Aimco Brakes AcraDyne Gen 3 Tubenut Runner Manual
Here you can view all the pages of manual Aimco Brakes AcraDyne Gen 3 Tubenut Runner Manual. The Aimco Brakes manuals for AcraDyne are available online for free. You can easily download all the documents as PDF.
Page 2
INTRODUCTION SAVE THESE INSTRUCTIONS 1) WORK AREA a) Keep work area clean and well lit. Cluttered and dark areas invite accidents. b) Do not operate power tools in explosive atmospheres, such as the presence of flammable liquids, gases or dust. Power tools create sparks which may ignite the dust or fumes. c) Keep children and bystanders away while operating a power tool. Distractions can cause you to lose control. 2) ELECTRICAL SAFETY a) Power tool plugs must match the outlet. Never...
Page 3
OPERATIONS Tool Body Start LeverCable Connection 3 Multi Function Button 1. Connect tool cable to the iEC controller and the tool: The tool cable has curved alignment tabs and slots built into the connectors at each end to ensure proper alignment and connection with the tool and controller. Make sure that power is not turned on at the controller before making any connections. Align the female connec- tor on the cable with the male connector on the tool and insert the cable onto the tool, then...
Page 4
PAGE HEADER HEREGEN III 2000 SERIES TUBENUT RUNNERS ITEM # AET AET AET AET QTY. PART # DESCRIPTION 32020A 32025A 32035A 32050A 1 X X X X 1 25064 MOTOR HOUSING 2 X X X X 1 25425 MOTOR ASM., 5:1, 2000 SERIES GEN III 3 X X X X 1 25063 LED BOARD ASM. 4 X X X X 2 25075 SCREW, SHC 4-40X.375, STEEL, BLACK OXIDE 5 X X X X 2 25429 STAND-OFF, LED, 2000 SERIES 6 X X X X 1 25073 SCREW, SET 4-40X.375, STEEL, BLACK OXIDE 7 X X X X 1 24254 SPACER,...
Page 5
SPECIFICATIONS Environmental Operating Temperature: 0°C to 32°C Storage Temperature: 0°C to 65°C Humidity: o 5% to 90% RH, Non-Condensing, for temperatures 0°C to 40°C o 5% to 60% RH, Non-Condensing, for temperatures 0°C to 65°C Maximum Altitude of Operation: 3000m Maximum decibel level: 73 dB(A) Electrical Motor Type: BLDC o Motor Phase Voltage: 160 Volts Pulse DC @ Controller Supply Voltage of 120 RMS, or 320 Volts Pulse DC @ Controller Supply...
Page 6
6 OVERVIEW The following describes the setup required for tube-nut tool operation. This includes determining the values for tube-nut spe- ci c TID parameters (parameters residing in the tool memory) and iEC Controller parameters. TUBE NUT HOMING T UBE NUT HOME TID PARAMETERS The tube nut TID parameters can be viewed and modi ed from the Tool-> Edit->Tool Setup screen in ToolWare. The tool to be con gured must be connected to the controller. Home Detection Torque - Home (in*Lb) When the tool is...
Page 7
7 Tube Nut Homing Reverse Dwell Time: - The amount of time before the output is allowed to home, after the rundown is complete and the tool lever is re- leased. - Units: Seconds - Default value: 0.5 Seconds - Range: 0 to 2 Seconds Tube Nut Home Dwell time: - The amount of time the tool holds at home to prevent bounce back - Too short of home dwell time can increase the occurrence of bounce back. However, decreasing the homing speed can decrease the severity of bounce back after...
Page 8
TUBE NUT PINCH DETECTION T UBE NUT HOME TID PARAMETERS The tube nut TID parameters can be viewed and modi ed from the Tool-> Edit->Tool Setup screen in ToolWare. The tool to be con gured must be connected to the controller. Obstruction Detection Torque - (in*Lb) - At the start of rundown before the output rotation has passed though the Obstruction Check Zone (where the output is open at the start of the fasting cycle), the tool will stop and fastening cycle will be aborted if this torque...
Page 9
- Units: RPM of the tool output - Default: 90 RPM - Range: 1 to 200 RPM - Obstruction Check Acceleration Limit - Rate at which the speed of the tool ramps to Obstruction Check Speed. - Units: kRPM/second - Default value: 0.5 - Range: 0.1 to 10 T UBE NUT HOMING START INPUT LOGIC SELECTION: The controller parameters for tube- operation can be viewed and modi ed from the Controller->Edit Controller Parameter- >Tube Nut screen in ToolWare. Tube nut Home Strategy: - Lever action required...