Home > Casio > Data Terminal > Casio Qt2100 User Manual

Casio Qt2100 User Manual

    Download as PDF Print this page Share this page

    Have a look at the manual Casio Qt2100 User Manual online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 338 Casio manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							QT-2100
    Versatile Intelligent Terminal
    ———————————————————————
    Installation &
    Down Recovery Manual
    Version 1.0 February 2002
    c
    C
    7
    4
    1
    0
    8
    5
    2
    009
    6
    3
    •
    QT-2100 
    						
    							Contents
    I-2
    This manual is intended for use as a reference to the QT-2100 system. It provides details to
    install systems and down recovery. This manual does not describe actual programming,
    which is covered in the QT-2100 programming manual.
    This manual consists of the following chapters:
    1. System installation
    This chapter show the procedure of installing QT-2100 systems.
    2. System down and recovery
    This chapter explains actions to take and recovery methods when the system goes down.
    Note: Casio reserves the right to change equipment and specifications without obligation and
    notification. The terms used in this manual may be different from those used in other
    manuals of Casio’s products.
    Printing history
    Manual version Software version
    Version 1.0: February, 2002 First Edition: February, 2002 Version 1.0
    Revised points 
    						
    							I-3QT-2100 Installation & Down Recovery Manual 
    						
    							I-5QT-2100 Installation & Down Recovery Manual
    1. System installation ........................................................................................ I-6
    1-1. How to load IPL (Initial Program Loading) .................................................................. I-6
    1-1-1. From PC to QT-2100 terminal via RS-232C ..................................................... I-6
    1-1-2. From one QT-2100 to QT-2100 terminals via inline ......................................... I-7
    1-1-3. From CF card to QT-2100 terminal .................................................................. I-7
    1-2. How to install QT-2100 system ................................................................................... I-8
    1-2-1. QT-2100 stand alone system (with printer) ...................................................... I-8
    1-2-2. QT-2100 master/satellite system (with local printer) ........................................ I-8
    1-2-3. QT-2100 master/satellite system (with remote printer) ..................................... I-9
    1-2-4. Printer DIP switch configuration ..................................................................... I-10
    2. System down and recovery ........................................................................ I-11
    2-1. Measures to prevent trouble ..................................................................................... I-12
    2-2. Master terminal failure .............................................................................................. I-13
    2-2-1. Check tracking master terminal failure ........................................................... I-13
    2-2-1-1. Detection of check tracking master terminal failure ........................................ I-13
    2-2-1-2. Master failure during check tracking operation ............................................... I-14
    2-2-2. Remote printer failure ..................................................................................... I-15
    2-2-2-1. Detection of remote printer failure .................................................................. I-15
    2-2-2-2. Master printer failure during printing on remote printer .................................. I-15
    2-3. Recovery processing ................................................................................................ I-16
    2-3-1. Master/backup master down detection ........................................................... I-16
    2-3-2. When both master and backup master go down ............................................ I-16
    2-4. Master failure during X/Z collection/consolidation or terminal data transfer ............. I-16
    2-5. Satellite terminal down .............................................................................................. I-16 
    						
    							I-6
    System Installation
    1. System installation
    In this chapter shows how to install QT-2100 systems and peripherals.
    1-1. How to load IPL (Initial Program Loading)
    Normally, IPL is not necessary since QT-2100 has efficient program options to meet your
    circumstances.
    In some cases, you need to change the application program to meet your requirements, the
    IPL is necessary to download the application program to QT-2100.
    To load IPL, there are three methods:
    1) From PC to QT-2100 terminal via RS-232C
    2) From one QT-2100 terminal (master) to QT-2100 terminals (satellite) via inline
    3) From CF card to QT-2100 terminal
    1-1-1. From PC to QT-2100 terminal via RS-232C
    1. Set up the system (refer to the left figure).
    2. Initialize the target QT-2100 to receive the IPL data (refer to
    the Machine initialization section of the Manager operation
    chapter of QT-2100 Reference manual page 95).
    3. Run the loading program of PC.
    4. After IPL completion, continue to the initialize operation.
    QT2100
    PC
    IPL source
    IPL target
    COM 1
    COM
    port
    IPL Data 
    						
