Door 
    1
    ※Remove front bottom cover first, if it is attached.
    Remove front bottom cover first,
    Pull out the left collar of the 
    coupling first, then hold the 
    coupling and pull out the left 
    water tube.2Unscrew top hinge cover with a
    screw driver.
    Remove the hinge cover.3Turn top hinge bolt
    counterclockwise . 
    Disconnect the harness wires.
    4Lift up the front of hinge to remove. 
    ( After the hinge is removed the
    door can fall down forward.
    Be careful !)5Be careful not to damage the
    water line when removing the
    door.
    Removing Refrigerator Door 
    1Unscrew top hinge cover with a
    screw driver.
    Remove the hinge cover.2Turn top hinge fastener
    counterclockwise. 
    Disconnect harness wires.3Lift up the front of hinge to remove.
    (After the hinge is removed the
    door can fall down forward.
    Be careful !)
    4Lift the door straight up to remove.
     
    						
    All Daewoo manuals Comments (0)

    Related Manuals for Daewoo Frs U20 Service Manual