GE Logiq P5 Service Manual
Here you can view all the pages of manual GE Logiq P5 Service Manual. The GE manuals for Medical Equipment are available online for free. You can easily download all the documents as PDF.
Page 131
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL Section 4-9 - Board Function Checks 4 - 45 4-9-3 Probe Assessment Diagnostic Test Validation Procedure NOTE: This diagnostic test does not repr esent the result as Passed or Failed. 1.) Clean probe surface that you want to assess and connect the probe to the 1st probe slot of the system. 2.) Turn on the system and check the completion of Echoloader loading. 3.) Do the Service Login. 4.) Select Diagnostics => LOGIQ P5 Diagnostics =>...
Page 132
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 4 - 46 Section 4-9 - Board Function Checks 4-9-3 Probe Assessment Diagnosti c Test Validation Procedure (cont’d) 7.) If the test is executed without probe con nection, the test shows the following result. 8.) After finishing the test, shut down the system. Figure 4-45 Probe Assessment Diagnostic Test
Page 133
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL Section 4-9 - Board Function Checks 4 - 47 4-9-4 SYSCONML Assy Function Validation Procedure 4-9-4-1 L1SYSCON diagnostic Test 1.) Turn on the system and check the completion of echoloader loading. 2.) Do the Service Login. Refer to 5-10-2-2 Service Login on page 5-41 . 3.) Select Diagnostics => LOGIQ P5 Diagnosti cs => FRU test => L1SYSCON => L1SYSCON Overall. 4.) Execute the diagnostic test. 5.) All diagnostic test item of L1SYSCON...
Page 134
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 4 - 48 Section 4-9 - Board Function Checks 4-9-5 APS/APS Pro Assy PCB Func tion Validation Procedure NOTE: HVL+ and HVL- are not available for APS PRO. 1.) Turn on the system. 2.) Do the Service Login. Refer to 5-10-2-2 Service Login on page 5-41 . 3.) Select Diagnostics => LOGIQ P5 Diagnostics => FRU test => APS => APS Overall. 4.) Execute the diagnostic test. 5.) All diagnostic test item of APS/APS Pro should be passed. 6.) Shut...
Page 135
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL Section 4-9 - Board Function Checks 4 - 49 4-9-6 P3RLY,P2RLY and P2RLY with Dummy Assy function check procedure 1.) Turn on the system. 2.) After completion of echoloader loading, connect probe on port 1. Refer to 4-3-7-1 Connecting a probe on page 4-12. 3.) Log into “Service Login”. Refer to 5-10-2-2 Service Login on page 5-41 . 4.) Click “Diagnostics” on top menu. 5.) On left folder win dow, select LOGIQ P5 Diagnostics => FRU test...
Page 136
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 4 - 50 Section 4-9 - Board Function Checks 4-9-7 SOM Function Validation Procedure 1.) Turn on the system. 2.) Press the del key in A/N key within 3 sec. to enter BIOS setting mode. 3.) Set the system time and the system Date. 4.) Check the SOM version (HW version & BIOS version) 5.) Press the F10 key to save configuration changes and exit bios mode. The system will restart. 6.) Check the basic function of syst ems different modes....
Page 137
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL Section 4-9 - Board Function Checks 4 - 51 4-9-9 BackPlane Assy Function Validation Procedure 1.) Turn on the system 2.) All of attached ASSY should be tested. 3.) Refer to the 4-9-4 SYSCONML Assy Fu nction Validation Procedure on page 4-47 . 4.) Refer to the 4-9-7 SOM Function Validation Procedure on page 4-50 . 5.) Refer to the 4-9-1 CL1TRX Assy / BL1TRX Assy Function Validation Procedure on page 4-41 . 6.) Refer to the 4-9-6...
Page 138
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 4 - 52 Section 4-9 - Board Function Checks 4-9-10 Nest fan Function Validation Procedure 1.) After replace Nest fan assy, turn on the system. Refer to 3-5-1 Power On/Boot Up on page 3-11. 2.) Confirm the fan rotating with naked eye and chec k the fan operating by rotating sound. No strange sound should be heard. NOTE: Do not close the right EMI bracket and right plastic cover before check the fan operation. 4-9-11 Transbox Function...
Page 139
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL Section 4-9 - Board Function Checks 4 - 53 4-9-13 Transbox Assy Function Validation Procedure 1.) Turn on the system. Refer to 3-5-1 Power On/Boot Up on page 3-11 for power up sequence to check AP950 Assy function. The system must show correct operation as described on sequence. 2)Check the peripheral operation. Refer to Section 4-5 Peripheral Checks on page 4-26 to confirm the peripheral operation. All peripheral must work...
Page 140
GE HEALTHCARE DIRECTION 5394141, REVISION 1 LOGIQ™ P5 SERVICE MANUAL 4 - 54 Section 4-9 - Board Function Checks Section 4-10 Site Log Table 4-11 Site Log DateService personProblemComments