    							I-7QT-2100 Installation & Down Recovery Manual
    1-1-2. From one QT-2100 to QT-2100 terminals via inline
    1. Set up the system (refer to the left figure).
    2. Initialize the target QT-2100 to receive the IPL data (refer to
    the Machine initialization section of the Manager operation
    chapter of QT-2100 Reference manual page 95.)
    3. Execute IPL data sending operation (refer to the Auto-program
    operation section of the Manager operation chapter of QT-
    2100 Reference manual page 125.)
    4. After IPL completion, continue to the initialize operation.
    IPL source
    IPL Data
    In-line
    QT2100
    QT2100
    IPL targetIn-line (CASIO original cable or CAT5 cable)
    QT2100QT2100QT2100
    1-1-3. From CF card to QT-2100 terminal
    1. Insert the CF card to the CF card slot of the target terminal.
    2. Initialize the target QT-2100 to receive the IPL data (refer to
    the Machine initialization section of the Manager operation
    chapter of QT-2100 Reference manual page 95.)
    3. Execute IPL data receiving operation (refer to the Machine
    initialization section of the Manager operation chapter of QT-
    2100 Reference manual page 125.)
    4. After IPL completion, continue to the initialize operation.
    QT2100
    CF card 
    						
    							I-8
    System Installation
    1-2. How to install QT-2100 system
    1-2-1. QT-2100 stand alone system (with printer)
    1. Set up the system (refer to the left figure).
    2. Initialize the QT-2100 (refer to the Initialization chapter of
    QT-2100 Programming manual page 8.)
    Note 1:
    If the QT-2100 cannot recognize the printer(s) correctly,
    check the dip switches on the printer or printer cable and
    try initialization operation again. Casio printer cable (PRT-
    CB-8A/-8B) is required for proper recognition of the local
    printer.
    Note 2:
    If the Slip printer is connected to COM 4, 5, or 6 port,
    automatic printer detection during initialization is not
    made. In this case, program the I/O parameter file manu-
    ally and flag clear the machine.
    3. Complete the initialize operation.
    1-2-2. QT-2100 master/satellite system (with local printer)
    1. Set up the system (refer to the figure below).
    2. Initialize the master QT-2100 (refer to the Initialization chap-
    ter of QT-2100 Programming manual page 8.)
    Note 1:
    1. Do not turn on other QT-2100.
    2. If the QT-2100 cannot recognize the local printer(s) cor-
    rectly, check the dip switches on the printer or printer
    cable and try initialization operation again. Casio printer
    cable (PRT-CB-8A/-8B) is required for proper recognition
    of the local printer.
    Note 2:
    If the Slip printer is connected to COM 4, 5, or 6 port,
    automatic printer detection during initialization is not
    made. In this case, program the I/O parameter file manu-
    ally and flag clear the machine.
    QT2100
    R/J
    Slip
    In-line (CASIO original cable/CAT5 TUP cable)
    QT2100QT2100QT2100
    R/JR/JR/JR/JR/JR/J
    PRN (1)... PRN (3)
    PRN (1)...PRN (3) PRN (1)...PRN (3) PRN (1)
    QT2100
    R/J
    Slip
    R/J
    PRN (1)...PRN (3) 
    						
    							I-9QT-2100 Installation & Down Recovery Manual
    3. Initialize QT-2100 terminals one by one.
    Note:
    When you want to copy master program to satellites,
    complete the master program, and then initialize the satel-
    lite and receive the master program during initialization
    procedure of satellites.
    1-2-3. QT-2100 master/satellite system (with remote printer)
    1. Set up the system (refer to the figure below).
    2. Initialize the master QT-2100 (refer to the Initialization chap-
    ter of QT-2100 Programming manual page 8.)
    Note 1:
    1. Do not turn on other QT-2100.
    2. If the QT-2100 cannot recognize the local printer(s) cor-
    rectly, check the dip switches on the printer or printer
    cable and try initialization operation again. Casio printer
    cable (PRT-CB-8A/-8B) is required for proper recognition
    of the local printer.
    Note 2:
    If the Slip printer is connected to COM 4, 5, or 6 port,
    automatic printer detection during initialization is not
    made. In this case, program the I/O parameter file manu-
    ally and flag clear the machine.
    3. Initialize QT-2100 terminals one by one.
    Note:
    When you want to copy master program to satellites,
    complete the master program first, and then initialize the
    satellites and receive the master program at the end of
    initialization procedure of satellites.
    4. Declare remote printer by programming the printer connection
    table to all terminals in the system (refer to the Programming
    printer connection section in the Program 3 chapter of the
    Programming manual page 70.)
    QT2000
    R/J
    SlipSlipSlip
    In-line
    QT2000QT2000QT2000
    RP
    RP
    RP
    R/J
    PRN (1)...PRN (3)PRN (1)...PRN (3) 
    						
