Home > Acer > Notebook > Acer Travelmate 7220 Service Guide

Acer Travelmate 7220 Service Guide

    Download as PDF Print this page Share this page

    Have a look at the manual Acer Travelmate 7220 Service Guide online for free. It’s possible to download the document as PDF or print. UserManuals.tech offer 720 Acer manuals and user’s guides for free. Share the user manual or guide on Facebook, Twitter or Google+.

    							Chapter 373
    Main Unit Disassembly Process
    Main Unit Disassembly Flowchart
    Removing the Modem Board 
    1.See “Removing the Battery Pack” on page 62.
    2.See “Removing the Lower Cover” on page 64. Screw List
    ScrewPart No.
    A M2.5 x L6 86.00E33.736
    C M2 x L4 86.9A552.4R0
    D M2.5 x L5 86.00E74.335
    H M2.5 x L8 86.00E34.738
    J M2 x L4 86.00F24.724
    MAIN UNIT
    KEYBOARD
    MAIN
    BOARD Cx4
    MAIN UNIT DISASSEMBLY
    MIDDLE
    COVER
    LCD MODULE
    Hx2 Ax 2
    UPPER CASE
    Ax 20
    LEFT AND RIGHT
    SPEAKER MODULE
    Cx4
    MODEM
    BOARD Cx2 Cx2
    CPU/VGA
    THERMAL MODULE
    CPU
    TOUCH PAD BRACKET
    ASSEMBLY
    Cx4
    TOUCH PAD
    BRACKET
    LAUNCH BOARD
    Jx1 HEAT SINK FAN
    USB BOARD
    C x9 (Cx5 for UMA module)
    VGA
    BOARD
    POWER
    BOARD
    Cx 1
    Dx2
    TOUCH PAD
    BOARDFINGERPRINT
    BOARD
    Cx1
    ODD BOARD 
    						
    							74Chapter 3
    3.See “Removing the DIMM” on page 68.
    4.See “Removing the WLAN Board Modules” on page 68.
    5.Remove the 2 screws (C) securing the modem card. 
    6.Lift partially to detach the modem board from the main board. 
    NOTE: The modem cable is still attached to the modem board.
    7.Disconnect the modem cable from the modem board. 
    Removing the Heatsink Fan Module
    1.See “Removing the Battery Pack” on page 62.
    2.See “Removing the Lower Cover” on page 64.
    StepSize (Quantity)ColorTo r q u e
    1~2 M2 x L4 (2) Silver 1.8 kgf-cm 
    						
    							Chapter 375
    3.Disconnect the heatsink fan connector from FAN1 on the main board. 
    4.Remove the two screws (C) securing the heatsink fan module.   
    5.Remove the heatsink fan module from the main board. 
    Removing the CPU and VGA Heatsink Module
    1.See “Removing the Battery Pack” on page 62.
    2.See “Removing the Lower Cover” on page 64.
    StepSize (Quantity)ColorTo r q u e
    1~2 M2 x L4 (2) Silver 1.6 kgf-cm 
    						
    							76Chapter 3
    3.Remove the nine screws (C) securing the CPU and VGA heatsink module in place.   
    4.Slide out and remove the heatsink module. 
    Removing the CPU 
    1.See “Removing the Battery Pack” on page 62..
    2.See “Removing the Lower Cover” on page 64..
    3.See “Removing the Heatsink Fan Module” on page 74.
    4.See “Removing the CPU and VGA Heatsink Module” on page 75.
    StepSize (Quantity)ColorTo r q u e
    1~9 M2 x L4 (9) Silver 3.0 kgf-cm 
    						
    							Chapter 377
    5.Using a flat screwdriver, turn the CPU socket latch counter-clockwise to release the CPU, then remove 
    the CPU. 
    NOTE: When installing the CPU, make sure to install the CPU with PIN 1 at the corner as shown. 
    Removing the VGA board (for Discrete model only)
    1.See “Removing the Battery Pack” on page 62.
    2.See “Removing the Lower Cover” on page 64.
    3.See “Removing the Heatsink Fan Module” on page 74.
    4.See “Removing the CPU and VGA Heatsink Module” on page 75.
    5.Remove the two screws (D) securing the VGA board.  
    StepSize (Quantity)ColorTo r q u e
    1~2 M2.5 x L5 (2) Silver 1.6 kgf-cm 
    						
    							78Chapter 3
    6.Carefully remove the VGA board from the main board. 
    Removing the Middle Cover and the Power Board
    1.See “Removing the Battery Pack” on page 62.
    2.Open the LCD screen all the way to facilitate the easy removal of the middle cover. 
    3.To remove the Middle Cover, carefully insert the plastic flat screwdriver under the side of the middle cover 
    and gently pry up the middle cover. Continue prying on the other side until you could detach the Middle 
    Cover.  
    4.Detach the cover and turn it over on the keyboard.   
    						
    							Chapter 379
    5.Disconnect the Power board cable from the main board and disconnect the Power board cable. 
    6.Remove the one screw (C) securing the Power board to the middle cover, and remove the Power board 
    from the middle cover.   
    Removing the Keyboard
    1.See “Removing the Battery Pack” on page 62..
    2.See “Removing the Middle Cover and the Power Board” on page 78.
    StepSize (Quantity)ColorTo r q u e
    1 M2 x L4 (1) Silver 1.6 kgf-cm 
    						
    							80Chapter 3
    3.Release the top latches securing the keyboard in place.
    4.Carefully pry the keyboard out of the side latches and slide it out; then turn it over on the touchpad area.  
    5.Disconnect the keyboard cable from the main board to remove the keyboard.    
    						
    							Chapter 381
    Removing the LCD Module
    1.See “Removing the Battery Pack” on page 62.
    2.See “Removing the Lower Cover” on page 64.
    3.See “Removing the WLAN Board Modules” on page 68.
    4.See “Removing the Middle Cover and the Power Board” on page 78.
    5.See “Removing the Keyboard” on page 79.
    6.Remove the acetic tape and disconnect the LCD coaxial cable from the LCD1 connector on the main 
    board.   
    7.Remove the internal microphone cable from the INTMIC1 connector on the main board and release the 
    cables from the latches.   
    						
    							82Chapter 3
    8.Release the wireless LAN antenna cables from the hole and latches as shown.  
    9.Remove the two screws (A) from the base of the unit. 
    10.Remove the two screws (H) from the left and right hinge of the LCD module. 
    StepSize (Quantity)ColorTo r q u e
    1~2 M2.5 x L6 (2) Black 4.0 kgf-cm
    StepSize (Quantity)ColorTo r q u e
    1~2 M2.5 x L8 (2) Black 4.0 kgf-cm 
    						
    All Acer manuals Comments (0)

    Related Manuals for Acer Travelmate 7220 Service Guide