Home > Panasonic > Communications System > Panasonic Cpc+AII/B Digital Business System Release Notes Manual

Panasonic Cpc+AII/B Digital Business System Release Notes Manual

Here you can view all the pages of manual Panasonic Cpc+AII/B Digital Business System Release Notes Manual. The Panasonic manuals for Communications System are available online for free. You can easily download all the documents as PDF.

Page 111

Chaoter 3. Cabinet Installation
Section 300~Installation
Installation
F,
1.With the lettering on the card pointed up, position the card within the slot
guides. (See Figure 3-7.)
2.Hold the card on the top and bottom edges with both hands and carefully
push the card into the slot.
3.When the connector at the far end of the card touches the corresponding
connector on the backplane, press the card in until it is firmly 
seated.
rre 3-7. Printed circuit card installation
Zard-
.abel
* The extension card...

Page 112

Section 3004nstallationChapter 3. Cabinet Installation
Battery-
Guidelines
lThe DBS 40 uses two 12-volt batteries; the DBS 72 and 96 use four 6-volt
batteries or two 12-volt batteries. The following table includes the part
numbers for the battery packages.
Table 3-I.Battery backup packages for the DBS 40, 72, and 96SystemBattery Backup Part No.
DBS 40VB-43130 (some systems may be
equipped with VB-2450A-2P)
DBS 72 and 96
VB-43 130 (some systems may be
equipped with VB-2650-2P)
lThe backup batteries are...

Page 113

Chapter 3. Cabinet Installation
Section 300~Installation
Installation for the DBS 40
1.Place one battery in the top tray of the battery compartment, the other
battery in the bottom tray.
Fi,
location. DBS 40Batteries
2.Connect the positive cable (red) to the + terminal of the top battery.
3.Connect the connecting cable (white) to the - terminal of the top battery.
4.Connect the negative cable (blue) to the - terminal of the bottom battery.
5.Connect the connecting cable (white) from the top battery to...

Page 114

Section 300~lnstaaationmamer 3. C;atmet lnstallatlon
Installation for the DBS 72 and 96
1.Slide the battery compartment out and place the batteries inside the tray.
Figure3-9.
Remove Screwsand Slide Battery
Tray Out
2.Connect the positive cable (red) to the + terminal on the fist battery.
3.Connect the negative cable (blue) to the - terminal on the last battery.
4.Connect the remaining positive and negative terminals with the white
connection cables, as shown in Figure 3-10.
DBS-70-300DBS Manual - Issued...

Page 115

Chapter 3. Cabinet lnStah3tiOnSection 3004nstallation
Figi3-10. Battery pack connection, DBS 72 and 96
RedConnection Cable
Front Negative
Four G-Volt Batteries
(Older Version)
VB-265012PWhite
Connection
Cables
- Red Connection Cable
\*cBack Positive
Front Negative
‘Fwo 1 O-Volt Batteries
(Newer Version)
VB-43130
3-12Dl3S Manual - Issued 8/l/95cm-70-300 

Page 116

3emon yuu-lnsraiiatlon
Key Phone Wall Mounting
Gnapter 3. Cabinet Installation
DBS key phones can be modified for wall mounting by reversing the wall-
mount adaptor on the bottom of the phone. The wall-mount adaptor includes a
small hole for attaching the phone to a screw inserted in the wall.
1.Place the bottom edge of the telephone on a desk or other hard surface.
2.Press the wall-mount adaptor down until it detaches from the phone
(Figure 3- 11).Figure 
3-11.UdflDtO?’removal
Wall-Mount
Adaptor...

Page 117

Chapter 3. Cabinet InstallationSection 300~Installation
Figure 3-12.Wall-mount adaptor replacement
igure 3-13.
Handset
Guide
3.Turn the wall-mount adaptor around and re-attach it to the phone..
LI.Remove the handset guide with a small screwdriver, turn it over, and
reinsert it into the phone.
t guide insertion for wal
7-m-r
n3znting, key phor
I13-l 4
DES Manual 
- Issued 8/l/95DBS-70-300 

Page 118

Section 3004nstallationChapter 3. Cabinet Installation
DSLT Wall Mounting
-
Digital Single-Line Telephones (DSLTs) can be modified for wall mounting
by removing the desk stand and mounting it on the bottom of the phone. The
back of the DSLT and the desk stand include slots for attaching the phone to a
screw inserted in the wall.
1.Press the stand releases in toward the middle of the phone to release the
desk stand (Figure 3- 14).
Figure 3-14. Desk stand removal for DSLT wallmountinpDBS-70-300
DBS Manual...

Page 119

Chapter 3. Cabinet InstallationSection 300~Installation
2.Attach the desk stand to the bottom of the phone by aligning the tabs and
tab guides and sliding it into place (Figure 3-15).
Figure 3-15. Desk stand attachment for DSLT wail mounting
I
.
3.Remove the handset guide with a small screwdriver, turn it over, and
reinsert it into the phone,
Figure 3-16. Handset guide insertian for waU-n
i
Handset
Guide
unting, DSLT
3-16DBS Manual - Issued 6/l/95DBS-70-300 

Page 120

Section 300~InstallationChapter 3. Cabinet Installation
System Initialization
1.Confirm that the DBS power switch is OFF.
2.Plug the power cord into a dedicated 120V 15 amp AC wall outlet.
Note: A surge protector should be installed on the power cord.
3.Set SW1 on the CPC card to RAMCLR (RAM Clear).
‘igure 3-17. CPC memory clear switch
4.Turn the power switch on.
As the system loads, the bottom LED lamp on the CPC card will flash.
.
5.Once the bottom LED lamp on the CPC card stops flashing, set SW 1 on...
Start reading Panasonic Cpc+AII/B Digital Business System Release Notes Manual

Related Manuals for Panasonic Cpc+AII/B Digital Business System Release Notes Manual

All Panasonic manuals