    							I-10
    System Installation
    SW No. Function
    Data reception error
    Receive buffer capacity
    Handshaking
    Data word length
    Parity check
    Parity selection
    Transmision speed
    ON OFF
    Ignored Prints ?
    45 bytes 4k bytes
    XON/XOFF DTR/DSR
    7 bits 8 bits
    Ye s N o
    Even Odd
    See transmission 
    speed setting
    Density setting
    Light
    DarkSW No.
    3
    ON
    OFF
    ON
    OFF4
    ON
    OFF
    OFF
    ON
    UP-350 Bottom view
    DSW1DSW2
    1
    2
    3
    4
    5
    6
    7
    8
    1
    SW No. Function
    Busy condition
    Reserved
    Print density
    Reserved
    Reserved
    I/F 6 pin reset signal
    I/F 25 pin reset signal
    ON OFF
    Buffer fullBuffer full
    or Offline
    Fixed
    See density setting
    Fixed
    Fixed
    Enabled Disabled
    Enabled Disabled1
    2
    3
    4
    5
    6
    7
    8
    2
    Transmission
    speed setting
    bps
    2400
    4800
    9600
    19200SW No.
    7
    ON
    OFF
    ON
    OFF8
    ON
    ON
    OFF
    OFF
    SW No. Function
    Data word length
    Parity check
    Parity type
    Data tranfer rate
    Connection of
    customer display
    Data reception error
    Hand shake
    ON OFF
    7 bit 8 bit
    Ye s N o
    Even Odd
    See data transfer
    rate setting
    ConnectedNot
    connected
    Ignored Print ?
    XON/XOFF DTR/DSR
    SA-3015 Bottom view
    DSW1
    DSW2
    1
    2
    3
    4
    5
    6
    7
    8
    1
    SW No. Function
    Automatic CR
    Reception buffer size
    Font selection
    Carriage speed
    Busy condition
    Internal use
    I/F 6 pin reset signal
    I/F 25 pin reset signal
    ON OFF
    Always Yes Always  No
    32 bytes 2048 bytes
    9 x 9 7 x 9
    Low High
    Buffer fullBuffer full
    or Offline
    Fixed
    Enabled Disabled
    Enabled Disabled1
    2
    3
    4
    5
    6
    7
    8
    2
    Data tranfer
    rate setting
    bps
    1200
    2400
    4800
    9600SW No.
    4
    ON
    OFF
    ON
    OFF5
    ON
    ON
    OFF
    OFF
    1-2-4. Printer DIP switch configuration
    UP-350
    SA-3015
    SW No. Function
    Data reception error
    Receive buffer capacity
    Handshaking
    Data word length
    Parity check
    Parity selection
    Baud rate
    Busy condition
    ON OFF
    Ignored Prints ?
    40 bytes 1k byte
    XON/XOFF DTR/DSR
    7 bits 8 bits
    Ye s N o
    Even Odd
    4800 bps 9600 bps
    Buffer fullBuffer full
    or Offline1
    2
    3
    4
    5
    6
    7
    8
    1
    SW No. Function
    No. of digits
    (7x9 font / 9x9 font)
    Internal use
    #6 pin reset signal
    #25 pin reset signal
    ON OFF
    42 / 35 40 / 33
    digits digits
      
    Enabled Disabled
    Enabled Disabled1
    2
    3
    4
    2
    UP-250
    Dip switch is located at the bottom of the printer. 
    						
    All Casio manuals Comments (0)

    Related Manuals for Casio Qt2100 User Manual