Aimco Brakes Screwdriver TM45 65 Quick Start Guide
Have a look at the manual Aimco Brakes Screwdriver TM45 65 Quick Start Guide online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 85 Aimco Brakes manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.
Quick Start for TM-45 and TM-65 Fastener Counter PO Box 16460, Portland, OR 97292-0460 503-2 54-6600 Fax 503-255-26 15 1. Attach black power cord to rear of Electra TM box. 2. Plug into 110VAC power. 3. Plug WORK I/P Plug (p lastic stem with connector) into “Work I/P” receptacle on back of Electra TM sy stem. 4. O n front of TM box, attach Electra Screwdriver power cord into receptacle on lower-right side. 5. Turn power on to TM system (will also power Electra Screwdriver). 6. Press “Set” button on front of the Electra TM system. 7. Password will be requested. Press keys in this combination “+ + - - SET DETECTOR”. 8. Press “SET” three (3) times . 9. On screen 3-1.SAMPLE TIMES , use “+” or “-” keys to scroll up or down to desired number of sample r uns that will be used to set up the system. The larger the number, the more accurate the sampling will be and the ti ghter the tolerance on the box can be set. Twelve (12) is a good place to start. Press “SET” when the desired nu mber i s on the scree n. On screen 3-2.SAMPLES , it will display 0/xx with ‘xx’ being the number of samples from th e previous screen. Be gin t he sample gathering by running the Electra Screwdriver exactly as the operator will on a production quality application. At the end of each rundown, the Electra TM system will request an entry of the “+” key if the sample ran as expected with no known problems or an entry of the “-” key if the sample run had an operator error or some other difficulty. Repeat this process until ‘xx’ number of good samples has been recorded based on ‘xx’ being the number of samples desired (xx/xx). Hit “SET” to complete. 10. On screen 4-1.RANGE RATE , use the “+” or “-” keys to adjust the value to the + tolerance of the assembly task. Be sure to take the application dynamics into account as the material variances will contribute to how accurate the assembly job can be performed. A good strategy is to start at +10% and then adjust as the product quality sampling dictates. Hit “SET” to complete. 11. On screen 4-2.RANGE RATE , use the “+” or “-” keys to adjust the value to the - tolerance of the ass embly task. Be sure to take the application dynamics into account as the material variances will contribute to how accurate the assembly job can be performed. A good strategy is to start at +10% and then adjust as the product quality sampling dictates. Hit “SET” to complete. 12. On screen 5.PCS/UNIT, use the “+” or “-” to select how many screws per work piece are to be monitored. If the operator is installing four (4) screws into a phone, for example, then this screen shoul d be set at four (4). The unit will then count how many good phones pass through the station. Hit “SET” to complete. 13. Press “DETECTOR” and the system will be ready to run and monitor fastening. 14. For a dditional options and detailed descriptions of each menu screen, please see the Electra T M Instruction Sheet packaged with the Electra TM system. LIT-MAN820 Rev. 03/2016 Printed in USA ©2 016 AIMCO www.aimco-global.com